Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18066A18410 June 1998Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period.
ML20217C31024 March 1998Palisades,Review of Actual Fluence Determination
ML18059B06413 June 1994Simulator Four-Yr Test Rept & Schedule for Performance Testing for Next Four-Yr Period.Stroke time
ML18057A92428 February 1991Reactor Containment Bldg Integrated Leak Rate Test, Feb 1991,Special Rept.
ML18054A5323 February 1989Reactor Containment Bldg Integrated Leak Rate Test,Nov 1988, Special Rept 13
ML18054A55231 January 1989Cycle 8 Startup Physics Test Rept. W/890217 Ltr
ML18052A39730 April 1986Special Rept 12, Reactor Containment Bldg Integrated Leak Rate Test,Jan 1986.
ML18051B28131 December 1984Reactor Internals Noise Monitoring Tests.
ML18051B23331 December 1984Suppl to Physics Testing Rept for Cycle 6 Startup.
ML18051B10331 October 1984Physics Testing Rept for Cycle 6 Startup.
ML18051A79231 December 1983Reactor Internals Noise Monitoring Tests, 1983
ML18051A30231 January 1983Reactor Internals Noise Monitoring Test, 1982
ML18047A43531 July 1982Generator Tube Leak Outage Rept of Eddy Current Results.
ML18047A35231 May 1982Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept.Loop seal
Stroke time
ML18047A46130 April 1982EPRI PWR Safety & Relief Valve Test Program:Safety & Relief Valve Test Rept, Interim ReptLoop seal
Stroke time
ML18047A29214 April 1982Physics Testing Rept for Cycle 5 Start-up.
ML18047A35331 March 1982EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1Boric Acid
ML18046B37428 February 1982Reactor Containment Bldg Integrated Leakage Rate Test.
ML18046B32724 February 1982Reactor Internals Noise Monitoring Tests,Jan-Dec 1981.
ML18046B15915 December 1981Lab Rept,Battery Section,Ieee 323 Qualification.
ML18046B20611 December 1981Control Rod Drive Mechanism Dynamic Analysis Rept. Info Re Seismic Analysis of Reactor Internals,Diesel Generator Fuel Oil Day Tanks,Essential Water Svc Pumps Safety Injection Tank & Reactor Coolant Pump Also Encl
ML18046B08031 October 1981Containment Bldg Post-Accident Sys 10-Yr Surveillance Rept.
ML18046B08431 July 1981Sheathing Filler Rept.
ML18046A8536 July 1981Control Rod Drive Mechanism Dynamic Analysis Rept.Earthquake
ML18045A54831 July 1980Physics Testing Rept for Core 4 Startup.
ML18045A2931 July 1980Rept on Endurance Testing of Auxiliary Feedwater Pumps.
ML18044A53911 February 1980Results of Insp & Testing Program in Response to IE Bulletin 79-02 & Revisions (for Interim Plant Operations) for CPC Facility in South Haven,Mi, Revision 0High Radiation Area
ML19296B0478 February 1980RCS Asymmetric Loads Evaluation Program;Interim Rept.
ML18044A54031 January 1980Results & Evaluation of Tests on Phillips Red Head Self- Drilling Expansion Anchors for CPC Facility in South Haven, Mi.Breakaway torque
Earthquake
ML18045A22230 November 1979Reactor Internals Noise Monitoring Tests Nov 1978-Nov 1979.
ML18044A37828 February 1979Rept of Seismic Vibration Testing of Various Electrical Items for B&W Under Purchase Order 033788LG.
ML18043A49031 January 1979Reactor Internals Noise Monitoring Tests for Period Apr- Oct 1978 (First 6 Full Months of Core 3)
ML18044A34330 November 1970Containment Bldg Structural Integrity Test.
ML18044A3445 October 1970Deformation Measurements During Containment Pressure Test.