MONTHYEARML23180A1512023-06-29029 June 2023 LLC, Request for Exemption to the Reporting Requirements of 10 CFR 50.46(a)(3) ML21102A3072021-04-15015 April 2021 OEDO-21-00155 - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC, Small Modular Reactor ML21050A4312021-02-19019 February 2021 LLC - Lessons-Learned from the Design Certification Review of the NuScale Power, LLC Small Modular Reactor ML20247J5642020-09-11011 September 2020 Standard Design Approval for the NuScale Power Plant Based on the NuScale 600 Standard Plant Design Certification Application ML20231A8042020-08-28028 August 2020 Final Safety Evaluation Report for the NuScale Standard Plant Design ML20224A4602020-08-25025 August 2020 OEDO-20-00292-Response to the Advisory Committee on Reactor Safeguards Letter on NuScale Power, LLC, Report on the Safety Aspects of the NuScale Small Modular Reactor ML20231A5982020-08-25025 August 2020 OEDO-20-00285_NuScale Area of Focus - Boron Redistribution ML20210M8902020-07-29029 July 2020 Area of Focus - Boron Redistribution ML20195A5872020-07-13013 July 2020 LLC - Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors ML20195C7662020-07-13013 July 2020 LLC Request for Standard Design Approval Based on the NuScale Standard Plant Design Certification Application ML20192A3262020-07-10010 July 2020 LLC, Submittal of Environmental Report: Revision Status ML20198M3932020-07-0202 July 2020 LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 ML20174A3472020-07-0101 July 2020 OEDO-20-00220 - Area of Focus - Probabilistic Risk Assessment and Emergency Core Cooling System Valve Performance ML20184A2872020-07-0101 July 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and General Design Criterion 33, PM-0720-70785, Revision 0 ML20181A4322020-06-22022 June 2020 Final SER for NuScale TR-0516-49416 NON-Loss-of-Coolant Analysis Model, Rev 3 (Letter) ML20181A2702020-06-22022 June 2020 Final SER for NuScale TR-0516-49422 Loss-of-Coolant Analysis Model, Rev 2 (Letter) ML20198M3922020-06-19019 June 2020 LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 ML20171A7312020-06-19019 June 2020 LLC, Submittal of Riser Flow Hole Methodology and Associated Changes to Final Safety Analysis Report Incorporating Its Use ML20157A2232020-06-0303 June 2020 Letter to NuScale Requesting -A for TR-0716-50350 ML20150C5172020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled NRC Public Meeting Presentation: Boron Redistribution and Associated Design and DCA Changes, PM-0620-70336, Revision 0 ML20150E1772020-05-29029 May 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Extended Dhrs Operation and RCS Boron Redistribution (Closed Session), PM-0620-70243, Revision 0 ML20150C8812020-05-29029 May 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topic - Boron Redistribution and Associated Design and DCA Changes, PM-0620-70244, Revision 0 ML20149M1192020-05-28028 May 2020 LLC Summary of Impacts to Erai 8930 Response and Discussion on the Exemption from General Design Criterion 33 ML20141L8082020-05-20020 May 2020 LLC Submittal of Containment Response Analysis Methodology Technical Report, TR-0516-49084, Revision 3 ML20141N0122020-05-20020 May 2020 LLC Submittal of Changes to Final Safety Analysis Report, Section 6.2, Containment Systems, Section 6.3, Emergency Core Cooling System, and Technical Report TR-0516-49084, Containment Response Analysis Methodology Technical Report ML20141M7642020-05-20020 May 2020 LLC Submittal of Nuclear Steam Supply System Advanced Sensor Technical Report, TR-0316-22048, Revision 3 ML20141L7872020-05-20020 May 2020 LLC, Submittal of Second Updates to Standard Plant Design Certification Application, Revision 4 ML20141L8162020-05-20020 May 2020 LLC, Submittal of Long-Term Cooling Methodology, TR-0916-51299, Revision 3 ML20141M1142020-05-20020 May 2020 LLC Submittal of NuScale Instrument Setpoint Methodology Technical Report, TR-0616-49121, Revision 3 ML20141L8042020-05-20020 May 2020 LLC Submittal of Technical Specifications Regulatory Conformance and Development, TR-1116-52011, Revision 4 ML20128J3162020-05-18018 May 2020 OEDO-20-00167 - Response to the ACRS Letter on Combustible Gas Monitoring ML20133K0882020-05-12012 May 2020 LLC, Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution (Closed Session), PM-0420-69512, Revision 0 ML20133J9142020-05-11011 May 2020 LLC Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0420-69511, Revision 0 ML20112F4552020-05-0101 May 2020 LLC, Design Certification Application Phases 5 and 6 Review Status ML20107F8492020-05-0101 May 2020 OEDO-2000140 - NuScale Area of Focus - Helical Tube Steam Generator Design ML20104A0792020-04-27027 April 2020 OEDO-20-00115 - Safety Evaluation Report for Topical Report TR-0516-49416, Revision 2, Non-Loss-of-Coolant Accident Analysis Methodology ML20099H0802020-04-0808 April 2020 LLC - Submittal of Presentation Materials Entitled NRC Public Meeting: Revisions to Nuscale'S EPZ Sizing Methodology Topical Report, PM-0420-69598, Revision 0 ML20098G2372020-04-0707 April 2020 Nuscale Power, LLC Submittal of Remaining Closure Items for the Emergency Core Cooling System Valve Failure Mode Effects Analysis Audit Items ML20097F1922020-04-0606 April 2020 Nuscale Power, LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: Nuscale Topic - Hydrogen/Oxygen Monitoring, PM-0420-69518, Revision 0 ML20094H6742020-04-0303 April 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation NuScale Topic-Probabilistic Risk Assessment with a Focus on Emergency Core Cooling System Analysis PM-0420-69559, Revision 0 ML20092L8992020-04-0101 April 2020 LLC - Submittal of Updates to Standard Plant Design Certification Application, Revision 4 ML20072M6682020-03-30030 March 2020 Response to NuScale Letter Dated February 24, 2020, on Planned SDA Application Content ML20072H3332020-03-0909 March 2020 LLC - Submittal of Presentation Materials Entitled Public Meeting Presentation: Topic - Emergency Core Cooling System (ECCS) Boron Distribution, PM-0320-69218, Revision 0 ML20057D9002020-03-0606 March 2020 Submittal of Errata to Final SE for NuScale Power, LLC TR-1010-859-NP-A, Quality Assurance Program Description for the NuScale Power Plant ML20062F7262020-03-0505 March 2020 Request for Withholding Information from Public Disclosure for Nuscale Power, LLC Letter Public ML20069A1572020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Rod Ejection Accident Methodology, PM-0320-69146, Revision 0 ML20069A1772020-03-0404 March 2020 LLC - Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report-Non-Loss-of-Coolant Accident, PM-0320-69141, Revision 0 ML20069A9632020-03-0404 March 2020 LLC Submittal of Presentation Materials Entitled ACRS Full Committee Presentation: NuScale Topical Report, Loss-of-Coolant Accident Evaluation Model, PM-0320-69138, Revision 0 ML20066G2802020-03-0303 March 2020 LLC, Submittal of Presentation Materials Entitled ACRS Subcommittee Presentation: NuScale Topic - Hydrogen Monitoring, PM-0220-69071, Revision 0 ML20066G2882020-02-28028 February 2020 LLC Submittal of Presentation Materials Titled ACRS Full Committee Presentation: NuScale - Steam Generator Design (Closed Session), PM-0220-69053, Revision 0 2023-06-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRAIO-0420-69855, LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification2020-04-30030 April 2020 LLC, Submittal of Corrected Response to NRC Request for Additional Information No. 284 (Erai No. 9225) on the NuScale Design Certification ML19332A1202019-11-27027 November 2019 LLC Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19304B4712019-10-31031 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 466 (Erai No. 9482) on the NuScale Design Certification Application ML19296D8052019-10-23023 October 2019 LLC Response to NRC Request for Additional Information No. 526 (Erai No. 9719) on the NuScale Design Certification Application ML19283E5302019-10-10010 October 2019 LLC Supplemental Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19260G7352019-10-0707 October 2019 Summary of Public Meeting with NuScale to Discuss Response to RAI 9681 ML19266A5872019-09-23023 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 518 (Erai No. 9659) on the NuScale Design Certification Application ML19262G9742019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Tier 1, Section 3.11, Reactor Building and Section 3.13, Control Building, and Tier 2, Section 3.8.4, Design of Category I Structure and Section 14.3, Certified ... ML19262G5762019-09-19019 September 2019 LLC - Submittal of Changes to Final Safety Analysis Report, Section 14.2, Initial Plant Test Program, Table 14.2-2, Pool Cleanup Systems Test #2, and Table 14.2-50, Module Assembly Equipment Test #50 ML19259B8102019-09-16016 September 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19259A0922019-09-16016 September 2019 LLC Response to NRC Request for Additional Information No. 525 (Erai No. 9705) on the NuScale Design Certification Application ML19238A3722019-08-26026 August 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19238A3662019-08-23023 August 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19215A0032019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19215A0062019-08-0202 August 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 441 (Erai No. 9485) on the NuScale Design Certification Application ML19212A7622019-07-31031 July 2019 LLC Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19212A3752019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 483 (Erai No. 9516) on the NuScale Design Certification Application ML19212A7992019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19212A6892019-07-31031 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 205 (Erai No. 9044) on the NuScale Design Certification Application ML19210D1592019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19210D7342019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 520 (Erai No. 9642) on the NuScale Design Certification Application ML19210E1462019-07-29029 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19207B3812019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 427 (Erai No. 9408) on the NuScale Design Certification Application ML19207A5342019-07-26026 July 2019 LLC - Response to NRC Request for Additional Information No. 523 (Erai No. 9682) on the NuScale Design Certification Application ML19207B8522019-07-25025 July 2019 LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application ML19203A3152019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19203A3212019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 333 (Erai No. 9282) on the NuScale Design Certification Application ML19203A3092019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 54 (Erai No. 8837) on the NuScale Design Certification Application ML19203A3422019-07-22022 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 154 (Erai No. 8938) on the NuScale Design Certification Application ML19200A2482019-07-19019 July 2019 LLC Response to NRC Request for Additional Information No. 522 (Erai No. 9681) on the NuScale Design Certification Application ML19200A2082019-07-19019 July 2019 LLC - Response to NRC Request for Additional Information No. 524 (Erai No. 9691) on the NuScale Design Certification Application ML19199A1172019-07-18018 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 484 (Erai No. 8930) on the NuScale Design Certification Application ML19198A3252019-07-17017 July 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 249 (Erai No. 9135) on the NuScale Design Certification Application ML19196A3682019-07-15015 July 2019 LLC Response to NRC Request for Additional Information No. 516 (Erai No. 9647) on the NuScale Design Certification Application ML19191A2202019-07-10010 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 197 (Erai No. 9051) on the NuScale Design Certification Application ML19184A6152019-07-0303 July 2019 LLC Supplemental Response to NRC Request for Additional Information No. 386 (Erai No. 9316) on the NuScale Design Certification Application ML19176A5802019-06-25025 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19170A3702019-06-19019 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19168A2442019-06-17017 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 325 (Erai No. 9268) on the NuScale Design Certification Application ML19164A1452019-06-13013 June 2019 LLC - Submittal of Containment Response Analysis Methodology Technical Report, TR-0516 -49 08 4, Revision 1 ML19157A3262019-06-0606 June 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 232 (Erai No. 9113) on the NuScale Design Certification Application ML19154A6222019-06-0303 June 2019 LLC Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on the NuScale Design Certification Application ML19154A6052019-06-0303 June 2019 LLC Response to NRC Request for Additional Information No. 514 (Erai No. 9645) on the NuScale Design Certification Application ML19151A8372019-05-31031 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 377 (Erai No. 9380) on the NuScale Design Certification Application ML19140A4592019-05-20020 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application ML19137A2902019-05-17017 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 156 (Erai No. 9031) on the NuScale Design Certification Application ML19137A2872019-05-15015 May 2019 LLC Response to NRC Request for Additional Information No. 519 (Erai No. 9656) on the NuScale Design Certification Application ML19126A2942019-05-0606 May 2019 LLC Supplemental Response to NRC Request for Additional Information No. 26 (Erai No. 8840) on the NuScale Design Certification Application ML19122A5092019-05-0202 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 494 (Erai No. 9548)on the Design Certification Application ML19121A6002019-05-0101 May 2019 LLC - Supplemental Response to NRC Request for Additional Information No. 202 (Erai No. 8911) on Design Certification Application 2020-04-30
[Table view] |
Text
RAIO-0218-58884 February 27, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
NuScale Power, LLC Response to NRC Request for Additional Information No.
326 (eRAI No. 9266) on the NuScale Design Certification Application
REFERENCE:
U.S. Nuclear Regulatory Commission, "Request for Additional Information No.
326 (eRAI No. 9266)," dated January 08, 2018 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) response to the referenced NRC Request for Additional Information (RAI).
The Enclosure to this letter contains NuScale's response to the following RAI Questions from NRC eRAI No. 9266:
12.02-12 12.02-13 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.
If you have any questions on this response, please contact Steven Mirsky at 240-833-3001 or at smirsky@nuscalepower.com.
Sincerely, Zackary W. Rad Zackary Director, Regulatory Affairs NuScale Power, LLC Distribution: Samuel Lee, NRC, OWFN-8G9A Anthony Markley, NRC, OWFN-8G9A Prosanta Chowdhury NRC, OWFN-8G9A : NuScale Response to NRC Request for Additional Information eRAI No. 9266 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
RAIO-0218-58884 :
NuScale Response to NRC Request for Additional Information eRAI No. 9266 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9266 Date of RAI Issue: 01/08/2018 NRC Question No.: 12.02-12 Regulatory Basis 10 CFR 52.47(a)(5) requires applicants to identify the kinds and quantities of radioactive materials expected to be produced during operation and the means for controlling and limiting radiation exposures within the limits set forth in 10 CFR Part 20.
10 CFR 20.1101(b) and 10 CFR 20.1003, require the use of engineering controls to maintain exposures to radiation as far below the dose limits in 10 CFR 20 as is practical. The requirements of 10 CFR 20.1204, Determination of Internal Exposure; 10 CFR 20.1701, Use of Process or Other Engineering Controls; and 10 CFR 20.1702, Use of Other Controls, specify the use of design features such as the use of ventilation for controlling the intake of radioactive materials. NuScale DSRS section 12.2, Radiation Source, regarding the identification of isotopes and the methods, models and assumptions used to determine dose rates. The Acceptance Criteria provided in NuScale DSRS section 12.3, Radiation Protection Design Feature, provides guidance to the staff for evaluating the potential for airborne radioactivity areas within the facility.
Background
NuScale Design Control Document (DCD) Tier 2 Revision 0, Subsection 12.2.2.1, Reactor Building Atmosphere, states that airborne radioactivity may be present in the RXB atmosphere due to reactor pool evaporation or primary coolant leakage. The airborne concentration is modeled as a buildup to an equilibrium concentration given the production and removal rate.
The airborne concentration in the air space above the reactor pool is determined by using the peak reactor pool water source term. The input parameters are listed in Table 12.2-32 Input Parameters for Determining Facility Airborne Concentrations. DCD Table 12.2-32 lists the pool evaporation rate at 1705 lbm/hour.
Based on information made available to the staff during the RPAC Chapter 12 Audit, the staff determined that the stated evaporation rate was based on assumed air flow rates over the pool surface, and an assumed temperature of the ultimate heat sink (UHS) water. The staff determined that the NuScale Technical Specifications 3.5.3, Ultimate Heat Sink, bulk average NuScale Nonproprietary
temperature limit of 140 ºF was significantly greater than the temperature assumed for determining the evaporation rate. As the pool temperature increases, the pool evaporation rate increases. The assumed pool temperature is not listed in DCD Table 12.2-32.
As stated, the assumed evaporation rate is based on an assumed air flow rate over the pool surface, however, this value is not listed in DCD Table 12.2-32. Also, based on information made available to the staff during the RPAC Chapter 12 Audit, the staff was not able to ascertain the bases of the assumed air flow rate above the UHS pool. It is not clear to the staff what conditions (e.g., ventilation supply and exhaust flow rates etc.) are assumed in order to meet the stated flow conditions.
Based on information made available to the staff during the RPAC Chapter 12 Audit, the staff also noted that the atmospheric conditions (e.g., temperature and humidity) inside of the RXB were inputs to the methodology used by the applicant to determine the evaporation rates. The staff reviewed DCD Section 9.4, Air Conditioning, Heating, Cooling, and Ventilation Systems, and DCD Section 9.4.2, Reactor Building and Spent Fuel Pool Area Ventilation System, and was unable to find any reference to the conditions used to establish the assumed evaporation rate.
Key Issue 1:
The DCD does not contain the information necessary for the staff to perform their evaluation of airborne activity as stated above.
Question 1:
To facilitate staff understanding of the application information sufficient to make appropriate regulatory conclusions with respect to radiation exposures, the staff requests that the applicant:
Revise, as necessary, DCD Table 12.2-32 to include all of the parameters needed to calculate the RXB airborne tritium, and other radionuclide concentrations, As necessary revise DCD Sections 9.4.2 and DCD Section 12.2.1.8 to describe the bases for the assumed pool air flow rate, As necessary revise DCD Sections 9.4.2 to describe the design features provided for maintaining the required air flow rate over the pool, As necessary, revise DCD 12.2.1.8 to describe how this value is to be assessed, OR Provide the specific alternative approaches used and the associated justification.
NuScale Response:
10 CFR 20.1101(b) and 10 CFR 20.1003 allow the use of both procedures and engineering controls to maintain exposures to radiation as far below the dose limits in 10 CFR Part 20 as is NuScale Nonproprietary
practical. As in the case of operating licensed nuclear power plants and previously NRC-approved design certification applications, the facility's design features work in concert with the radiation protection programs and procedures to comply with this regulation. Operational procedures are frequently relied upon to comply with regulations.
The calculated airborne activity in the airspace above the reactor pool water is based on an evaporation rate from the reactor pool while the pool water temperature is at the design basis temperature for the Reactor Building HVAC (RBV) system, which is 100°F. Above this temperature, the RBV system may be unable to adequately cool the Reactor Building atmosphere, thereby potentially resulting in compensatory measures, such as increasing pool heat removal via the pool cooling systems, to return the pool water temperature below 100°F.
As always, the radiation protection programs would also employ the necessary measures to ensure radiation exposures are as low as reasonably achievable, and in compliance with regulations.
The RBVS was designed to operate and accommodate pool water temperatures (for extended periods of time) at, or less than, 100°F. The pool water evaporation rate at 100°F is calculated using the 2007 ASHRAE Handbook Applications Manual, Chapter 4, equation 1.
wp = (pw - pa)(95 + 0.425V) where:
wp = evaporation rate A = area of pool surface Y = latent heat of evaporation pw = saturation vapor pressure of water pa = saturation pressure at room air dew point V = air velocity over water surface The inputs to this equation include the surface area of the pool surface, and the air velocity over the water surface. Air conditions over the pool are assumed to be the midpoint between the NuScale Nonproprietary
RBV supply air condition and final room air condition, when plotted on the psychrometric chart.
The NuScale engineering calculations are available for NRC audit.
Impact on DCA:
There are no impacts to the DCA as a result of this response.
NuScale Nonproprietary
Response to Request for Additional Information Docket No.52-048 eRAI No.: 9266 Date of RAI Issue: 01/08/2018 NRC Question No.: 12.02-13 The Regulatory Basis and Background are in RAI-9266 Question 30992 Key Issue 2:
Because the methodology used by the applicant to calculate the evaporation rate from the UHS pool water appears to use non- bounding values, it may underestimate the total evaporation of tritium and other radionuclides from the UHS pool water. Since airborne concentrations in the RXB are directly dependent on the UHS pool evaporation rate, the airborne activity concentrations in the RXB may be underestimated. The concentrations described in Chapter 12.2 for the RXB are for the purpose of radiation protection, and should be based on appropriately conservative assumptions (e.g., UHS bulk average temperature at 140 ºF). Other related parameters should be based on assumed bounding values, and the basis for those assumptions should be clearly stated.
Question 2:
To facilitate staff understanding of the application information sufficient to make appropriate regulatory conclusions with respect to radiation exposures, the staff requests that the applicant:
Establish bounding values to be used for determining radiation protection airborne concentrations in the RXB resulting from UHS pool evaporation.
Using the bounding values, calculate the evaporation rate, and the subsequent RXB airborne activity concentration calculations, As necessary, revise DCD Section 12.2.1.8 to include a description of the revised methodology, that reflect the assumptions related to the evaporation rate from the pool, As necessary, revise DCD Section 12.2.2, Airborne Radioactive Material Sources, to include a description of the revised methodology, that reflect the assumptions related to the evaporation rate from the pool, As necessary, revise DCD Section 12.2.2 to clearly state the bounding assumptions for maintaining RXB airborne concentration limits within the limits of 10 CFR Part 20, As necessary, revise DCD Table 12.2-10, DCD Table 12.2-32 and DCD Table 12.2-33 to reflect the changes in UHS pool and RXB airborne tritium and other radionuclide concentrations establishing the bounding conditions for pool evaporation, NuScale Nonproprietary
As necessary, revise DCD Section 9.4.2 to clearly identify that the ventilation flow rate, the RXB air temperature and the RXB are key inputs to the RXB airborne activity concentrations, OR Provide the specific alternative approaches used and the associated justification.
NuScale Response:
10 CFR 20.1101(b) and 10 CFR 20.1003 allow the use of both procedures and engineering controls to maintain exposures to radiation as far below the dose limits in 10 CFR Part 20 as is practical. As in the case of operating licensed nuclear power plants and previously NRC-approved design certification applications, the facility's design features work in concert with the radiation protection programs and procedures to comply with this regulation. Operational procedures are frequently relied upon to comply with regulations.
The analyses performed by NuScale that provide radiation protection related information in the FSAR is appropriately conservative and provides a reasonable and sound basis for the design of various radiation protection design features. The conservatism of the NuScale Reactor Building airborne concentration analysis is demonstrated by assuming twelve reactor modules are simultaneously operating at the design basis fuel failure for two years and by assuming the pool water is at the peak concentration following a refueling outage, while still ensuring that airborne concentrations are less that 10% of a derived airborne concentration (DAC). There is no regulatory requirement that these analyses, provided for radiation protection purposes, be bounding. Plant airborne radiological conditions will be addressed by plant personnel using the radiation protection procedures and programs to ensure continued compliance with regulations.
The calculated airborne activity in the airspace above the reactor pool water is also based on an evaporation rate from the reactor pool while the pool water temperature is at the design basis temperature (100°F) for the Reactor Building HVAC (RBV) system, which is a non-safety, non-risk significant system. The pool water temperature assumed as an input to the design basis NuScale Power Module accident safety analyses is conservatively set at 140°F, demonstrating a margin of safety of the NPM design. Therefore, the upper limit of the pool water temperature in the technical specifications is 140°F. This is intended to ensure the health and safety of the public. Therefore, the current NuScale airborne concentration analysis is appropriate to demonstrate plant personnel protection, using both design features and procedures.
Impact on DCA:
There are no impacts to the DCA as a result of this response.