Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18066A184 | 10 June 1998 | Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. | |
ML20217C310 | 24 March 1998 | Palisades,Review of Actual Fluence Determination | |
ML18059B064 | 13 June 1994 | Simulator Four-Yr Test Rept & Schedule for Performance Testing for Next Four-Yr Period. | Stroke time |
ML18057A924 | 28 February 1991 | Reactor Containment Bldg Integrated Leak Rate Test, Feb 1991,Special Rept. | |
ML18054A532 | 3 February 1989 | Reactor Containment Bldg Integrated Leak Rate Test,Nov 1988, Special Rept 13 | |
ML18054A552 | 31 January 1989 | Cycle 8 Startup Physics Test Rept. W/890217 Ltr | |
ML18052A397 | 30 April 1986 | Special Rept 12, Reactor Containment Bldg Integrated Leak Rate Test,Jan 1986. | |
ML18051B281 | 31 December 1984 | Reactor Internals Noise Monitoring Tests. | |
ML18051B233 | 31 December 1984 | Suppl to Physics Testing Rept for Cycle 6 Startup. | |
ML18051B103 | 31 October 1984 | Physics Testing Rept for Cycle 6 Startup. | |
ML18051A792 | 31 December 1983 | Reactor Internals Noise Monitoring Tests, 1983 | |
ML18051A302 | 31 January 1983 | Reactor Internals Noise Monitoring Test, 1982 | |
ML18047A435 | 31 July 1982 | Generator Tube Leak Outage Rept of Eddy Current Results. | |
ML18047A352 | 31 May 1982 | Epri/Marshall Electric Motor Operated Valve (Block Valve), Interim Test Data Rept. | Loop seal Stroke time |
ML18047A461 | 30 April 1982 | EPRI PWR Safety & Relief Valve Test Program:Safety & Relief Valve Test Rept, Interim Rept | Loop seal Stroke time |
ML18047A292 | 14 April 1982 | Physics Testing Rept for Cycle 5 Start-up. | |
ML18047A353 | 31 March 1982 | EPRI Summary Rept:Westinghouse Gate Valve Closure Testing Program, Revision 1 | Boric Acid |
ML18046B374 | 28 February 1982 | Reactor Containment Bldg Integrated Leakage Rate Test. | |
ML18046B327 | 24 February 1982 | Reactor Internals Noise Monitoring Tests,Jan-Dec 1981. | |
ML18046B159 | 15 December 1981 | Lab Rept,Battery Section,Ieee 323 Qualification. | |
ML18046B206 | 11 December 1981 | Control Rod Drive Mechanism Dynamic Analysis Rept. Info Re Seismic Analysis of Reactor Internals,Diesel Generator Fuel Oil Day Tanks,Essential Water Svc Pumps Safety Injection Tank & Reactor Coolant Pump Also Encl | |
ML18046B080 | 31 October 1981 | Containment Bldg Post-Accident Sys 10-Yr Surveillance Rept. | |
ML18046B084 | 31 July 1981 | Sheathing Filler Rept. | |
ML18046A853 | 6 July 1981 | Control Rod Drive Mechanism Dynamic Analysis Rept. | Earthquake |
ML18045A548 | 31 July 1980 | Physics Testing Rept for Core 4 Startup. | |
ML18045A293 | 1 July 1980 | Rept on Endurance Testing of Auxiliary Feedwater Pumps. | |
ML18044A539 | 11 February 1980 | Results of Insp & Testing Program in Response to IE Bulletin 79-02 & Revisions (for Interim Plant Operations) for CPC Facility in South Haven,Mi, Revision 0 | High Radiation Area |
ML19296B047 | 8 February 1980 | RCS Asymmetric Loads Evaluation Program;Interim Rept. | |
ML18044A540 | 31 January 1980 | Results & Evaluation of Tests on Phillips Red Head Self- Drilling Expansion Anchors for CPC Facility in South Haven, Mi. | Breakaway torque Earthquake |
ML18045A222 | 30 November 1979 | Reactor Internals Noise Monitoring Tests Nov 1978-Nov 1979. | |
ML18044A378 | 28 February 1979 | Rept of Seismic Vibration Testing of Various Electrical Items for B&W Under Purchase Order 033788LG. | |
ML18043A490 | 31 January 1979 | Reactor Internals Noise Monitoring Tests for Period Apr- Oct 1978 (First 6 Full Months of Core 3) | |
ML18044A343 | 30 November 1970 | Containment Bldg Structural Integrity Test. | |
ML18044A344 | 5 October 1970 | Deformation Measurements During Containment Pressure Test. |