MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) ML18066A3921999-01-29029 January 1999 Forwards Licensee Interpretation of TS Requirements for Performance of SRs as Applied to Instrumentation Channel Calibr.Ltr Established No New Commitments ML18066A3891999-01-28028 January 1999 Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements 1999-09-30
[Table view] |
Text
- consumers Power l'llWUllll&
MIClllliAtn l'llD&RESI Thomas J. Palmi8ano Plant General Manager Pallaadea Nuclear Plant: 2neo Blue Star Memorial Highway, Covert, Ml 49043 January 6, 1997 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCl<ET 50-255 - LICENSE DPR PALISADES PLANT .. . . .. .
REPLY TO NOTICE OF VIOLATION FOR VIOLATION REPORTED IN INSPECTION.
REPORT NO. 50-255/96010 .
NRC Inspection Report No. 50-255/96010, dated December 5, 1996, contains a Notice of Violation which concerns a failure to initiate a condition report upon discovery that.
Palisades was potentially susceptible to the problems noted in NRC Information Notice
- 96-45 .. This Notice of Violation states that Palisades failed to follow the requirements of Administrative Procedure 3.03, "Corrective Action System".
- Consumers Power Company does not agree to this vi9lation and requests that it be withdrawn. Our reasons for disputing the violation are identified in the attachment.
9701130032 970106 PDR ADOCK 05000255 G PDR A CMS' ENERGY COMPANY
2
SUMMARY
Of COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
-Y7'vL- ~
Thomas J. Palmisano Plant General Manager cc Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment
CONSUMERS POWER COMPANY To the best of my knowledge, the contents of this reply to a notice of violation, are truthful and complete.
By ~7>-7~
ThomafJ. Palmisano Plant General Manager Sworn and subscribed to before me this t A-day of jbwtPWJ 1997.
Deborah L. Malins, Notary Public Van Buren County, Michigan
- My commission expires September 17, 2000
ATTACHMENT CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 REPLY TO NOTICE OF VIOLATION 96010 INSPECTION REPORT NO *. 50-255/96010 FAILURE TO INITIATE CORRECTIVE ACTION 4 Pages
REPLY TO NOTICE OF VIOLATION 96010 FAILURE TO INITIATE CORRECTIVE ACTION NRC VIOLATION During an NRC inspection conducted on September 7 through October 18, 1996, a violation of NRC requirements was identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions, n NUREG-1600, the violation is listed below:
- 1. 10CFR50, Appendix B, Criterion V, "Instructions, Procedures , and Drawings,,; **
requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
Licensee procedure 3. 03, "Corrective Action Process," Revision 15, Paragraph
- 7. 1, required that upon discovery of any condition requiring a condition report (CR), an individual shall initiate a CR and immediately hand cany the. CR to the individual's supervisor.
Licensee procedure 3. 03, Attachment 10, "Condition Report Guidelines, n Revision 15, required, in part, "That a condition report should be written whenever: Information from external sources (eg, vendors, INPO, NRC) that indicates a potential problem at Palisades. n .
Contrary to the above:
Licensee staff failed to initiate a CR upon discovery that Palisades was potentially susceptible to the problem described in NRC Information. Notice 96-45 "Potential Common-Mode Post Accident Failure of Containment Coolers."
This is a Severity Level IV violation (Supplement I).
CONSUMERS POWER COMPANY RESPONSE Consumers Power Company (CPCo) contests this violation on the basis that a violation of Administrative Procedure 3.03, "Corrective Action Process," did not occur; and that the plant response to this issue, following issuance of the Information Notice (IN), was reasonable and timely. Therefore, CPCo requests that this violation be withdrawn .
2 BACKGROUND Palisades Industry Experience Revjew Program:
The Palisades' Industry Experience Program, under Administrative Procedure (AP) 3.16, governs the evaluation and corrective actions associated with hundreds of reports issued each year by various utilities, vendors, and regulatory agencie$. NBC INs are processed at Palisades within this Industry Experience Review Program. The time period allowed for evaluation of INs is typically 45 days. If the evaluation determines that the identified issue constitutes a significant issue relative to plant safety, the issue is transferred to a Condition Report (CR) and processed within the Corrective Action System.
Palisades Corrective Action Process:
Administrative Procedure (AP) 3.03 provides requirements for how a CR is processed.
It allows for the judgement of an initiator and a supervisor to distinguish between an issue determined to have potential to be a condition adverse to safety or quality, and an issue that merely represents a question which should be researched. The .exercise of judgement is explicitly acknowledged by the NBC as necessary and appropriate in many documents, including Generic Letter 91-18. *-
Section 7.1 of AP 3.03 contains a requirement for individuals who discover "... any condition requiring a CR. .. " to initiate a CR and to immediately hand carry it to his supervisor. Among the supervisor's responsibilities defined in Section 7 .2, is the responsibility to "Determine that the CR is warranted."
Section 6.0 of AP 3.03 states, in part, "Guidance for the initiation of a CR is listed in Attachment 10." Attachment 10 of AP 3.03, entitled "Condition Report Guidelines",
provides examples of conditions which may warrant use of a Condition Report.
Example 18 states, in part, "A CR should be written whenever: Information from external sources (eg, vendors, INPO, NBC) that indicates a potential problem at Palisades." As stated in Section 18.9.2 of AP 10.51, "Writer's Guideline for Procedures", "'Should' is used to denote actions that are recommended, but not mandatory." Example 18 in Attachment 10 therefore constitutes a recommendation rather than a specific requirement.
In summary, the Corrective Action Process, as described in AP 3.03, does not require a CR at the time the information from external sources is received. It is required once the reported condition is determined to have a potential safety significance at Palisades .
.l 3
Chronological Description of Events A determination was made by Diablo Canyon on February 13, 1996, that their containment fan coolers were susceptible to component cooling water flashing in the cooler unit cooling coils during a design-basis Loss-of-coolant Accident (LOCA) with a concurrent loss of offsite power or with delayed sequencing of safety-related equipment. This was reported to the NRC as Diablo Canyon LER 96-005 dated April 26, 1996. This was a voluntary LER submitted to NRC for information purposes only.
On July 22, 1996, the licensee for Haddam Neck declared all four of its containment air recirculation fans inoperable and initiated a plant shutdown due to a similar concern.
This was also reported to the NRC.
The Palisades Industry Experience Program staff became aware of both events via entries in the INPO NElWORK system. The Haddam Neck event was discussed in the NRC Plant Daily Status dated July 24, 1996, and the Diablo Canyon event was discussed in Operating Experience (OE) 7970 dated August 8, 1996.
The tracking document for the evaluation of OE 7970 was ready to be issued when, on .*
August 13, 1996, IN 96-045 was downloaded from the INPO industry experience data base. The related information was combined and a new traveler was issued on August 13, 1996, for IN 96-045 with the associated information attached. The evaluation due date was set for 9/30/96, applying the standard 45 day period used for IN evaluations.
In order to establish priorities to allow completion of the evaluation within the assigned time period, the IN information was reviewed on August 26, 1996, by the assigned Design Engineer. Information gathering for the evaluation was started on September
.13, 1996, with the in-depth research and evaluation starting on September 17, 1996. A management meeting was held on September 18, 1996, to discuss preliminary
. conclusions about the potential significance of the issue and the decision was made to transfer the issue from the Industry Experience Review Program into the Corrective Action Program. Condition Report C-PAL-96-1063 was finalized on September 20, 1996, and an operability determination was promptly rendered. The IN evaluation was completed within the assigned period.
BASIS FOR DISPUTING THE VIOLATION When the industry experiences related to IN 96-045 and the IN itself was received, they ,
- were entered into our Industry Experience Review Program. The initial screening and processing was handled in an appropriate manner based on our understanding of the
. information at the time. The IN evaluation was performed well within the assigned period. When the evaluation showed the issue to have potential safety significance
4 specifically for Palisades, a Condition Report was promptly issued in accordance with AP 3.03 and an operability determination was promptly rendered.
It is our conclusion that no procedure violations occurred, and that our actions for this*
issue were reasonable and timely. It is therefore CPCo's position that this Notice of Violation should be withdrawn by the NRC .
'..;',