Forwards Request for Addl Info Re Electrical issues-cable Ampacity Program,Cable Installation Program,Fuse Program & Thermal Overload Program.Responses Requested by 881209
ML18033A445
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 11/21/1988
From: Black S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
TAC-62260, NUDOCS 8811230394
Download: ML18033A445 (8)


Text

'

November 21, 1988 Docket No. 50-260 Mr. S.

A. White Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Mr. White:

Distri buti on NRC PDR Local PDR Projects Reading OSP Reading JPartlow SRichardson BDLiaw SBlack FMcCoy WSLittle MSimms DMoran GGears JRutberg DCrutchfiel d BGrimes EJordan ACRS(10)

GPA/CA GPA/PA BFN Rdg. File

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON ELECTRICAL ISSUES - CABLE AMPACITY PROGRAM, CABLE INSTALLATION PROGRAM, FUSE PROGRAM AND THERMAL OVERLOAD PROGRAM -

BROWNS FERRY NUCLEAR PLANT, UNIT 2 (TAC 62260)

The staff has determined that additional information is required in order to complete the safety evaluations for the subject Browns Ferry Nuclear (BFN) electrical issues.

This formal request for additional information, except for fuse program procedures, is to document earlier verbal requests for clarification of TVA material submitted and TVA explanatory statements made during an audit of BFN Ampacity and Cable Installation Programs.

The information requested is enumerated in Enclosures 1 through 4.

Please provide your responses no later than December 9,

1988 for items identified in Enclosure 2 through 4.

For Enclosure 1 (Cable Ampacity), please provide a

schedule for submitting test results.

Any questions concerning this request should be referred to the Project Manager, David H. Mo~an on 301-492-0766.

I The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.

Sincerely, Original signed by Suzanne C. Black, Assistant Director for Projects TVA Projects Division Office of Special Projects

Enclosures:

1.

Cable Ampacity Program 2.

Cable Installation Program 3.

Fuse Program 3.

Thermal Overload Program cc w/enclosures:

See next page F::T LA M

$0 t i NAME:MSimms gfg DATE:11/

88

DM

.as

SBla
11/ 988
11/

88 OFFICIAL RECORD COPY 8811230394 881121 PDR ADOCK 05000260 P,

PDC

A 1

l

'!'$~y~a)n

ENCLOSURE 1

CABLE AMPACITY PROGRAM By letter dated September 30,

1988, TVA submitted responses to the staff's request for additional information on the cable ampacity program.

The staff subsequently discussed the issue with lVA during an audit of the cable installation issue.

It was reported that TVA is relying on the information obtained from flammastic derating and load diversity test programs for assessing cable ampacity.

In order for the staff to complete its review, TVA should submit the above test programs together with the test results and explain how the test results will be used for assessing cable ampacity.

ENCLOSURE 2

CABLE INSTALLATION PROGRAM In order for the staff to complete its review and issue an SER on the Cable Installation Program, the following information is required:

(a) Provide details of the testing methodology and sampling methods to be used by TVA to resolve the concerns identified for cable bend radii and vertical supports.

(b) In order for the staff to conclude the similarity of cable materials at Browns Ferry and Sequoyah, provide a table for cable materials used at Sequoyah similar to the one provided for Browns Ferry in Table 1 of Materials Evaluation and Comparison reports (880714S128).

(c) Cable Issues Walkdown Report (880714S0129, page 7 of 22) identifies that three cuts of 1/2 to 3/4 inch long of indeterminate depth were observed at one pull point and evidence of abrasion and scuffing was found on other cables.

During the walkdown at Sequoyah except for minor abrasion or scuffing of cables no other evidence of cable damage was observed.

Explain and provide,justification for the TVA conclusion that BFN cable installation is enveloped by Sequoyah.

ENCLOSURE 3

FUSE PROGRAM TVA has prepared as requested, one sample of the wiring diagrams showing

fuses, together with the fuse tabulation corresponding to the sample drawing.

In order to understand the per'tinent attributes of the entire fuse replacement

program, OSP requests the following additional information:

The total number of fuses on tabulation; 2.

The number of fuses documented during walkdown; 3.

The total number of fuses which did not have to be replaced; 4.

The total number of fuses replaced; 5.

6.

The OSP staff understands that motor control center fuses (MCC) were omitted in fuse tabulation.

Please confirm whether or not MCC fuses are omitted from fuse tabulations and if so, provide the reason for such omission q

A copy of the Browns Ferry Nuclear (BFN) procedure for implementation of the Electrical Fuse Tabulation; and 7.

A copy of the BFN Administrative Instruction defining the requirements for controlling procurement; installation and maintenance of electrical fuses.

ENCLOSURE 4 THERMAL OVERLOAD PROGRAM In order for the OSP staff to complete the safety evaluation for thermal

over load protection at Browns Ferry, the following in ormation is needed.

1.

The total number of thermal overload elements (TOLs) documented during plant walkdown.

2.

The total number of TOLs that did not require replacement or adjustment as a result of walkdown.

3.

The total number of TOLs which required adiustment only as a result of the walkdown.

4.

The total number of TOLs which required replacement as a result of the walkdown.

Mr. S.

A. White Browns Ferry Nuclear Plant CC General Counsel Tennessee Valley Authority 400 West Summit Hill Drive Ell B33 Knoxville, Tennessee 37902 Mr. R. L. Gridley Tennessee Valley Authority 5N 157B Lookout Place Chattanooga, Tennessee 37402-2801 Mr. C.

Mason Tennessee Valley Authority Browns Ferry Nuclear Plant P.O.

Box 2000

Decatur, Alabama 35602 Mr. P. Carier Tennessee Valley Authority Browns Ferry Nuclear Plant P.O.

Box 2000

Decatur, Alabama 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 B85 Knoxville, Tennessee 37902
Chairman, Limestone County Commission P.O.

Box 188

Athens, Alabama 35611 Claude Earl Fox, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Atlanta, Gear gia 30323 Resident Inspector/Browns Ferry NP U.S. Nuclear Regulatory Commission Route 12, Box 637
Athens, Alabama 35611 Dr. Henry Myers, Science Advisor Committee on Interior and Insular Affairs U. S.

House of Representatives Washington, D.C.

20515 Tennessee Valley Authority Rockville Office 11921 Rockvil le Pike Suite 402 Rockville, Maryland 20852

0 P

~