Forwards Amend 27 to FSAR for Shearon Harris Nuclear Power Plant,Unit 1.Justification for Revs Also Encl
ML18019B052
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/20/1986
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019B053 List:
References
NLS-86-160, NUDOCS 8606250226
Download: ML18019B052 (60)


Text

REQULAT ~ I NFORl'lATION DI STR I BUT I Ql 'YSTEN { R I DS)

ACCESSIQN NBR: 8606250226 DQC. DATE: 86/06/20 NOTARIZED: YES DOCKET 0 .

FACIL: 50-400 Shearon Harris Nuclear Paver Plant> Unit 1> Carolina 05000400 AUTH. NAl')E AUTHOR AFFILIATION CUTTER, A. B. Carolina Potoer 8c Light Co.

RECXP. NANE RECIPIENT AFFILIATION DENTON> H. R. Off ice of Nuclear Reactor Regulation. Direc tor <post 851125

SUBJECT:

Forwards Amend 27 to FSAR for Shearon Harris Nuclear Pouer Plant> Unit i. Justif cation for revs also encl.

DISTRIBUTION CODE: BOOID TITLE: Licensing Submittal:

ec' DRIES RECEIVED LTR PSAR/FSAR *mdts Zc Q ENCL Related CO C

SIZE: ~l'I/(~P rrespondence NOTES: Application for permit renewal filed. 05000400 RECIPIENT Co< XES RECIPIENT COPIES ID CODE/NAI'1E'MR-A LTTR ENCL ID CODE/NAl'lE LTTR ENCL EB 1 PNR-A EICSB 2 2 PNR-* FOB 1 P4IR-A PD2 LA 1 PWR-A PD2 PD 1 BUCKLEY> B 01 2 2 PNR-A PSB 1 PNR-A RSB 1 INTER NAL: ADN/LFl'IB 1 0 ELD/HDSi 0 XE FILE 1 IE/DEPER/EPB 36 1 XE/DGAVT/GAB 21 1 NRR BMR ADTS 0 NRR PNR-B ADTS 1 0 NRR ROE> l'l. L 1 NRR/DHFT/NTB 1 1 04 1 RCN2 3 3 R 0 EXTERNAL: BNL(Al'lDTS ONLY ) 1 1 DNB/DSS (ANDTS) 1 LPDR 03 1 NRC PDR " 02 NSXC 05 1 1 PNL CRUEL>R 1 TOTAL NUNBER OF COPIES REGUXRED: LTTR 30 ENCL 25

.e. 't ~l I

O'"J (t J 9 1

t h.

9 1 II' II

~ 9 9

' f1 II

  • i, )t4't '9'YW dfh C Ct Tti," 9

"'9 L I 9 JI Cl i '9, Nt""Jtl) 9 9 9

~ .

9 I I 'l 9'

)'99

< i f/9

~

IJ I

4 ~ I' h I h

9 t

I

'9'r 9

1, III r

't

,9

  • r tt P

h 9 I

~~2 E.

@ME Carolina Power & Light Company SERIAL: NLS-86-160 JUk 20 ygg Mr. Harold R. Denton, Directot Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. I - DOCKET NO.50-000 FSAR AMENDMENT NO. 27

Dear Mr. Denton:

Carolina Power r!t: Light Company hereby submits Amendment No. 27 to the Shearon Harris Nuclear Power Plant Final Safety Analysis Report (FSAR). The attachment to this letter describes the changes in the amendment by FSAR section.

Each revised page bears the amendment number, and technical changes are indicated by vertical bars in the page margin.

r Should you have any questions regarding this amendment, please contact Mr. 3im Kloosterman at (919) 836-8055.

Your very tr A. B. Cutter - Vice President Nuclear Engineering R Licensing ABC/BAT/ccj (3859BAT) cc: Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. J. Nelson Grace (NRC-RII)

Wake County Public Library F

A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power r!t: Light Company.

ttttlttttt Notary My commission expires: ///P g/~

(

P8D606250226 860620 I NOTARV:

PDR PU8LIC .'

~e ttttttttttt 411 Fayetteville Street ~ P. O. Box 1551 e Raleigh, N. C. 27602 tsk 8o

f I l n~asa

~ ~ ',

J

~

  • 1 I ~

n ll v<<

AMENDMENT 27 3USTIFICATION TABLE Section 3ustification 1.2.2 Revisions to the figures were made to reflect later versions of design drawings.

1.7 Revisions were to the list of electrical drawings to correctly identify drawing revisions used in design.

1.8 Revisions were made to the text to reflect compliance with Regulatory Guide 1.0, reflect exceptions to Regulatory Guide 1.103, reflect compliance with the requirements of ANSI/ANS 3.1, September 1979 Draft, closeout response to Open Item 600.7 by adding a statement about Regulatory Guide 1.68.3 Item C.10, reflect current organization by adding references to and the educational requirements for on-site nuclear safety personnel and the Manager, Harris Plant Engineering Section, provide consistency within the FSAR section and with Technical Specifications 3/0.08.00 and 3/0.8.1.1.2, reflect compliance with Regulatory Guide 1.9 Revision 2 as opposed to Revision 0 (CPRL letter NLS-86-20),

reflect Regulatory Guide 1.106 Revision 1 as opposed to Revision 0, delete an exemption from Regulatory Guide 1.137, and provide changes in response to NRC request for additional information (NRC letter of 10/30/86, CPRL letter of 1/6/86).

2.1.1 Revisions were made to the text to reflect references to Mean Sea Level.

2.2.3 Revisions were made to the text to correct typographical errors and clarify descriptions regarding evaluation of potential accidents and revisions to the figure were made to reflect later versions of design drawings.

2.3.0, 2.3.5 Revisions were made to the text to correct typographical errors.

2.0.1 Revisions were made to the text and figure to clarify locations of water sources and revise flow data to the most recent values.

2.0.2 Revisions were made to the text and figures to incorporate the most recent rainfall data and correct typographical errors.

2.0.3 Changes were made to the text to reflect correct reference sections.

2.0.0 Revisions were made to the text to reflect revised wind setup values for the Reservoir V/ater Level calculation.

(3836BAT/pgp)

24.5, 2.0.7 Revisions were made to the text to correct typographical errors.

2.0.8 Revisions to the text were made to correct typographical errors and revisions to the figures were made to reflect later versions of design drawings.

Revisions were made to the text to clarify references for flood protection systems.

2.0.11 Changes to the text were made to correct typographical errors and the figures were revised to reflect later versions of design drawings.

2.0.12 Revisions to the text were made to reflect the latest calculation of radiation levels in the Cape Fear River after a tank rupture and correct a typographical error.

Revisions to the text were made to correct a typographical error and clarify the Site Groundwater Conditions description. Revisions to the figures were made to reflect later versions of design drawings.

2.5.1 Revisions to the figures were made to reflect the change in the vertical datum designation from U.S.C and G.S. Datum to the National Geodetic Vertical Datum of 1929.

2.5.0 Revisions were made to the text to reflect the final site construction deleting Units 2, 3, and 0 and provide details on three buildings not originally included in the table.

2.5.6 Revisions to the text were made to clarify information on performance monitoring for retaining walls and revisions to the figures were made to reflect later versions of design drawings.

3.1 Revisions to the text were made to reflect the new Positive Moderator Temperature Coefficient Analysis (CPdcL Letter NLS-86-110 dated 0/23/86).

3.2.1 Revisions were made to the text to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163), reflect a change in the classification of a component of the Gaseous Waste Processing System, and reflect the current design of the Containment Combustible Gas Control System.

Revisions to the figures were made to reflect later versions of design drawings.

3.6.0, 3.6.1 Revisions were made to the text based on NRC acceptance of the elimination of arbitrary breaks (NRC letter dated 8/15/85, CPRL letter dated 2/13/85).

(3836BAT/pgp)

3.6.2 Revisions were made to the text based on NRC acceptance of the elimination of arbitrary breaks (NRC letter dated 8/15/85, CPRL letter dated 2/13/85) and to provide consistency within the FSAR.

3.6A Revisions to the text and figures were made based on NRC acceptance of the elimination of arbitrary breaks (NRC letter dated 8/15/85, CPRL letter dated 2/13/85), reflect the deletion of pipe rupture restraints in addition to those identified in CPRL letter NLS-85-022 dated 2/13/85, and to provide information from later revisions of design drawings.

3.7.3 Changes to the text were to clarify the assumptions used in the dynamic analysis by the modal response spectra method.

Revisions to the figures were made to reflect later versions of design drawings.

3.7.0 Changes were made to clarify wording confirming visual as opposed to audible annunciation of the triaxial response spectrum recorders in the Control Room.

3.8.1 Revisions to the text were made to reflect current Corporate Quality Assurance Technical and Inspection procedures which are based on ASTM standards, reflect the correct editions of ACI standards applicable to SHNPP, reflect current procedures dealing with organic materials, correct a contradiction identified by an NRC inspector while observing the Structural Integrity Test on 2/21/86 - 2/22/86 and provide a more reasonable accuracy for calibration of site portable weighing devices. Revisions to the figures were made to reflect later versions of design drawings, reflect the correct number of rebar strain gages, and reflect the addition of the main steam and feedwater fin cooling system.

3.8.2 Revisions were made to the text to reflect the addition of the main steam and feedwater fin cooling system.

3.8.0 A revision to the text was made to reflect the correct figure reference and revisions to the figures were made to reflect later versions of design drawings.

Revisions to the text were made to provide consistency with Primary Side Leakage Test information in FSAR 3.9.1'.9.2 Section 5.2.0.7 and revisions to the figures were made to reflect later versions of design drawings.

Revisions were made to the text to reflect Boron Injection Tank boron concentration reduction modifications (CPkL Letter NLS-86-163).

3.9.3 Revisions were made to reflect the analysis done to demonstrate the functional capability of ASME Code Class 1 piping and reflect the loading combination used in actual stress analyses (CPRL letter NLS-80-389). Figure 3.9.3-1 was (3836BAT/pgp)

deleted per model change due to reanalysis for conformance to Item II.D.I NUREG-0737 (Confirmatory Item 6).

3.9.6 Revisions were made to the text to clarify requirements and acceptance criteria for the testing of pressure isolation valves (NLS-86-029 dated 2/20/86) and correct a typographical error.

3.9C Revisions were made to the text to provide a description of seismic analyses and a summary of results for additional non-NSSS supplied active valves and correct a typographical error.

3.10.1 Revisions were made to the text to provide the latest information on NSSS supplied equipment qualification levels.

3.11.0 Revisions were made to the text to reflect the latest approved Equipment Qualification Program (as committed in response to SER Open Item 5), reflect current HVAC equipment model numbers and loss of ventilation design features, and to provide the latest information on NSSS supplied equipment qualif ication levels.

3.11.1 Revisions were made to the text and figures to reflect changes in equipment identification and radiation zone maps.

3.11.3 Revisions to the text were made to reflect changes in equipment identification and radiation zone maps.

3.11.0 Revisions to the text were made to reflect current HVAC equipment model numbers and loss of ventilation design features. Revisions to the figures were made to environmental conditions based on the new Main Steam Line Break Containment Analyses which considers the elimination of the Boron Injection Tank.

3.1 1.5 Revisions to the text were made to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163) and reflect the current design of the containment spray additive system.

3.11.6 Revisions to the figures were made to environmental conditions based on the new Main Steam Line Break Containment Analyses which considers the elimination of the Boron Injection Tank.

3.11.7 Revisions to the figure were made to correct typographical errors.

3.11B Revisions to the text and figures were made to include new plant areas determined to contain safety related electr ical equipment, reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter (3836BAT/pgp)

NLS-86-163), reflect the current design of the containment spray additive system, and reflect later revisions of design drawings.

O.l.l, 0.1.2 Changes were made to reflect the latest Large Break Loss of Coolant Accident (LOCA) reanalysis (CPRL Letters NLS-86-167 and NLS-86-212 dated 5/22/86 and 6/3/86, respectively).

0.3.1 Revisions were made to the text to reflect the new Positive Moderator Temperature Coefficient Analysis (CPdcL Letter NLS-86-167 and NLS-86-212 dated 5/22/86 and 6/3/86, respectively).

0.3.2 Revisions were made to the text and figures to reflect the

. new Positive Moderator Temperature Coefficient Analysis and the latest Large Break LOCA reanalysis (CPRL Letters NLS-86-167 and NLS-86-212 dated 5/22/86 and 6/3/86, respectively).

0.3A Revisions were made to the text to reflect the new Positive Moderator Temperature Coefficient Analysis (CPRL Letter NLS-86-.114 dated 0/23/86).

OA.2 Revisions were made to the text to correct a typographical error and reflect the latest Large Break LOCA reanalyses (CPRL letter NLS-86-167 and NLS-86-212 dated 5/22/86 and 6/3/86, respectively).

0.0.6 Revisions were made to the text to delete references to FSAR Section 16.2.

5.1.2, 5.1.3 Revisions to the figures were made to reflect later versions of design drawings.

5.2.5 Revisions to the text were made to delete references to FSAR Section 16.2.

5.3.1 Revisions were made to the text to reflect the cor rect reactor vessel surveillance capsule withdrawal time, reflect current design basis neutron transport methodology used by Westinghouse, clarify neutron fluence information, and provide necessary information to fulfill 10 CFR 50.61 requirement to addr ess Pressurized Thermal Shock.

50302/ 50303 Revisions were made to the text to delete references to FSAR Section 16.2.

5.0.7 Revisions were made to the text and figures in response to Inspector Follow-up Item 85-37-01 and to reflect design values for the Residual Heat Removal (RHR) System in response to Safety Review Question 000.28.

(3836BAT/pgp)

5.0.13 Revisions were made to the text to reflect the use of nitrogen accumulators as the primary drivers of the PORVs.

6.1.1 Revisions were made to the text to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163) and reflect the current design of the containment spray additive system.

6.1.2 Revisions were made to the text to reflect current procedures regarding protective coatings and update the cable insulation materials inventory inside containment.

6.2.1 Revisions were made to the text and figures to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163), reflect the current design of the containment spray additive system, reflect plans to use continuous purging, and to reflect the latest Large Break LOCA reanalysis (CPRL Letters NLS-86-167 and NLS-86-212 dated 5/22/86 and 6/3/86, respectively).

6.2.2 Revisions to the text were made to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163), update the Net Positive Suction Head (NPSH) margin for the containment spray pumps, provide consistency with Technical Specification Table 3.3-0, provide consistency with current containment sump designs, reflect the current design of the containment spray additive system, delete references to FSAR Section 16.2, and to accurately describe the post accident operation of the containment fan cooler units. Revisions to the figures were made to reflect later versions of design drawings.

6.2.0 Revisions to the text were made to clarify previous commitments for Type C testing, meet TMI commitments and General Design Criteria 56, and delete references to FSAR Section 16.2.

6.2.5 Revisions to the text were made to reflect the requirements of NUREG-0737 Item II.E.O for pre-entry purge, make-up, and hydrogen purge exhaust valves and parameters of supplied equipment, delete references to FSAR Section 16.2, reflect current materials inventory in containment, meet General Design Criteria 56, and reflect parameters of the electric hydrogen recombiner. Revisions to the figures were made to reflect later versions of design drawings.

6.3.1 Revisions to the text and figures were made to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163).

6.3.2 Revisions to the text were made to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163) and reflect the current design of (3836BAT/pgp )

the containment spray additive system. Re'visions to the figures were made to reflect later versions of design drawings.

6.3.3 Revisions to the text were made to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163) and provide consistency with FSAR Section 15.1.5 and Technical Specification Table 3.3-5.

6.3A Revisions were made to the text to reflect the Boron Injection Tank boron concentration reduction modifications (CPRL Letter NLS-86-163).

6.5.1 Revisions were made to the text to reflect revised Standard ANSI-N509, reflect changes made based on a change in NRC guidance regarding the fuel handling accident analysis, and delete references to FSAR Section 16.2.

6.5.2 Revisions were made to the text to provide consistency with Technical Specification Table 3.3-0, reflect the reanalysis of containment spr ay additive NaOH/ph, and reflect the curr ent design of the containment spray additive system.

6.5.3 Clarifications to the text were made to reflect elements of HVAC flow for hydrogen purge.

6.6 Revisions were made to the text to correct a section reference and correct a typographical error.

7.2.1 Revisions to the text were made to reflect current design of the reactor coolant pumps undervoltage and underfrequence relay and provide consistency with the OT Delta T and OP Delta T Technical Specifications. Revisions to the figures were made to reflect later versions of design drawings.

7.2.2 Changes to the text were made to correct reference sections for the Reactor Trip Correlation.

7.3.1 Revisions were made to incorporate diesel trip logic addition and electric switchgear protection from the fire suppression system, correct typographical errors, reflect the Boron Injection Tank boron concentration reduction modifications, (CPRL Letter NLS-86-163), clarify the description of the Engineered Safety Features (ESF) System, and correctly identify ESF System equipment and signals. Revisions to the figures were made to reflect later versions of design drawings.

7.3.2 Revisions were made to the text to reflect the current analysis for ESFAS failure modes and effects analysis.

7.0.1 Revisions to the figures were made to reflect later versions of design drawings.

(3836BAT/pgp )

7.0.2 Revisions were made to the text to reflect current design of charging line isolation valves.

7.5.1 Revisions to the text were made to provide clarifications regarding containment temperature instrumentation and operation of HVAC systems during accident conditions and correct typographical errors. Revisions to the figure were made to reflect later versions of design drawings.

7.6.1 Revisions to the figures were made to reflect later versions of design drawings.

7.6.2 References to criteria applicable to instrumentation and control were compiled in resolution to NRC Question 020.0.

7.7.1 Revisions to the text were made to provide additional information on the design of the freeze protection system and temperature maintenance system and revisions to the figure were made to reflect later versions of design drawings.

8.3.1 Revisions to the text were made to provide additional electrical cable separation information (CPRL letter NLS-86-036 dated 2/13/86), incorporate diesel trip logic addition and electric switchgear protection from fire suppression system, provide consistency with Technical Specification 3/0.8.0 and the Safe Shutdown Analysis, reflect the current power panel load, and revise the statement regarding bearing temperature measurement based on the motor specifications. Revisions to the figures were made to reflect later versions of design drawings.

8.3.2 Revisions were made to the text to clarify recharge capabilities of the IE battery.

9.1.3 Revisions to the text were made to clarify fuel pool cooling and cleanup system parameters and correct typographical errors. Revisions to the figures were made to reflect later versions of design drawings.

9.1.0 Revisions to the text were made to the Removal/Installation steps for the Reactor Vessel Integrated Head to enhance ALARA and reduce the flow of foreign material into the vessel flange, and reflect current test procedures for the fuel handling cranes. Revisions to the figures were made to reflect later versions of design drawings.

9.2.1 Revisions were made to provide consistency with Vlestinghouse service water requirements, reflect the deletion of the post SSE fire protection booster pump, delete references to FSAR Section 16.2, and reflect current service water requirements.

(3836BAT/pgp )

9.2.2 Revisions to the text were made to clarify component cooling water system instrumentation requirements and reflect Westinghouse system descriptions. Revisions to the figures were made to reflect later versions of design drawings.

9.2.3 Revisions to the text were made to reflect current water chemistry specifications.

9.2.0 Revisions were made to the text to add the chlorination evaporators of the cooling water system to the potable water distribution list.

9.2.5, 9.2.6 Revisions were made to the text to delete references to FSAR Section 16.2.

9.2.8 Revisions to the text were made to clarify the essential services chilled water systems safety evaluation, add components to the component list, and delete references to FSAR Section l6.2. Revisions to the figures were made to reflect later versions of design drawings.

9.2.9 Revisions to the text were made to add components to the non-essential chilled water system component table.

Revisions to the figures were made to reflect later versions of design drawings.

9.2.lo Clarifications were made to the Waste Processing Building cooling water systems descr iption and figures were revised to reflect later versions of design drawings.

9.3.l Revisions to the text were made to clarify the compressed air system safety evaluation, delete references to FSAR Section l6.2, and reflect the use of nitrogen accumulators as the primary drivers of the PORVs.

9.3.2 Revisions to the text were made to reflect current primary sampling system design and related test procedures and reflect sample points and test requirements for the secondary sampling system. Revisions to the figures were made to reflect later versions of design drawings.

9.3.3 Revisions to the text were made to clarify the equipment and floor drainage systems description.

9.3.0 Revisions to the figures were made to reflect later versions of design drawings.

9.3.6 Revisions were made to reflect current primary sampling system design and reflect later versions of design drawings.

9.0.0 Revisions were made to the text to correct flows and velocities in Table 9.0.0-2, reflect indoor space design temperatures and humidities, add new airborne effluent release points, and correct typographical errors.

(3836BAT/pg p )

i 9.0.1 Revisions were made to the text to clarify design bases and operations descriptions of the control room area ventilation and habitability system and to delete reference to FSAR Section 16.2 9.0.2 Revisions were made to the text to clarify the HVAC system description for the Fuel Handling Building and delete references to FSAR Section 16.2.

9.0.3 Revisions to the text were made to clarify the HVAC system descriptions for the Reactor Auxiliary and %'aste Processing Buildings. Revisions to the figures were made to reflect later versions of design drawings.

9.0.0 Revisions to the text were made to clarify HVAC system descriptions for the turbine building.

9.0.5 Revisions to the text were made to clarify system descriptions for the Reactor Auxiliary Building, clarify starting sequence of the Diesel Generator Building exhaust fans, and correct the identification of ESWIS pump room heaters. Revisions to the figures were made to reflect later versions of design drawings.

9.0.7 Revisions to the text were made to clarify system descriptions for the containment ventilation system and delete references to FSAR Section 16.2.

9.0.9 Revisions were made to the text to add a new subsection to describe the Computer/Communication Room HVAC systems.

9.0.10 Revisions were made to the text to clarify HVAC system descriptions for the turbine building.

9.5.1 Revisions to the text were made to clarify sprinkler and water spray system descriptions, reflect the requirements of NUREG-0800 for hose stations, reflect the current design of the Control Room Area Ventilation System, reflect deletion of the post SSE fire protection booster pump, add a reference to the Safe Shutdown Analysis, reflect the proper description of the power supply for fire protection panels, correct typographical errors, and delete references to FSAR Section 16.2. Revisions to the figure were made to reflect later versions of design drawings.

9.5.2 Revisions to the text and figures were made to clarify intercom system descriptions.

9.5.0 Revisions were made to the text to clarify the diesel fuel oil storage tanks system descriptions, provide consistency with Technical Specification Section 0.8.1.1.2, and delete references to FSAR Section 16.2.

(3836BAT/pgp)

9.5.5 Revisions were made to the text to correct a reference to an FSAR section and reflect the current diesel generator trip setpoint.

9.5.6 Revisions to the text were made to clarify the Diesel Generator Air Starting System descriptions. Revisions to the figure were made to reflect later versions of design drawings.

9.5.7 Revisions were made to the text to reflect the new diesel generator trip setpoint and clarify the Diesel Generator Lubrication System description.

9.5.8 Revisions were made to the text to clarify the systems description for the diesel generator combustion air intake and exhaust system.

9.5A Revisions to the text and figures were made to reflect additional fire detection equipment, incorporate the additional fire loading due to the addition of the volume reduction system polymer storage tank, revise the combustible materials inventory, and correct typographical errors.

10.1.0, 10.2.2 Revisions to the figures were made to reflect later versions of design drawings.

10.3.1 Revisions were made to the text to correct a section reference, reflect correct stroke time for PORVs, and reflect correct material specifications for main steam system valves.

10.3.2 Revisions were made to the text to provide correct valve design codes and closure times.

Revisions were made to the text to reflect commitments made in response to SER Open Items 9 and 10, and Confirmatory Items 20, 25, and 26, and reflect that the Process Control Program (PCP) has been developed and submitted to the NRC.

104.O Revisions were made to the text to reflect current testing intervals for the steam dump system.

10.0.5 Revisions to the figure were made to reflect later versions of design drawings.

IOA.7 Revisions to the text were made to clarify the condensate system description and Steam Generator Feedwater Pump data. Revisions to the figures were made to reflect later versions of design drawings.

10.0.9 Revisions to the text were made to delete references to FSAR Section 16.2.

(3836BAT/pgp )

1 1.1.1 Revisions were made: to the text to correct notation in the design bases fission product activity calculation.

11.1.2 Revisions were made to the text to correct the secondary coolant activity value for Sr-91.

11.1.6 Revisions were made to the text to clarify the description of the model used for calculation of the tritum concentration in the primary coolant and to correct a typographical error.

11.1.8 Revisions were made, to the text to correct a section reference.

1 1.2.1 Revisions were made to the text to correct typographical errors.

11.2.2 Revisions were made to the text to correct figure references. Revisions to the figures were made to reflect the use of nitrogen accumulators as the primary drivers of the PORVs and to reflect later versions of design drawings.

11.3,2 Revisions to.the text were made to provide consistency with the setpoint document, correct section references, and add references to the General Design Criteria.

1 1.3.3 Revisions were made to the text to reflect the latest calculationai data for radioactivity concentration at the site boundary during normal operation.

11.0.1 Revisions were made to the text to correct a value for solid processing inputs and an iodine isotope.

1 1.0.2 Revisions were made to clarify notes to Tables 11.0.2-2 and 11.0.2-3 and correct a figure reference. Revisions to the figures were made to reflect later versions of design drawings.

1 1.5.1 Revisions to the text were made to clarify the Process Sampling System operation description and to clarify a sampling procedure reference.

1 1.5.2 Revisions were made to the text to reflect commitments made in response to SER Open Items 9 and 10 and Confirmatory Items 20, 25, and 26, reflect Westinghouse system description changes, correct a section reference, add reference to Regulatory Guide 1.89 and NUREG-0588, reflect the latest equipment qualification program per 10 CFR 50.09, reflect the correct ANSI standard for nozzle assembly locations, and make the terminology consistent with the Technical Specifications and Offsite Dose Calculation Manual (ODCM).

(3836BAT/pgp)

12.1.1 Revisions to the figure were made to reflect the current Health Physics organization.

12.2.0 Revisions were made to the text to reflect the current ANSI standard for airborne radiation standards.

12.3.2 A revision was made to the text to delete references to FSAR Section 16.2. Revisions to the figures were made to reflect later versions of design drawings.

12.3.3 Revisions to the text were made to clarify design descriptions for the radioactive ventilation and radiation airborne monitoring system.

12.3A Revisions were made to the text to clat ify descriptions of the Fuel Handling Building monitors and control room normal and emergency outside air intakes, and reflect a correct section reference.

12.5.3 Revisions were made to the text to provide consistency with present radiological control and protection program, and to provide consistency with SHNPP terminology.

13,1, 13.2.1 Revisions to the text and figures were made to reflect current organization and provide consistency within the section.

13.2.2 Revisions were made to the text to clarify retraining requirements for non-license personnel.

13.2.3 Revisions were made to the text to make reference to the emergency plan section providing for drills and exercises for station employees.

13.0.2, 13.5.1 Revisions to the figures were made to reflect the current organization.

10.2.7 Revisions to the text were made to reflect exception to performing the requirements of Regulatory Guide 1.68, 5.i based on the standard incore instrumentation system at SHNPP and the development of a procedure, reflect exception to Regulatory Guide 1.68 Appendix A, paragraph I.m.0 (CPdcL Letter NLS-86-120 dated 5/1/86).

Revisions were also made in response to an NRC request on the Initial Test Program (NRC letter of 10/30/85 and CPRL letter of 1/6/86). Revisions to the figures were made to reflect later versions of design drawings.

10.2.12 Revisions to the text were made to reflect the Boron Injection Tank concentration reduction modifications (CPRL Letter NLS-86-163), clarify test method and acceptance criteria for HFT, reflect requirements of Westinghouse equipment specifications for MSIVs, reflect current design (3836BAT/pgp)

and test requirements, and revise acceptance criteria for Fuel Handling Cranes (CPRL Letter NLS-86-120 dated 5/1/86).

15.0.3 Revisions were made to the text to reflect the new Positive Moderator Temperature Coefficient Analysis (CPRL Letter NLS-86-110 dated 0/23/86).

15.0.13 Revisions were made to the text to provide consistency within the FSAR and add single failure analysis for inadvertent boron dilution.

15.1.0, 15.1.5 Revisions to the text and figures were made to reflect the Boron Injection Tank boron concentration reduction modif ications (CPRL Letter NLS-86-163).

15.2.3, 15.2.6, 15.3.1, Revisions to the text and figures were made to reflect the 15.3.2, 15.3.3, 15.0.1, new Positive Moderator Temperature Coefficient Analysis (CPRL Letter NLS-86-110 dated 0/23/86), and provide consistency within the FSAR.

15.0.2 Revisions to the text and figures were made to reflect the new Positive Moderator Temperature Coefficient Analysis (CPRL Letter NLS-86-110 dated 0/23/86).

15.0.6 Revisions were made to the text to reflect values used in the latest CPRL analysis of an inadvertent boron dilution at cold shutdown and reflect the proper description of operator action as a result of such an event.

15.0.7 Revisions to the figure were made to reflect later versions of design drawings.

15 0.8 Revisions to the text and figures were made to reflect current analysis results for rod cluster control assembly ejection accidents, and reflect the new Positive Moderator Temperature Coefficient Analysis (CPRL Letter NLS-86-110 dated 0/23/86).

15.6.3 Revisions were made to reflect the correct concentration limit for Iodine-131.

15.6.5 Revisions to the text were made to reflect the latest data used in the Control Room Habitability Study and revisions to the text and tables were made to reflect the latest Large Break LOCA reanalysis (CPdcL Letters NLS-86-167 and NLS-86-212 dated 5/23/86 and 6/3/86).

15.7.1 Revisions were made to the text to reflect a correct table reference.

15.7.0 Revisions were made to the text to provide consistency with information on page 15.7.0-8 concerning containment isolation during an accident and to reflect a change in the (3836BAT/pgp)

filter efficiency used in the fuel handling building fuel handling accident analysis.

17.2.1 Revisions were made to the text to reflect the current QA organization, and clarify the alignment of responsibilities (see CPRL letters NLS-85-366, dated 10/16/85, and NLS-85-065, dated 1/3/86).

17.2.2 Revisions were made to the text to clarify which procedures are required for personnel training and indoctrination.

17.2.7 Revisions were made to the text to provide consistency with the corporate QA manual.

17.2.17 Revisions were made to the text to delete a reference to FSAR Section 16.2.

17.2.19 Revisions were made to the text to provide consistency with the corporate QA manual.

Revisions were made to the text to reflect the requirements of NUREG-0737 Item II.D.3, complete deletion of EOP vendor review per NUREG-0737 Item.l.C.7 (CPRL letter NLS-80-523), clarify the description of compliance with NUREG-0737, Item II.K.1.17, Trip Per Low Level Bistable, and clarify the list of systems included in the leak reduction program for NUREG-0737, Item II.D.l.l, Primary Coolant Outside Containment.

Appendix A Revisions were made to the text to address all PSRB requests for additional information (NRC Letter dated 10/30/85 and CPRL Letter NLS-85-030 dated 1/6/86).

(3836BAT/pgp)

~

~

SHNPP FSAR CAROLINA POWER R LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-000 FINAL SAFETY ANALYSIS REPORT - AMENDMENT NO. 27 INSTRUCTION SHEET This amendment contains additional or revised technical information and editorial changes in the form of replacement pages for the SHNPP FSAR. Each revised page bears the notation "Amendment No. 27" at the page bottom. Vertical bars with the number "27" beside them have been placed in the margins of revised pages to indicate the location of technical revisions on the page.

Since many SHNPP FSAR pages are printed double-sided, the replacement pages in this amendment may consist of original information on one side of the page and revised information on the other side. Reference to the amendment identification number in the lower right corner of the page will enable the user to determine the am'endment status of the page (whether it is original or revised material). Unchanged material located on the reverse side of a revised page will not contain an amendment identification number or amendment bars.

The following page removals and insertions should be made to incorporate Amendment No. 27 into the FSAR:

REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES EFFECTIVE PAGE LIST: EFFECTIVE PAGE LIST:

EPL-I / EPL-2 EPL-1 / EPL-2 EPL-0 / EPL-5 EPL-0 / EPL-5 EPL-6 / EPL-7 EPL-6 / EPL-7 EPL-8 EPL-8 EPL-13 / EPL-10 EPL-13 / EPL-10 EPL-15 EPL-15 EPL-16 / EPL-17 EPL-16 / EPL-17 EPL-18 / EPL-19 EPL-18 / EPL-19 EPL-20 EPL-20 EPL-25 / EPL-26 / EPL-26

'PL-25 EPL-39 / EPL-00 through EPL-39 / EPL-00 through EPL-119 EPL-121 GENERAL TABLE OF CONTENTS GENERAL TABLE OF CONTENTS xxi / xxii xxi / xxii xxii-a CHAPTER 1 CHAPTER 1 I-vi I-v<

Amendment No. 27

il t ~

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES Fig. 1.2.2-35 Fig. 1.2.2-35 Fig. 1.2.2-39 Fig. 1.2.2-39 Fig. 1.2.2-53 Fig. 1.2.2-53 Fig. 1.2.2-50 Fig. 1.2.2-50 Fig. 1.2.2-80 Fig. 1.2.2-80 Fig. 1.2.2-86 Fig. 1.2.2-86 1.7-1 through 1.7-96 1.7-1 through 1.7-122 1.8-0 1.8-0 I.S-IO through 1.8-13 1.8-10 through 1.8-13 1.8-16 1.8-16 1.8-86a 1.8-86a 1.8-137 1.8-137 1.8-175 1.8-175 CHAPTER 2 CHAPTER 2 2-xx>v / 2-xxv 2-xx<v / 2-xxv 2-xxvi / 2-xxv>> 2-xxvi / 2-xxv>>

2-xxx>> / 2-xxx>>< 2-xxx>> / 2-xxx<>>

2.1.1-1 / 2.1.1-2 2.1.1-1 / 2.1.1-2 2.2.3-3 / 2.2.3-0 2.2.3-3 / 2.2.3-0 2.2.3-5 / 2.2.3-6 2.2.3-5 / 2.2.3-6 2.2.3-9 / 2.2.3-10 through 2.2.3-9 / 2.2.3-10 through 2.2.3-15 / 2.2.3-16 2.2.3-15 / 2.2.3-16 2.2.3-19 / 2.2.3-20 2.2.3-19 / 2.2.3-20 2.2.3-22a / 2.2.3-22b 2.2.3-22a / 2.2.3-22b 2.2.3-27 2.2.3-27 References Section 2.2 References Section 2.2 Page Containing References Page Containing References 2.2.3-1 through 2.2.3-10 2.2.3-1 through 2.2.3-10 Fig. 2.2.3-1 Fig. 2.2.3-1 2.3.0-1 / 2.3.0-2 2.3.0-1 / 2.3.0-2 2.3.5-1 / 2.3.5-2 2.3.5-1 / 2.3.5-2 2.3.5-3 20305 3 2.3.5-0 2.3.5-0 2.3.5-5 2%305-5 2.3.5-6 2.3.5-6 2.3.5-7 2.3.5-7 2.3.5-8 2.3.5-8 2.3.5-9 2.3.5-9 Amendment No. 27

I l I

'll SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 2 0.1-1 / 2.0.1-2 2.0.1-1 / 2.0.1-2 2.0.1-0a 2.0.1-0a 2.0.1-5 / 2.0.1-6 2.0.1-5 / 2.0.1-6 2.0.1-9 2.0.1-9 2.0.2-2a / 2.0.2-2b 2.0.2-2a / 2.0.2-2b 2.0.2-3 / 2.0.2-3a 2.0.2-3 / 2.0.2-3a 2.0.2-8 2.0.2-8 2.0.3-1 / 2.0.3-2 2.0.3-1 / 2.0.3-2 2.0.3-3 / 2.0.3-0 2.0.3-3 / 2.0.3-0 2.0.0-1 / 2.0.0-2 2.0.0-1 / 2.0.0-2 2.0.0-3 / 2.0.0-0 2.0.0-3 / 2.0.0-0 2.0;5-3 / 2.0.5-0 2.0.5-3 / 2.0.5-0 2.0.5-5 2.0.5-5 2.0.7-1 / 2.0.7-2 2.0.7-1 / 2.0.7-2 2.0.8-1 / 2.0.8-2 2.0.8-1 / 2.0.8-2 2.0.10-1 2.0.10-1 2.0.11-11 / 2.0.11- 1 la 2.0.11-11 / 2.0.11-1 la 2.0.11-30 2.0.11-30 2.0.11-35 2.0.11-35 2.0.12-3 2.0.12-3 2.0.13-1 / 2.0.13-2 2.0.13-1 / 2.0.13-2 2.0.13-8a / 2.0.13-8b 2.0.13-8a / 2.0.13-8b Fig. 2.0.1-1 Fig. 2.0.1-1 Fig. 2.0.2-1 Fig. 2.0.2-1 Fig. 2.0.2-3 Fig. 2.0.2-3 Fig. 2.0.2-0 Fig. 2.0.2-0 Fig. 2.0.2-5 Fig. 2.0.2-5 Fig. 2.0.8-1 Fig. 2.0.11-2 Fig. 2.0.1 1-2 Fig. 2.0.11-9 Fig. 2.0.1 1-9 Fig. 2.0.13-1 Fig. 2.0.13-1 Fig. 2.0.13-2 Fig. 2.0.13-2 Fig. 2.0.13-0 Fig. 2.0.13-0 Amendment No. 27

~

~

c

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 2.5.0-33 2.5 0-33 2.5.6-39 / 2.5.6-00 2.5.6-39 / 2.5.6-00 Fig. 2.5.1-1 I Fig. 2.5.1-1 I Fig. 2.5.6-1 Fig. 2.5.6-1 Fig. 2.5.6-0 Fig. 2.5.6-0 Fig. 2.5.6-5 Fig. 2.5.6-5 Fig. 2.5.6-7 Fig. 2.5.6-7 Fig. 2.5.6-8 Fig. 2.5.6-8 Fig. 2.5.6-26 Fig. 2.5.6-26 CHAPTER 3 CHAPTER 3 3-IX / 3-x 3-<x / 3-x 3-x-a 3-xv / 3-XV> 3-xv / 3-XV>

3-xv<< / 3-xv<<i 3-xv<< / 3-xv< 3-xxv / 3-XXV<

3-xxv<< 3-xxv<<

3-xxx<< / 3-xxx<<l 3-xxx<< / 3-xxxi<<

3-XXX>v / 3-xxxv 3-xxxiv / 3-xxxv 3-xl<< / 3-xl<<i 3-xl<< / 3-xl<<>

3-xlviii / 3-xlix 3-xlv<i / 5-xnan 5-xi' 5-xnan 5-xiii-a Fig. 5.1.2-2 Fig. 5.1.2-2 Fig. 5.1.3-1 Fig. 5.1.3-1 5.2.5-1 / 5.2.5-2 5.2.5-1 / 5.2.5-2 5.2.5-1 I 5.2.5-1 I 5.3.1-5 / 5.3.1-6 through 5.3.1-5 / 5.3.1-6 through 5.3.1-11 5.3.1-1 I / 5.3.I-I IG 5.3.1-33 5.3.2-1 / 5.3.2-2 5.3.2-1 / 5.3.2-2 5.3.3-3 / 5.3.3-0 5.3.3-3 / 5.3.3-0 References Section 5,3 References Section 5.3 Amendment No. 27

~

g I

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENTPAGES 5 0.7-1 / 5.0.7-2 through 5.0.7-1 / 5.0.7-2 through 5.0.7-9 / 5.0.7-10 5.0.7-9 / 5.0.7-10 5.0.7-11 5.0.7-11 5.0.13-1 / 5.0.13-2 5.0.13-1 / 5.0.13-2 Fig. 5.0.7-2 Fig. 5.0.7-2 Notes to Fig. 5.0.7-2 Sheet I Notes to Fig. 5.0.7-2 Sheet I Notes to Fig. 5.0.7-2 Sheet 0 Notes to Fig. 5.0.7-2 Sheet 0 Notes to Fig. 5.0.7-2 Sheet 5 Notes to Fig. 5.0.7-2 Sheet 5 CHAPTER 6 CHAPTER 6 6-1 / 6-<< 6-1 / 6-<<

6-<<i / 6-iv 6-iii / 6-iv 6-v<< / 6-Yiii 6-v<< / 6-v<<1 6-xi / 6-x<< 6-xi / 6-x<<

6-xvi<< / 6-xix 6-xviii / 6-xix 6-xli / 6-xiii 6-xli / 6-xiii 6-xliii 6-xliii 6.1.1-3 / 6.1.1-0 6.1.1-3 / 6.1.1-0 6.1.2-1 / 6.1.2-2 6.1.2-1 / 6.1.2-2 6.1.2-3 6.1.2-3 6.1.2-5 through 6.1.2-10 6.1.2-5 through 6.1.2-1 I 6.2.1-11 / 6.2.1-12 6.2.1-1 I / 6.2.1-12 6.2.1-12a 6.2.1-26a / 6.2.1-26b 6.2.1-26a / 6.2.1-26b 6.2.1-26c / 6.2.1-26d 6.2.1-26c / 6.2.1-26d 6.2.1-26e / 6.2.1-26f 2.6.1-26e 6.2.1-26g 6.2.1-30 through 6.2.1-35 6.2.1-30 through 6.2.1-35 6.2.1-09 6.2.1-09 6.2.1-50 6.2.1-50 6.2.1-55 6.2.1-55 6.2.1-56 6.2.1-56 6.2.1-163 6.2.1-163 6.2.1-163a 6.2.1-160 6.2.1-160 6.2.1-165 6.2.1-165 6.2.1-166 6.2.1-166 6.2.1-166a N 14- Amendment No. 27

0 SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 6.2.2-1 / 6.2.2-2 6.2.2-1 / 6.2.2-2 6.2.2-3 / 6.2.2-0 6.2.2-3 / 6.2.2-0 6.2.2-0a 6.2.2-7 / 6.2.2-8 6.2.2-7 / 6.2.2-8 6.2.2-9 / 6.2.2-10 through 6.2.2-9 / 6.2.2-10 through 6.2.2-13 / 6.2.2-10 6.2.2-13 / 6.2.2-10 6.2.2-16 6.2.2-16 6.2.2-27 6.2.2-27 6.2.2-28 6.2.2-28 6.2.0-1 / 6.2.0-2 6.2.0-1 / 6.2.0-2 6.2.0-7 / 6.2.0-8 6.2.0-7 / 6.2.0-8 6.2.0-10a 6.2.0-10a 6.2.5-1 / 6.2.5-2 6.2.5-1 / 6.2.5-2 6.2.5-3 / 6.2.5-0 6.2.5-3 / 6.2.5-0 6.2.5-0a 6.2.5-0a 6.2.5-6a / 6.2.5-6b 6.2.5-6a / 6.2.5-6b 6.2.5-6c 6.2.5-6c 6.2.5-11 / 6.2.5-1 la 6.2.5-1 1 / 6.2.5-1 la 6.2.5-12 6.2.5-12 6.2.5-18 through 6.2.5-20 6.2.5-18 through 6.2.5-20 Fig. 6.2.1-9 Fig. 6.2.1-9 Fig. 6.2.1-10 Fig. 6.2.1-10 Fig. 6.2.1-12 Fig. 6.2.1-12 Fig. 6.2.1-10 Fig. 6.2.1-10 Fig. 6.2.1-302 Fig. 6.2.1-302 Fig. 6.2.1-300 Fig. 6.2.1-300 Fig. 6.2.1-305 Fig. 6.2.1-305 Fig. 6.2.2-3 Fig. 6.2.2-3 Fig. 6.2.2-9 Fig. 6.2.2-9 Fig. 6.2.2-16 Fig. 6.2.2-16 Fig. 6.2.5-6 Fig. 6.2.5-6 Fig. 6.2.5-7 Fig. 6.2.5-7 6.3.1-1 / 6.3.1-2 6.3.1-1 / 6.3.1-2 6.3.1-7 6.3.1-7 6.3.1-8 6.3.1-8 6.3.1-18 6.3.1-18 6.3.2-1 / 6.3.2-2 through 6.3.2-1 / 6.3.2-2 through 6.3.2-5 / 6.3.2-6 6.3.2-5 / 6.3.2-6 6.3.2-134 / 6.3.2-13e 6.3.2-134 / 6.3.2-13e 6.3.2-13f / 6.3.2-13g 6.3.2-13f / 6.3.2-13g 6.3.2-10 through 6.3.2-18 6.3.2-10 through 6.3.2-18 6.3.2-22 6.3.2-22 6.3.2-28 through 6.3.2-30 6.3.2-28 through 6.3.2-30 Amendment No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 6.3.3-1 / 6.3.3-2 6.3.3-1 / 6.3.3-2 6.3.3-3 / 6.3.3-0 6.3.3-3 / 6.3.3-0 6.3.3-7 / 6.3.3-8 6.3.3-7 / 6.3.3-8 6.3.0-1 / 6.3 0-2 6.3.0-1 / 6.3.0-2 Fig. 6.3.2-1 Fig. 6.3.2-1 Fig. 6.3.2-2 Fig. 6.3.2-2 Fig. 6.3.2-3 Fig. 6.3.2-3 Fig. 6.3.2-5 Fig. 6.3.2-5 Note to Fig. 6.3.2-0 through 6.3.2-6 Sheet 1 through Sheet 10 .

Fig. 6.3.2-7 Fig. 6.3.2-7 Deleted Notes to Fig. 6.3.2-0 through 6.3.2-7 Sheet 1 through Sheet 10 6.5.1-3 / 6.5.1-0 through 6.5.1-3 / 6.5.1-0 through 6.5.1-7 6.5.1-7 / 6.5.1-7a 6.5.1-8 6.5.1-8 6.5.1-1 1 6.5.1-1 1 6.5.1-12 6.5.1-12 6.5.1-10 6.5.1-10 6.5.2-1 / 6.5.2-2 6 5.2-1 / 6.5.2-2 6.5.2-5 / 6.5.2-6 6.5.2-5 / 6.5.2-6 6.5.2-7 / 6.5.2-8 6.5.2-7 / 6.5.2-8 6.5.2-10 6.5.2-10 6.5.3-2 6.5.3-2 Fig. 6.5.2-2 Fig. 6.5.2-2 Fig. 6.5.2-3 Fig. 6.5,2-3 Fig. 6.5.2-0 Fig. 6.5.2-0 Deleted Fig. 6.5.2-5 Fig. 6.5.2-5 Deleted Fig. 6.5.2-6 Fig. 6.5.2-6 Deleted 6.6-3 / 6.6-0 6.6-3 / 6.6-0 CHAPTER 7 CHAPTER 7 7-ix/ 7-x 7->x / 7-x 7-xv / 7-xv> 7-xv / 7-xv>

7-xxi / 7-xxii 7-xx< / 7-xxii 7-xx>>s / 7-xxsv 7-xx>>i / 7-xxiv 7-xxv / 7-xxvs 7-xxv / 7-xxv<

7.2.1-3 / 7.2.1-0 7.2.1-3 / 7.2.1-0 7.2.1-5 / 7.2.1-6 7.2.1-5 / 7.2.1-6 7.2.1-6a / 7.2.1-6b Amendment No. 27

I I ~

l'

~

~

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 7.2.2-16 through 7.2.2-21 7.2.2-16 through 7.2.2-21 Fig. 7.2.1-1 Sheet 8 Fig. 7.2.1-1 Sheet 8 Fig. 7.2.1-1 Sheet 11 Fig. 7.2.1-1 Sheet I.l 7.3.1-1 / 7.3.1-2 7.3.1-1 / 7.3.1-2 7.3.1-3 / 7.3.1-0 7.3.1-3 / 7.3.1-0 7.3.1-13 / 7.3.1-10 7.3.1-13 / 7.3.1-10 7.3.1-10a 7.3.1-10a 7.3.1-15 / 7.3.1-16 7.3.1-15 / 7.3.1-16 7.3.1-19 / 7.3.1-20 7.3.1-19 / 7.3.1-20 7.3.1-20a / 7.3.1-20b 7.3.1-20a / 7.3.1-20b 7.3.1-20c 7.3.1-20c 7.3.1-23 / 7.3.1-20 through 7.3.1-23 / 7.3.1-20 through 7.3.1-31 / 7.3.1-32 7.3.1-31 / 7.3.1-32 7.3.1-06 7.3.1-06 7.3.1-07 7.3.1-07 7.3.1-09 through 7.3.1-53 7.3.1-09 through 7.3.1-53 7.3.1-57 through 7.3.1-63 7.3.1-57 through 7.3.1-63 7.3.1-67 through 7.3.1-69 7.3.1-67 through 7.3.1-69 7.3.2-1 / 7.3.2-2 7.3.2-1 / 7.3.2-2 Fig. 7.3.1-1 Sheet I through Fig. 7.3.1-1 Sheet I through Fig. 7.3.1-1 Sheet 3 Fig. 7.3.1-1 Sheet 3 Fig. 7.3.1-1 Sheet 5 Fig. 7.3.1-1 Sheet 5 Fig. 7.3.1-1 Sheet 6 Fig. 7.3.1-1 Sheet 6 Fig. 7.3.1-8 Sheet I through Fig. 7.3.1-8 Sheet I through Fig. 7.3.1-8 Sheet 3 Fig. 7.3.1-8 Sheet 3 Fig. 7.3.1-11 Sheet 12 Fig. 7.3.1-11 Sheet 12 Deleted Fig. 7.3.1-13 Sheet 3 Fig. 7.3.1-13 Sheet 3 Deleted Fig. 7.3.1-13 Sheet 6 Fig. 7.3.1-13 Sheet 6 Fig. 7.3.1-13 Sheet 13 Fig. 7.3.1-13 Sheet 13 Fig. 7.3.1-13 Sheet 10 Fig. 7.3.1-13 Sheet 10 Fig. 7.3.1-10 Sheet 2 Fig. 7.3.1-10 Sheet 2 Fig. 7.3.1-10 Sheet 0 Fig. 7.3.1-10 Sheet 0 Fig. 7.3.1-10 Sheet 7 Fig. 7.3.1-10 Sheet 7 Fig. 7.3.1-16 Sheet 3 Fig. 7.3.1-16 Sheet 3 Fig. 7.3.1-20 Sheet I Fig. 7.3.1-20 Sheet I Fig. 7.3.1-20 Sheet 5 Fig. 7.3.1-20 Sheet 5 Deleted Fig. 7.3.1-20 Sheet 6 Fig. 7.3.1-20 Sheet 6 Deleted Fig. 7.3.1-20 Sheet 19 Fig. 7.3.1-20 Sheet 19 Deleted Fig. 7.3.1-21 Sheet I Fig. 7.3.1-21 Sheet I Fig. 7.3.1-21 Sheet 0 Fig. 7.3.1-21 Sheet 0 Fig. 7.3.1-21 Sheet 7 Fig. 7.3.1-21 Sheet 7 Fig. 7.3.1-21 Sheet 9 through Fig. 7.3.1-21 Sheet 9 through Fig. 7.3.1-21 Sheet I I Fig. 7.3.1-21 Sheet 13 17 Amendment No. 27

I g II SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES Fig. 7.3.1-21 Sheet 21 Fig. 7.3.1-22 Sheet 5 Fig. 7.3.1-22 Sheet 5 Deleted Fig. 7.3.1-22 Sheet 10 Fig. 7.3.1-22 Sheet 10 Deleted Fig. 7.3.1-26 Sheet 2 Fig. 7.3.1-26 Sheet 2 Fig. 7.3.1-27 Sheet I through Fig. 7.3.1-27 Sheet 7 Fig. 7.3.1-28 7.0.2-5 / 7.0.2-6 7.0.2-5 / 7.0.2-6 7.0.2-7 7.0,2-7 Fig. 7.0.1-0 Fig. 7.0.1-0 Fig. 7A.1-5 Fig. 7.0.I-5 Fig. 7.0.1-8 Fig. 7.0.1-8 7.5.1-3 / 7.5.1-0 7.5.1-3 / 7.5.1-0 7.5.1-5 / 7.5.1-6 7.5.1-5 / 7.5.1-6 7.5.1-13 7.5.1-13 7.5.1-01 7.5.1-01 Fig. 7.5.1-6 Fig. 7.5.1-6 7.6.2-3 / 7.6.2-0 7.6.2-3 / 7.6.2-0 Fig. 7.6.1-0 Fig. 7.6.1-0 Fig. 7.6.1-6 Fig. 7.6.1-6 7.7.1-17 / 7.7.1-17a 7.7.1-17 / 7.7.1-17a 7.7.1-17b Fig. 7.7.1-7 Fig. 7.7.1-7 Deleted CHAPTER 8 CHAPTER 8 8-i<< / 8-iv 8-<<i / 8-iv I

8.3.1-12a / 8.3.1-12b 8.3.1-12a / 8.3.1-12b 8.3.1-13 / 8.3. I-I0 8.3.1-13 / 8.3.1-10 8.3.1-20a / 8.3.1-20b 8.3.1-20a / 8.3.1-20b 8.3.1-23 / 8.3.1-20 8.3.1-23 / 8.3.1-20 8.3.1-25 / 8.3.1-26 8.3.1-25 / 8.3.1-26 8.3.1-29 / 8.3.1-30 8.3.1-29 / 8.3.1-30 8.3.1-30a 8.3.1-30a 8.3.1-37 / 8.3.1-38 8.3.1-37 / 8.3.1-38 8.3.1-39 / 8.3.1-00 8.3.1-39 / 8.3.1-00 8.3.1-00a / 8.3.1-00b 8.3.1-00a / 8.3.1-00b 8.3.1-00c 8.3.1-00c / 8.3.1-00d 8.3.1-53 8.3.1-53 8.3.1-58f 8.3.1-58f 8.3.1-73 8.3.1-73 Amendmene No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 8.3.2-1 / 8.3.2-2 8.3.2-1 / 8.3.2-2 Fig. 8.3.1-1 Fig. 8.3.1-1 Fig. 8.3.1-6 through Fig. 8.3.1-6 through Fig. 8.3.1-13 8.3.1-13 'ig.

CHAPTER 9 CHAPTER 9 9-v / 9-vi through 9-ix / 9-x 9-v / 9-vi through 9-ix / 9-x 9-xi / 9-xii through 9-xi / 9-xii through 9-xyi-a 9-xvi-a / 9-xvi-b

/ 9-xx

'-xlx 9-xix / 9-xx 9-xxiii / 9-xiv through 9-xxix 9-xxiii / 9-xxiv through 9-xxix 9.1.3-5 / 9.1.3-6 9.1.3-5 / 9.1.3-6 9.1.3-9 9.1.3-9 9.1.0-6a / 9.1.0-6b 9.1.0-6a / 9.1.0-6b 9.1.0-9 / 9.1.0-10 9.1.0-9 / 9.1.0-10 9.1.0-1 1 / 9.1.0-12 9.1.0-1 1 / 9.1.0-12 9,1.0-16a 9.1.0-16a Fig, 9.1.3-1 Fig. 9.1.3-1 Fig. 9.1.3-3 Fig. 9.1.3-3 Fig. 9.1.3-0 Fig. 9.1.3-0 Fig. 9.1.0-5 Fig. 9.1.0-5 Fig. 9.1.0-7 Fig. 9.1.0-7 Fig. 9.1.0-10 Fig. 9.1.0-10 Fig. 9.1.0-12 Fig. 9.1.0-12 9.2.1-3 / 9.2.1-0 9.2.1-3 / 9.2.1-0 9.2.1-5 / 9.2.1-6 9.2.1-5 / 9.2.1-6 9.2.1-9 / 9.2.1-10 through 9.2.1-9 / 9.2.1-10 through 9.2.1-16 9.2.1-16 9.2.1-21 9.2.1-21 9.2.2-3 / 9.2.2-0 9.2.2-3 / 9.2.2-0 9.2.2-5 / 9.2.2-6 9.2.2-5 / 9.2.2-6 9.2.2-9 / 9.2.2-9a 9.2.2-9 / 9.2.2-9a 9.2.2-10 9.2.2-10 9.2.2-12 9.2.2-12 9.2.3-1 / 9.2.3-2 9.2.3-1 / 9.2.3-2 9.2.3-3 / 9.2.3-0 9.2.3-3 / 9.2.3-0 9.2.3-7 through 9.2.3-10 9.2.3-7 through 9.2.3-10 9.2.0-1 / 9.2.0-2 9.2.0-1 / 9.2.0-2 Amendment No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 9.2.5-3 / 9.2.5-0 9.2.5-3,/ 9.2.5-0 9.2.6-3 / 9.2.6-3a 9.2.6-3 / 9.2.6-3a 9.2.8-1 / 9.2.8-2 through 9.2.8-.1 / 9.2.8-2 through 9.2.&-6 9.2.8-6 9.2.9-3 9.2.9-3 9.2.9-0 9.2.10-1 / 9.2.10-2 9.2.10-1 / 9.2.10-2 9.2.10-3 / 9.2.10-0 9.2.10-3 / 9.2.10-0 9.2.10-5 9.2.10-5 9.2.10-8 9.2.10-8 Fig. 9.2.2-1 Fig. 9.2.'2-1 Fig. 9.2.2-3 Fig. 9.2.2-3 Fig. 9.2.2-5 Fig. 9.2.8-1 Fig. 9.2.8-1 Fig. 9.2.8-2 Fig. 9.2.8-2 Fig. 9.2.8-3 Fig. 9.2.8-3 Fig. 9.2.9-1 Fig. 9.2.9-1 Fig. 9.2.9-2 Fig. 9.2.9-2 Fig. 9.2.10-1 Sheet 1 Fig. 9.2.10-1 Sheet 1 9.3.1-3 / 9.3.1-0 9.3.1-3 / 9.3.1-0 9.3.1-5 / 9.3.1-5a 9.3.1-5 / 9.3.1-5a 9.3.2-1 / 9.3.2-2 9.3.2-1 / 9.3.2-2 9.3.2-3 / 9.3.2-0 9.3.2-3 / 9.3.2-0 9.3.2-6c / 6.3.2-6d through 6.3.2-6c / 9.3.2-6d through 9.3.2-9 9.3.2-9 9.3.3-1 / 9.3.3-2 through 9.3.3-1 / 9.3.3-2 through 9.3.3-5 / 9.3.3-6 9.3.3-6a 9.3.3-9 / 9.3.3-10 9.3.3-9 / 9.3.3-10 9.3.6-1 / 9.3.6-2 9.3.6-1 / 9.3.6-2 Fig. 9.3.2-2 Fig. 9.3.2-2 Fig. 9.3.2-3 Fig. 9.3.2-3 Fig. 9.3.0-1 Fig. 9.3 0-1 Fig. 9.3.0-2 Fig. 9.3.0-2 Fig. 9.3.0-3 Fig. 9.3.0-3 Fig. 9.3.0-5 Fig. 9.3.0-5 Amendment No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES Fig. 9.3.6-1 Fig. 9.3.6-1 9.0.0-1 / 9.0.0-2 through 9.0.0-1 / 9.0.0-2 through 9.0.0-13 9.0.0-13 9.0.0-15 9.0.0-15 9 0.0-26 9.0.0-26 9.0.0-30 9.0.0-30 9.0.0-31 9.0.0-31 9.0.0-32 9.0.0-32 9.0.0-30 9.0.0-30 9.0.1-1 / 9.0.1-2 9.0.1-1 / 9.0.1-2 9.0.1-3 / 9.0.1-0 through 9.0.1-3 / 9.0.1-0 through 9.0.1-14 9.0.1-10 9.0.1-18 through 9 0.1-21 9.0.1-18 through 9.0.1-21 9.0.2-3 / 9.0.2-0 9.0.2-3 / 9.0.2-0 9.0.2-5 / 9.0.2-6 9.0.2-5 / 9.0.2-6 9.0.2-9 through 9.0.2-1 I 9.0.2-9 through 9.0.2-1 la 9.0.3-5 / 9.0.3-6 through 9.0.3-5 / 9.0.3-6 through 9.0.3-13 9.0.3-13 9.0.3-15 9.0.3-15 9.0.3-16 9 0.3-16 9.0.3-18 9.0.3-18 9 0.3-19 9.0.3-19 9.0.3-21 9.0.3-21 9.0.3-22 9.0.3-22 9.0.3-23 9.0.3-23 9.0.3-25 through 9.0.3-30 9.0.3-25 through 9.0.3-30 9.0.3-33 9.0.3-33 9.0.3-30 9 0.3-30 9 0.3-35 9 0.3-35 9.0.0-1 / 9.0.0-2 through 9.0.0-1 / 9.0.0-2 through 9.0.0-6 9 0.0-6 9.0.0-8 9.0.0-8 9.0.0-10 9 0.0-10 9.0.0-11 9.0.0-1 I 9.0.0-12 9.0.0-12 9.0.0-10 9.0.0-10 9.0.0-16 9.0.0-16 9.0.0-16a 9.0.0-16a 9.0.0-17 9.0.0-18 "21- Amendment No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 9 0.5-3 / 9.0.5-0 through 9.0.5-3 / 9.0.5-0 through 9.0.5-7 / 9.0.5-8 9.0.5-8a 9.0.5-10 through 9.0.5-18 9.0.5-10 through 9.0.5-18a 9.0.5-20 through 9.0.5-20 9.0.5-20 through 9.0.5-20 9.0.5-27 9.0.5-27 9.0.7-1 / 9.0.7-2 through 9.0.7-1 / 9.0.7-2 through 9.0.7-7 9.0.7-7 9.0.7-9 9.0.7-9 9.0.7-10 9.0.7-10 9.0.7-11 9.0.7-1 I 9.0.9-1 / 9.0.9-2 through 9.0.9-11 9.0.10-1 / 9.0.10-2 through 9.0.10-5 Fig. 9.0.3-1 Fig. 9.0.3-1 Fig. 9.0.3-2 Fig. 9.0.3-2 Fig. 9.0.3-3 Fig. 9.0.3-3 Fig. 9.0.3-5 Fig. 9.0.3-5 Fig. 9.0.3-7 Fig, 9.0.3-7 Fig. 9.0.3-8 Fig. 9.0.3-8 Fig. 9.0.5-1 Fig. 9.0.5-1 9.5.1-1 / 9.5.1-2 through 9.5.1-1 / 9.5.1-2 through 9.5.1-5 / 9.5.1-6 9.5.1-5 / 9.5.1-6 9.5.1-9 / 9.5.1-10 through 9.5.1-9 / 9.5.1-10 through 9.5.1-13 / 9.5.1-10 9.5.1-10a 9.5.1-15 / 9.5.1-16 through 9.5.1-15 / 9.5.1-16 through 9.5.1-50a 9.5.1-50a 9.5.1-53 / 9.5.1-50 9.5.1-53 / 9.5.1-50 9.5.1-57 / 9.5.1-58 9.5.1-57 / 9.5.1-58 9.5.1-60 9.5.1-60 9.5.1-76 through 9.5.1-79 9.5.1-76 through 9.5.1-79 9.5.1-81a 9.5.1-88 9.5.1-89 9.5.2-3 / 9.5.2-0 9.5.2-3 / 9.5.2-0 9.5.0-1 / 9.5.0-2 9.5.0-1 / 9.5.0-2 9.5.0-3 / 9.5.0-0 9.5.0-3 / 9.5.0-0 9.5.0-5 / 9.5.0-6 9.5.0-5 / 9.5.0-6 9.5.0-6c / 9.5.0-6d 9.5.0-6c / 9.5.0-6d 9.5.0-6e / 9.5.0-6f 9.5.0-6e / 9.5.0-6f 9.5.0-9 9.5.0-9 22 Amendment No. 27

~ y I SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 9.5.5-1 / 9.5.5-2 9.5.5-1 / 9.5.5-2 9.5.5-3b 9.5.5-3b 9.5.6-1 / 9.5.6-2 through 9.5.6-1 / 9.5.6-2 through 9.5.6-0 9.5.6-5 9.5.7-3 / 9.5.7-0 9.5.7-3 / 9.5.7-0 9.5.7-0a 9.5.7-0a 9.5.7-8 9.5.7-8 9.5.8-1 / 9.5.8-2 through 9.5.8-1 / 9.5.8-2 9.5.8-3 / 9.5.8-0 9.5.8-3 / 9.5.8-0 Fig. 9.5.1-3 Fig. 9.5.1-3 Fig. 9.5.2-1 Fig. 9.5.2-1 Fig. 9.5.2-2 Fig. 9.5.2-2 Fig. 9.5.2-3 Fig. 9.5.2-3 Fig. 9.5.2-5 Fig. 9.5.2-5 Fig. 9.5.2-6 Fig. 9.5.6-1 Fig. 9.5.6-1 APPENDIX 9.5A APPENDIX 9.5A 9.5A-i / 9.5A-ii through 9.5A-i / 9.5A-ii through 9.5A-vi 9.5A-vi 9.5A-7 / 9.5A-8 through 9.5A-7 / 9.5A-8 through 9.5A-17 / 9.5A-18 9.5A-17 / 9.5A-18 9.5A-21 / 9.5A-22 through 9.5A-21 / 9.5A-22 through 9.5A-25 / 9.5A-26 9.5A-25 / 9.5A-26 9.5A-29 / 9.5A-30 9.5A-29 / 9.5A-30 9.5A-35 / 9.5A-36 through 9.5A-35 / 9.5A-36 through 9.5A-39 / 9.5A-00 9.5A-39 / 9.5A-00 9.5A-09 / 9.5A-50 9.5A-09 / 9.5A-50 9.5A-59 / 9.5A-60 9.5A-59 / 9.5A-60 9.5A-62 / 9.5A-63 9.5A-62 / 9.5A-63 9.5A-67 / 9.5A-68 through 9.5A-67 / 9.5A-68 through 9.5A-76 9.5A-76 9.5A-79 / 9.5A-80 9.5A-79 / 9.5A-80 9.5A-S 1 / 9.5A-82 9.5A-S 1 / 9.5A-82 8.5A-86 / 9.5A-87 9.5A-86 / 9.5A-87 9.6A-90 / 9.5A-91 9.5A-90 / 9.5A-91 9.5A-92 / 9.5A-93 9.5A-92 / 9.5A-93 9.5A-96 / 9.5A-97 9.5A-96 / 9.5A-97 9.5A-100 / 9.5A-101 9.5A-100 / 9.5A-101 9.5A-100 / 9.5A-105 9.5A-100 / 9.5A-105 9.5A-119 / 9.5A-120 9.5A-119 / 9.5A-120 9.5A-127 / 9.5A-128 9.5A-127 / 9.5A-128 23 Amendment No. 27

~ ) i SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 9.5A-130 / 9.5A-I 35 9.5A-I 30 / 9.5A-135 9.5A-107 / 9.5A-108 9.5A-107 / 9.5A-108 9.5A-156 / 9.5A-157 9.5A-156 / 9.5A-157 9.5A-158 / 9.5A-159 .

9.5A-158 / 9.5A-159 9.5A-170 / 9.5A-171 9.5A-170 / 9.5A-171 9.5A-17 la 9.5A-I7 la 9.5A-172 / 9.5A-173 through 9.5A-172 / 9.5A-173 through 9.5A-176 / 9.5A-177 9.5A-I76 / 9.5A-177 9.5A-180 / 9.5A-181 through 9.5A-180 / 9.5A-181 through 9.5A-182 / 9.5A-183 9.5A-1 82 / 9.5A-183 9.5A-186 / 9.5A-187 9.5A-186 / 9.5A-187 9.5A-189 / 9.5A-190 9.5A-189 / 9.5A-190 9.5A- 1 92 / 9.5A-193 9.5A-192 / 9.5A-193 9.5A-190 / 9.5A-195 9.5A-190 / 9.5A-195 9.5A-205 / 9.5A-206 9.5A-205 / 9.5A-206 9.5A-213 / 9.5A-210 through 9.5A-213 / 9.5A-210 through 9.5A-217 / 9.5A-218 9.5A-217 / 9.5A-218 9.5A-220m / 9.5A-220n 9.5A-220m / 9.5A-220n 9.5A-220o / 9.5A-220p 9.5A-220o / 9.5A-220p 9.5A-225 / 9.5A-226 9.5A-225 / 9.5A-226 9.5A-227 / 9.5A-228 through 9.5A-227 / 9.5A-228 through 9.5A-231 / 9.5A-232 9.5A-231 / 9.5A-232 9.5A-230 / 9.5A-235 9.5A-230 / 9.5A-235 9.5A-235a 9.5A-236 / 9.5A-237 9.5A-236 / 9.5A-237 Fig. 9.5A-2 Fig. 9.5A-2 Fig. 9.5A-3 Fig. 9.5A-3 Fig. 9.5A-6 through Fig. 9.5A-6 through Fig. 9.5A-19 Fig. 9.5A-19 Fig. 9.5A-21 through Fig. 9.5A-21 through Fig. 9.5A-29 Fig. 9.5A-29 Fig. 9.5A-31 . Fig. 9.5A-31 Fig. 9.5A-30 through Fig. 9.5A-30 through Fig. 9.5A-01 Fig. 9.5A-01 CHAPTER 10 CHAPTER 10 10-ii-a 10-ii-a Fig. 10.1.0-3 Fig. 10.1.0-3 Fig. 10.1.0-0 Fig. 10.1.0-0 Amendment No. 27

~ i ~

SHNPP CESAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 10.3.1-1 / 10.3.1-2 10,3.1-1 / 10.3.1-2 10.3.1-5 10.3.1-5 10.3.1-7 10.3.1-7 10.3.2-1 / 10.3.2-2 through 10.3.2-1 / 10.3.2-2 through 10.3.2-6 10.3.2-6 10.3.5-2a through 10.3.5-1 1 10.4.2-1 / 10.4.2-2 10.4.2-1 / 10.4.2-2 10.4.2-3 10.4.2-3 10.4.4-3 / 10.4.4-3a 10.4.4-3 / 10.4.4-3a 10.4.7-5 / 10.4.7-6 10.4.7-5 / 10.4.7-6 10.4.7-9 10.4.7-9 10.4.7-10 10.4.7-10 10.4.9-6a / 10.4.9-6b 10.4.9-6a / 10.4.9-6b APPENDIX 10.4.9B APPENDIX 10.4.9B 10.4.9B-14 through 10.4.9B-16 10.4.9B-14 through 10.4.9B-16 Fig. 10.4.5-1 Fig. 10.4.5-1 Fig. 10.4.7-2 Fig. 10.4.7-2 CHAPTER ll CHAPTER ll 1 1-v / 11-vi 11-v / 11-vi 11-vii 1 1-vii 11-xiv / 11-xv ll-xiv / ll-xv 11.1.1-1 / 11.1.1-2 11.1.1-1 / 11.1.1-2 11.1.1-16 11.1.1-16 1 1.1.2-2 11.1.2-2 11.1.6-1 / 11.1.6-2 through 1 1.1.6-1 / 1 1.1.6-2 through 11.1.6-4 11.1.6-4 11.1.8-1 11.1.8-1 11.2.1-3 / 11.2.1-4 1 1.2.1-3 / 1 1.2.1-4 11.2.1-10 1 1.2.1-10 11.2.1-21 11.2.1-21 11.2.1-26 11.2.1-26 Amendment No. 27

~ ~

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 11.2.2-1 / 11.2.2-2 11.2.2-1 / 11.2.2-2 11.2.2-3 / 11.2.2-0 11.2.2-3 / 11.2.2-0 Fig. I 1.2.2-1 Fig. 11.2.2-1 Fig. 11.2.2-2 Fig. 11.2.2-2 Fig. 11.2.2-0 Sheet I Fig. 11.2.2-0 Sheet I Fig. 11.2.2-0 Sheet 2 Fig. 11.2.2-0 Sheet 2 Fig. 11.2.2-5 Fig. I 1.2.2-5 11.3.2-1 / 11.3.2-2 11.3.2-1 / 11.3.2-2 11.3.2-5 / 11.3.2-6 11.3.2-5 / 11.3.2-6 11.3.2-10 11.3.2-10 11.3.2-23 through 11.3.2-25 11.3.2-23 through 11.3.2-25 11.3.3-5 11.3.3-5 11.3.3-8 11.3.3-8 I 1.0.1-3 11.0.1-3 I 1.0.1-6 11.0.1-6 11.0.2-1 / 11.0.2-2 I 1.0.2-1 / I 1.0.2-2 11.0.2-3 / 11.0.2-0 I 1.0.2-3 / I 1.0.2-0 11.0.2-0a / 11.0.2-0b 11.0.2-0a / 11.0.2-0b 11.0.2-5 / 11.0.2-6 I 1.0.2-5 / I 1.0.2-6 I 1.0.2-9 I 1.0.2-9 11.0.2-11 11.0.2-11 Fig. I 1.0.2-3 Fig. I 1.0.2-3 Fig. I 1.0.2-8 Fig. I 1.0.2-9 11.5.1-3 / 11.5.1-3a I 1.5.1-3 / I 1.5.1-3a 11.5.2-1 / 11.5.2-2 through 11.5.2-1 / 11.5.2-2 through 11.5.2-26 11.5.2-26 CHAPTER 12 CHAPTER 12 12-vii / 12-viii through 12-vii / 12-viii through I2-xi / 12-xi / 12-xii

/ I2-xix 12-xi'2-xvi<i I2-xviii / 12-x<x Fig. 12.1.1-1 Fig. 12.1.1-1 12.3.2-3 / 12.3.2-0 12.3.2-3 / 12.3.2-0 12.3.3-1 / 12.3.3-2 12.3.3-1 / 12.3.3-2 12.3.3-3 12.3.3-3 Amendment No. 27

1

~ g ~

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 12.3.0-1 / 12.3.0-2 12.3.0-1 / 12.3.0-2 12.3.0-3 / 12.3.0-0 12.3.0-3 / 12.3.0-0 12.3.0-7 / 12.3.0-8 12.3.0-7 / 12.3.0-8 12.3.0-8a / 12.3.0-8b 12.3.0-8a / 12.3.0-8b Fig. 12.3.2-2 through Fig. 12.3.2-2 through Fig. 12.3.2-17 Fig. 12.3.2-17 12.5.3-1 / 12.5.3-2 through 12.5.3-1 / 12.5.3-2 through 12.5.3-33 / 12.5.3-30 12.5.3-33 / 12.5.3-30 CHAPTER 13 CHAPTER 13 13-i / 13-ii 13-i / 13-ii 13-ii-a 13-v / 13-vi 13-v / 13-vs 13-vii / 13-viii 13-vii / 13-viii 13.1.1-1 / 13.1.1-2 through 13.1.1-1 / 13.1.1-2 through 13.1.1-87 13.1.1-89 13.1.2-1 / 13.1.2-2 through 13.1.2-1 / 13.1.2-2 through 13.1.2-10 13.1.2-10 13.1.3-1 through 13.1.3-00 13.1,3-1 through 13.1.3-52 Fig. 13.1.1-1 through Fig. 13.1.1-1 through Fig. 13.1.1-0 Fig. 13.1.1-0 Fig. 13.1.1-7 through Fig. 13.1.1-7 through Fig. 13.1.1-20 Fig. 13.1.1-20 Fig. 13.1.2-1 Fig. 13.1.2-1 Fig. 13;1.2-2 Fig. 13.1.2-2 13.2.1-1 / 13.2.1-2 through 13.2.1-1 / 13.2.1-2 through 13.2.1-3 / 13.2.1-0 13.2.1-3 / 13.2.1-0 13.2;l-l 1 13.2.2-5 13.2.2-5 13.2.3-1 / 13.2.3-2 13.2.3-1 / 13.2.3-2 Fig. 13.2.1-1 Fig. 13.2.1-1 Fig. 13.0.2-1 Fig. 13.0.2-1 Fig. 13.5.1 Fig. 13.5.1-1 27 Amendment No. 27

e

( ~, ~ ~

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES CHAPTER 10 CHAPTER 10 10-v / 10-vi 10-v / 10-vi 10.2.7-1 / 10.2.7-2 10.2.7-1 / 10.2.7-2 10.2.7-3 / 10.2.7-0 10.2.7-3 / 10.2.7-0 10.2.12-1 / 10.2.12-2 through 10.2.12-1 / 10.2.12-2 through 10.2.12-5 / 10.2.12-6 10.2.12-5 / 10.2.12-6 10.2.12-13 / 10.2.12-10 through 10.2.12-13 / 10.2.12-10 through 10.2.12-16a 10.2.12-16a 10.2.12-21 / 10.2.12-22 10.2.12-21 / 10.2.12-22 10.2.12-33 / 10.2.12-30 10.2.12-33 / 10.2.12-30 10.2.12-37 / 10.2.12-38 10.2.12-37 / 10.2.12-38 10.2.12-39 / 10.2.12-00 10.2.12-39 / 10.2.12-00 10.2.12-09 / 10.2.12-50 10.2.12-09 / 10,2.12-50 10.2.12-51 / 10.2.12-52 10.2.12-51 / 10.2.12-52 10.2.12-59 / 10.2.12-60 10.2.12-59 / 10.2.12-60 10.2.12-61 / 10.2.12-62 10.2.12-61 / 10.2.12-62 10.2.12-75 / 10.2.12-76 through 10.2.12-75 / 10.2.12-76 through 10.2.12-78c 10.2.12-78c / 10.2.12-78d 10.2.12-85 / 10.2.12-86 10.2.12-85 / 10.2.12-86 10.2.12-87 / 10.2.12-88 10.2.12-87 / 10.2.12-88 10.2.12-93 / 10.2.12-90 10.2.12-93 / 10.2.12-90 10.2.12-90a 10.2.12-90a 10.2.12-95 / 10.2.12-96 10.2.12-95 / 10.2.12-96 10.2.12-99 / 10.2.12-100 10.2.12-99 / 10.2.12-100 10.2.12-100a 10.2.12-101 / 10.2.12-102 10.2.12-101 / 10.2.12-102 Fig. 10.2.11-1 Fig.'10.2.11-1 Fig. 10.2.11-2 Fig. 10.2.11-2 CHAPTER 15 CHAPTER 15 15-xiv / 15-xv 15-xiv / 15-xv 15-xix / 15-xx through 15-xix / 15-xx through 15-xxv / 15-xxvi 15-xxv / 15-xxvi 15.0.3-5 through 15.0.3-8 15.0.3-5 through 15.0.3-8 15.0.13-5 / 15.0.13-6 15.0.13-5 / 15.0.13-6 15.0.13-7 15.0.13-7 15.1.0-1 / 15.1.0-2 through 15.1.0-1 / 15.1.0-2 through 15.1.0-5 15.1.0-5 15.1.5-3 / 15.1.5-0 through 15.1.5-3 / 15.1.5-0 through 15.1.5-7b 15.1.5-7b 15.1.5-9 15.1.5-9 Amendment No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES Fig. 15.1.0-1 ~

Fig. 15.1.0-1 Fig. 15.1.0-2 Fig. 15.1.0-2 Fig. 15.1.0-3 Fig. 15.1.0-3 Fig. 15.1.5-1 through Fig. 15.1.5-1 through Fig. 15.1.5-7 Fig. 15.1.5-7 15.2.3-1 / 15.2.3-2 through 15.2.3-1 / 15.2.3-2 through 15.2.3-7 15.2.3-7 15.2.6-5 / 15.2.6-5a 15.2.6-5 / 15.2.6-5a Fig. 15.2.3-1 through Fig. 15.2.3-1 through Fig. 15.2.3-8 Fig. 15.2.3-8 15.3.1-1 / 15.3.1-2 through 15.3.1-1 / 15.3.1-2 through 15.3.1-0 15.3.1-0 15.3.2-1 / 15.3.2-2 15.3.2-1 / 15.3.2-2 15.3.3-1 / 15.3.3-2 through 15.3.3-1 / 15.3.3-2 through 15.3.3-5 15.3.3-5 15.3.3-7 15.3.3-7 Fig. 15.3.1-1 through Fig. 15.3.1-1 through Fig. 15.3.1-8 Fig. 15.3.1-8 Fig. 15.3.2-1 through Fig. 15.3.2-1 through Fig. 15.3.2-8 Fig. 15.3.2-8 Fig. 15.3.3-1 through Fig. 15.3.3-1 through Fig. 15.3.3-15 Fig. 15.3.3-15 15.0.1-3 / 15.0.1-0 15.0.1-3 / 15.0.1-.0 15.0.1-5 15.0.1-5 15.0.2-1 / 15.0.2-2 15.0.2-1 / 15.0.2-2 15.0.2-6 15.0.2-6 15.0.3-6 15.0.6-1 / 15.0.6-2 15.0.6-1 / 15.0.6-2 15.0.6-3 / 15.0.6-0 15.0.6-3 / 15.0.6-0 15.0.6-5 15.0.6-5 15.0.8-3 / 15.0.8-0 15.0.8-3 / 15.0.8-0 15.0.8-7 / 15.0.8-8 15.0.8-7 / 15 0.8-8 15.0.8-8a 15.0.8-1 I / 15.0.8-12 through 15.0.8-11 / 15.0.8-12 through 15.0.8-10 15.0.8-10 Amendment No. 27

~

y

~ ~,

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES Fig. 15.0.1-1 Fig. 15.0.1-1 Fig. 15.0.1-2 Fig. 15.0.1-2 Fig. 15.0.1-3 Fig. 15.0.1-3 Fig. 15.0.2-1 through Fig. 15.0.2-1 through Fig. 15.0.2-9 Fig. 15.0.2-9 Fig. 15.0.7-3 Fig. 15.0.7-3 Fig. 15.0.8-1 through Fig. 15.0.8-1 through Fig. 15.0.8-0 Fig. 15.0.8-0 15.6.3-3 / 15.6.3-0 15.6.3-3 / 15.6.3-0 15.6.5-5 / 15.6.5-6 15.6.5-5 / 15.6.5-6 15.6.5-9 / 15.6.5-10 15.6.5-9 / 15.6.5-10 15.6.5-11 d / 15.6.5- 1 le through 15.6.5-lid / 15.6.5-lie through 15.6.5-10 15.6.5-10 Reference Page 15.6 Reference Page 15.6 Page Containing References Page Containing References 15.6.5-26 through 15.6.5-32 15.6.5-26 through 15.6.5-31 Fig. 15.6.5-2 Fig. 15.6.5-2 Fig. 15.6.5-0 through Fig. 15.6.5-0 through Fig. 15.6.5-17 Fig. 15.6.5-17 Fig. 15.6.5-19 Fig. 15.6.5-19 Fig. 15.6.5-21 Fig. 15.6.5-21 Fig. 15.6.5-22 Fig. 15.6.5-22 Fig. 15.6.5-25 through Fig. 15.6.5-25 through Fig. 15.6.5-30c Fig. 15.6.5-30c 15.7.1-3 15.7.1-3 15.7.0-3 / 15.7.0-0 15.7.0-3 / 15.7.0-0 15.7.0-6 15.7.0-6 15.7.0-7 15.7.0-7 CHAPTER 17 CHAPTER 17 17-<v 17.2.1-3 / 17.2.1-0 through 17.2.1-3 / 17.2.1-0 through 17.2.1-15 17.2.1-7 / 17.2.1-8 17.2.2-5 / 17.2.2-6 17.2.2-5 / 17.2.2-6 17.2.7-1 / 17.2.7-2 17.2.7-1 / 17.2.7-2 17.2.17-1 17.2.17-1 30 Amendment No. 27

SHNPP FSAR REMOVE INSERT EXISTING PAGES REPLACEMENT PAGES 17.2.19-1 / 17.2.19-2 17.2.19-1 / 17.2.19-2 TMI TMI TMI-16 TMI-16 TMI-29 TMI-29 TMI-00 TMI-00 TMI-59 through TMI-59 through TMI-60a TMI-60b APPENDIX A APPENDIX A 21 21 / 22 23 / 2O Amendment No. 27