RAIO-0118-58142 January 1, 2018 Docket No.52-048 U.S. Nuclear Regulatory Commission

ATTN: Document Control Desk

One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

NuScale Power, LLC Response to NRC Request for Additional Information No.

313 (eRAI No. 9312) on the NuScale Design Certification Application

REFERENCE:

U.S. Nuclear Regulatory Commission, "Request for Additional Information No.

313 (eRAI No. 9312)," dated December 22, 2017 The purpose of this letter is to provide the NuScale Power, LLC (NuScale) response to the referenced NRC Request for Additional Information (RAI).

The Enclosure to this letter contains NuScale's response to the following RAI Question from NRC eRAI No. 9312:

18-13 This letter and the enclosed response make no new regulatory commitments and no revisions to any existing regulatory commitments.

If you have any questions on this response, please contact Steven Mirsky at 240-833-3001 or at smirsky@nuscalepower.com.

Sincerely, Zackary W. Rad Director Regulatory Affairs

Director, NuScale Power, LLC Distribution: Gregory Cranston, NRC, OWFN-8G9A Samuel Lee, NRC, OWFN-8G9A Demetrius Murray, NRC, OWFN-8G9A : NuScale Response to NRC Request for Additional Information eRAI No. 9312 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com

RAIO-0118-58142 :

NuScale Response to NRC Request for Additional Information eRAI No. 9312 NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvalis, Oregon 97330, Office: 541.360.0500, Fax: 541.207.3928 www.nuscalepower.com

Response to Request for Additional Information Docket No.52-048 eRAI No.: 9312 Date of RAI Issue: 12/22/2017 NRC Question No.: 18-13 Title 10 of the Code of Federal Regulations (10CFR) Section 52.47(a)(8) requires an applicant for a design certification to provide a final safety analysis report (FSAR) that must include the information necessary to demonstrate compliance with any technically relevant portions of the Three Mile Island requirements set forth in 10 CFR 50.34(f), except paragraphs (f)(1)(xii),

(f)(2)(ix), and (f)(3)(v). Section 10 CFR 50.34(f)(2)(iii) requires an applicant to "Provide, for Commission review, a control room design that reflects state-of-the-art human factor principles prior to committing to fabrication or revision of fabricated control room panels and layouts.

Chapter 18, Human Factors Engineering, of NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, and NUREG-0711, "Human Factors Engineering Program Review Model, identify criteria the staff uses to evaluate whether an applicant meets the regulation. The applicant stated in the FSAR, Tier 2, Section 18.0, "Human Factors Engineering - Overview," that its human factors engineering (HFE) program incorporates accepted HFE standards and guidelines including the applicable guidance provided in NUREG-0711, Revision 3.

The applicant has, thus far, submitted for NRC review an implementation plan for the human factors verification and validation element of NUREG-0711 element. As part of this element NUREG-0711, Section 11.3 states that, If the applicant submits an IP, it should describe the complete methodology for conducting V&V, includingthe complete set of detailed scenarios for ISV (and how they were identified through the Sampling of Operational Conditions),

performance measures, and acceptance criteriaSummaries may be used for any of the above items provided that references are given for more detailed documents.

Specifically, Criteria 11.4.1.3 (1) in NUREG-0711 states that The applicant should identify operational conditions and scenarios to be used for HSI Task Support Verification, Design Verification, and ISV. The applicant should develop detailed scenarios suitable for use on a full-scope simulator. The level of detail should be comparable to what one would include in a test plan. For each one, the following information should be defined to reasonably assure that important dimensions of performance are addressed, and to allow the scenarios to be accurately and consistently presented for repeated trials:

a description of the scenario and any pertinent prior history necessary for personnel to understand the state of the plant at the start-up of the scenario NuScale Nonproprietary

specific initial conditions (a precise definition of the plants functions, processes, systems, component conditions, and performance parameters, e.g., similar to that at shift turnover) events (e.g., failures) that will occur during the scenario and their initiating conditions, e.g., based on time, or a value of a specific parameter precise definition of workplace factors, (e.g., environmental conditions, such as low levels of illumination) needs for task support (e.g., procedures and technical specifications) staffing level details of communication content between control room personnel and remote personnel (e.g., load dispatcher via telephone) scripted responses for test personnel who will act as plant personnel in the test scenarios the precise specification of what, when, and how data are to be collected and stored (including videotaping, questionnaires, and rating-scale administrations) precise specifications on simulator set up specific criteria for terminating the scenario During the staffs audit of the V&V methodology (the audit plan is available as ADAMS Accession No. ML17205A465), the staff reviewed scenario basis documents in the Electronic Reading Room. The scenario basis documents contain some, but not all, of the information listed in NUREG-0711, Criteria 11.4.1.3 (1). During the audit, NuScale staff explained that the complete scenarios will be developed prior to conducting integrated system validation testing in late 2018.

1. Please identify when the completed scenarios will be made available prior to ISV for the staff to complete its review of the V&V methodology.
2. Please explain whether the scenarios will docketed or if summaries of the scenarios will be docketed. Also, please explain whether the scenarios or summaries will be docketed before completion of the V&V RSR or included with the V&V RSR.

NuScale Response:

Response to Part 1. of the RAI The detailed scenario guides will be placed in the NRC electronic reading room by June 1, 2018. NuScale does not plan to docket the completed scenario guides. The verification and validation (V&V) results summary report (RSR) and the Integrated Systems Validation (ISV)

Test Report will be submitted on the docket and will contain a detailed summary of the completed scenarios.

Response to Part 2. of the RAI NuScale does not plan to docket the scenarios or the summaries of the scenarios. The scenario NuScale Nonproprietary

description and basis will be included in the ISV Test Report, similar to RP-0516-49116, Control Room Staffing Plan Validation Results for the Staffing Plan Validation (SPV). The ISV Test Report will be docketed concurrent with the V&V RSR.

Impact on DCA:

There are no impacts to the DCA as a result of this response.

NuScale Nonproprietary