ML17342B231

From kanterella
Jump to navigation Jump to search
Comment on Proposed Rule 10CFR50,App J Re Primary Reactor Containment Leakage Testing for water-cooled Power Reactors. Util Endorses Addition of Mass Point Methodology to Acceptable Leakage Rate Calculational Methods
ML17342B231
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/25/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR5985, RULE-PR-50 53FR5985-00004, 53FR5985-4, L-88-131, NUDOCS 8803310206
Download: ML17342B231 (3)


Text

AC CELERA~3) DISIRIBUYION

~

DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8803310206 DOC.DATE: 88/03/25 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Docketing 6 Services Branch

SUBJECT:

Comment supporting .& opposing proposed rule 10CFR50,App J re primary reactor containment leakage testing.

DISTRIBUTION CODE DS10D COPIES RECEIVED:LTR ENCL SIZE TITLE: SECY/DSB Dist: Public Comment on Propos Rule )-10CFR NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL INTERNAL: ARM/DRR/RPB NMSS/IMOB NRR/PMAS/ILRB12 OGC H ST

-B-18 OGC/SAIP15-B-18 G 01 RES DIR EXTERNAL: NRC PDR 02 Q QAk pb

'/0 TOTAL NUMBER OF COPIES REQUIRED: LTTR + ENCI

MRKET~Ibm O. B 000, JUNO BEACH, FL 33408.0420 RKPosiwHULf I g -QQ

~ C~>wz My'!>Nti"

'88 NR 28 P4:45 MARCH 2 5 1988 L-88-131 Secretary OFi'~C- .r:"..,.:-A, U. S. Nuclear RegulatqlI+'Nggih&Mn Attn: Docketing and Service"Branch 1717 H Street, N.W., Room 1121 Washington, D. C. 20555 Mr. Secretary:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Pro osed Rule Chan e 10 CFR 50 A endix J Florida Power & Light Company (FPL) provides the following comments concerning the proposed rule change to 10 CFR 50 Appendix J Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, published in the Federal Register, February 29, 1988.

(1) FPL endorses the addition of the Mass Point methodology to acceptable leakage rate calculational methods already incorporated into Appendix J.

(2) FPL disagrees with the coupling of the Mass Point methodology with a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test period.

Bases: Test period length should be based on the time necessary to gather enough data with a degree of accuracy to obtain a 95% confidence level that the measured leakage rate is accurate.

This is a statistical requirement independent of methodology. Coupling this methodology with a minimum 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test period will severely limit its use.

FPL appreciates this opportunity to comment on this rule change.

Very truly yours, W. F.'on y Acting Group Vice'resident Nuclear Energy WFC/RG/gp Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant RG.PRC ".

8803310206 880325 r~AR

-)9QQ g 9

,PDR PR cknowledged by c'ard...,.-, an FPL Group company 50 53FR5985 DCD