MONTHYEARL-15-150, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052015-05-27027 May 2015 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI L-15-325, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052015-11-0606 November 2015 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI L-15-371, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052015-12-21021 December 2015 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI L-16-058, Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052016-02-24024 February 2016 Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Supplement ML16099A0112016-03-0303 March 2016 NRR E-mail Capture - Draft 3rd Round PRA RAIs - Beaver Valley Units 1 & 2 - NFPA-805 LAR (CAC Nos. MF3301 & MF3302) Project stage: Draft RAI ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI ML16089A0622016-03-30030 March 2016 Meeting to Discuss BVPS Draft PRA RAI - Slides Project stage: Request ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI ML16105A0082016-04-25025 April 2016 March 30, 2016, Summary of Meeting with Firstenergy Nuclear Operating Company on Its Draft Probabilistic Risk Assessment RAI Related to Its License Amendment Request to Adopt NFPA Standard 805 Project stage: Draft RAI L-16-162, Response to Requests for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, and Request to Change Implementation Schedule2016-05-12012 May 2016 Response to Requests for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, and Request to Change Implementation Schedule Project stage: Response to RAI ML16158A0022016-06-0101 June 2016 NRR E-mail Capture - Beaver Valley, Units 1 & 2 - Update on NFPA 805 (CAC Nos. MF3301 & MF3302) Project stage: Other ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI L-17-024, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052017-01-30030 January 2017 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI L-17-197, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052017-06-23023 June 2017 Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Supplement ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request Project stage: RAI ML17313A6422017-11-0909 November 2017 Transmittal of Draft Safety Evaluation for Proposed Amendments Transition to NFPA 805 (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) Project stage: Draft Approval ML17335A0962017-11-27027 November 2017 NRR E-mail Capture - Beaver Valley: NFPA 805 LAR: License Condition: Fire Protection Program Changes That Have More than Minimal Risk Impact (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) Project stage: Other ML18058A9422017-12-11011 December 2017 NFPA 805 Amendment Application Transition License Condition Project stage: Other ML17291A0812018-01-22022 January 2018 Issuance of Amendments Transition to NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (CAC Nos. MF3301 and MF3302; EPID L-2013-LLF-0001) Project stage: Approval ML18058B0722018-02-23023 February 2018 BVPS NFPA 805 License Amendment Change Requested, and Other SE Comments Project stage: Other ML18059A7982018-02-26026 February 2018 BVPS NFPA 805 License Amendment Change Requested, and Other SE Comments Project stage: Other ML18058A9852018-02-27027 February 2018 BVPS-1 License Condition Page Project stage: Other ML18058A9532018-02-27027 February 2018 Comments on BVPS SE Project stage: Other ML18065A4032018-04-0505 April 2018 Correction of Errors in Safety Evaluation Associated with License Amendment Nos. 301 and 190 Project stage: Approval ML18099A2322018-04-18018 April 2018 Correction of an Error in the Renewed Facility Operating License No. DPR-66 Associated with License Amendment No. 301 CAC No. MF3301; EPID L-2013-LLF-0001) Project stage: Other 2016-06-01
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML20323A0182020-11-18018 November 2020 Corrected Final Scenarios 1 2 3. (Folder 3) ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC L-20-191, Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen)2020-06-24024 June 2020 Energy Harbor - Enclosed May 2020 NPDES Discharge Monitoring Report, Beaver Valley Power Station & Supplemental Monitoring Data for Outfall 001 (Dissolved Oxygen) ML20140A3352020-04-22022 April 2020 Steam Generator Tube Inspection Discussion Points for April 22, 2020, Teleconference with Energy Harbor Nuclear Corp. and NRC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML18058A9532018-02-27027 February 2018 Comments on BVPS SE ML18058A9852018-02-27027 February 2018 BVPS-1 License Condition Page L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16090A2312016-03-21021 March 2016 Aam Open House, Sign-in Sheets, March 21, 2016 ML15104A6922015-04-0909 April 2015 Aam Attendance List, April 9 2015 ML14098A2132014-04-0303 April 2014 Aam 2014, Sign-in Sheet ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 L-14-147, ODCM: Index, Matrix and History of ODCM Changes2013-03-20020 March 2013 ODCM: Index, Matrix and History of ODCM Changes ML12230A2312012-08-15015 August 2012 Attachment 2 - L-12-287, Response to NRC Request for Additional Information Regarding 10 CFR 50.46, 30-Day Report ML12164A7992012-06-11011 June 2012 Attachment 2 to L-12-184, Response to NRC Request for Additional Information Regarding 10 CFR 50.46, 30-Day Report (Non-proprietary Version) ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status L-05-080, Exhibit D (Part 4): Excerpt from the Beaver Valley and Perry 2005 License Transfer Application2011-06-13013 June 2011 Exhibit D (Part 4): Excerpt from the Beaver Valley and Perry 2005 License Transfer Application ML1112305642011-04-28028 April 2011 Aam Attendance List, April 28, 2011 ML1013303522010-05-13013 May 2010 Attendance Signing Sheet for Annual Assessment Meeting 5-4-2010 ML1009103152010-03-31031 March 2010 Sign-in Sheet for FENOC Meeting 3-31-10 ML0929305002009-10-24024 October 2009 Response to Citizen Power Issues ML0909202522009-03-31031 March 2009 Public Meeting Sign-in Sheet, 3/31/2009 L-09-028, Response to Request for Additional Information the 2008 Steam Generator Tube Inspection Report2009-02-20020 February 2009 Response to Request for Additional Information the 2008 Steam Generator Tube Inspection Report L-08-229, Responses to a Request for Additional Information in Support of License Amendment Request No. 07-0052008-08-0101 August 2008 Responses to a Request for Additional Information in Support of License Amendment Request No. 07-005 ML0808801572008-03-25025 March 2008 Beaver Valley Annual Assessment, Sign-in Sheets ML0804603992008-02-13013 February 2008 Power Reactor Inattentive Officer Findings 2004-Present ML0735202772007-12-17017 December 2007 Ohio Natural Heritage Data Request for Beaver Valley Power Station License Renewal ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726705012007-09-18018 September 2007 EPU I&C Questions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0712307312007-04-25025 April 2007 Attendance Roster from Annual Assessment Public Meeting ML0634705992006-12-14014 December 2006 Plant Service List ML0611603672006-04-25025 April 2006 Fenco Security Working Hours and Fatigue; Procedure No. NOP-LP-1005, Rev 0 ML0535402882005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment No. 13 to Indemnity Agreement B73 ML0611605532005-03-24024 March 2005 NRC Inspection Report 2005-004 Meeting Attendees ML0611604822005-03-22022 March 2005 NRC Inspection Report 2005-04 Meeting Attendees ML0611603792005-02-24024 February 2005 NRC Telecon Listing ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0325214292003-08-20020 August 2003 Westinghouse - Nuclear Safety Advisory Letter NSAL-03-6, High Net Heat Input, Dated 08/20/2003 ML0403406452003-06-19019 June 2003 Corrective Action of CR 02-00921, Design Engineering Will Coordinate a Review of Time Limits for Critical Actions with Operations Personnel and as a Part of the Site Latent Issue Review Program Validate Associated Fire Protection Time Criti ML0403406142003-05-23023 May 2003 Corrective Action of CR 02-00921, Due Date Extension ML0403406092003-05-22022 May 2003 Corrective Action of CR 02-00921, Due Date Extension ML0403406362003-05-14014 May 2003 Corrective Action of CR 02-00921, Due Date Extension ML0403406202003-05-14014 May 2003 Corrective Action of CR 02-00921, Due Date Extension ML0227704292002-09-26026 September 2002 Draft Response to 2nd RAI for Beaver Valley, Unit 2 Fresh Fuel Rack Study 2020-06-25
[Table view] |
Text
2. Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact.
The licensee may use its screening process as approved in the NRC SE dated January 22, 2018, to determine that certain fire protection program changes meet the minimal criterion.
The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection prog ram.
(c) Transition License Conditions
- 1. Before achieving full compliance with 10 CFR 50.48(c), as specified by (2) below, risk-informed changes to the licensee's fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in (2) above.
- 2. The licensee shall implement the Unit 1 modifications to its facility, as described in Attachment S, Table S-2, "Plant Modifications Committed, " in FENOC letter L-17-122, dated April 21, 2017, to complete the transition to full compliance with 10 CFR 50.48(c), by the completion of the second Unit 1 refueling outage after issuance of the safety evaluation. The licensee shall maintain appropriate compensatory measu res in place until completion of these modifications.
- 3. The licensee shall implement the items listed in Attachment S, Table S-3, "Implementation Items," of FENOC letter L-17-268, dated August 22, 2017, by 12 months after issuance of the safety evaluation (with the exception of Items BV1-1633, BV1-2974, BV1-3060, BV1-3108, BV1 -3109, BV2-1580, BV2- 1622, BV2-1623, and BV2-1750, which are to be completed by the end of the second Unit 1 refueling outage after issuance of the safety evaluation).
(6) Systems Integrity FENOC shall implement a program to reduce leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. This program shall include the following :
- 1. Provisions establishing preventive maintenance and periodic visual inspection requirements, and
- 2. Integrated leak test requirements for each system at a frequency not to exceed refueling cycle intervals.
Amendment No. 301 Beaver Valley Unit 1 Renewed Operating License DPR-66