Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
PRZOR1TY 1 (ACCELERATED RZDS PROCESSING)
" REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9506290423 DOC.DATE: 95/06/21 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 p AUTH. NAME AUTHOR AFFILIATION
- STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power R RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Requests schedular exemption from 10CFR50 App J.
DISTRIBUTION CODE: A017D COPIES RECEIVED:LTR TITLE:
C ENCL OR Submittal: Append J Containment Leak Rate Testing SIZE: 0 NOTES:Standardized,plant. 05000530 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 0 PD4-2 PD 1 1 THOMAS,C 1 1 INTERNAL: ACRS 6 6 1 1 1 NRR/DE/ECGB 1 1 NRR DSSA/SCSB 1 1 OGC/HDS2 1 1 RES/DE/SEB 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
0 N
NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELIMZNATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 15.
/
Arizona Public Service Company P.O, BOX 53999 ~ PHOENIX, ARIZONA 85022-3999 102-03398-WLS/SAB/TNW WILLIAML. STEWART EXECUTIVEVICEPRESIDENT June 21, 1995 NUCLEAR U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Reference:
Letter dated October 21, 1987, from USNRC E. A Licitra, Senior Project Manager, Project Directorate V, to Mr. E. E. Van Brunt, Jr., ANPP/APS
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-530 Request for Schedular Exemption from 10 CFR 50 Appendix J Pursuant to 10 CFR 50.12, "Specific Exemptions," Arizona Public Service Company (APS) is requesting a one-time schedular exemption for PVNGS Unit 3 from the requirement of 10 CFR 50, Appendix J, Section III.D.1.(a). That section of Appendix J requires PVNGS Unit 3 to perform three overall Integrated Containment Leakage Rate Tests (ILRT) (also known as Type A tests) during each 10-year service period, gi
, with the third test of each set to be conducted during the Unit 3 shutdown for the 10-year plant inservice inspection (ISI).
The second Type A test for Unit 3 during the first 10-year ISI interval is currently scheduled to be performed in November of 1995, during the upcoming fifth refueling outage (3R5). This exemption request proposes that this Type A test be performed in April of 1997, during the sixth refueling outage (3R6). This would delay the performance for one outage and would correspond to an interval of 71 months between the first and second Type A test which would exceed the "approximately equal interval" clause of the aforementioned regulation. The visual inspection of the containment is not included in this exemption request and will be performed as originally scheduled during the fifth refueling outage (3R5).
This exemption request is consistent with the principles of a cost beneficial licensing action (CBLA) (i.e., an exemption from a requirement which is economically burdensome 9506290423 95062i PDR ADOCK 05000530 P PDR
l 4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Request for Unit 3 Schedular Exemption from 10 CFR 50 Appendix J Page 2
[approximately $ 1.9 million] to implement and has low safety impact). APS, therefore; requests that this exemption request be approved by'October 1, 1995, in order to eliminate the performance of the Type A test during the upcoming Unit 3 refueling outage.
\
Should you'have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, WLS/SAB/TNW/rv Enclosure cc: L. J. Callan K. E. Perkins K. E. Johnston B. E. Holian A. V. Godwin (ARRA)
e 1;
Ih
)'
ENCLOSURE 10 CFR 60 Appendix J Exemption Request Unit 3 Second Periodic Type A Test
1 e u'irements:
10 CFR 50.54(o), requires primary reactor containments for PWRs to be tested as set forth in 10 CFR 50, Appendix J, "Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors.." The Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Technical SpeciTication (TS) Section 4.6.1.2a, "Containment Leakage Surveillance Requirements." also requires that Type A tests be conducted in accordance with the requirements specified in Appendix J to 10 CFR 50, as modiTied by approved exemptions.
The periodic retest schedule for performance of Type A testing is specified in Section III.D.1.(a) of 10 CFR 50, Appendix J, and states, "After the preoperational leakage rate tests, a set of three Type A tests shall be performed, at approximately equal intervals during each 10-year service period. The third test of each set shall be conducted when the plant is shutdown for the 10-year plant inservice inspections."
Re ulato Bas's o S ecfc E e I n:
This exemption request is in compliance with sections (a)(1) and (a)(2)(ii) of 10 CFR
'0.12, "Specific Exemptions." This exemption request demonstrates"that the exemption will not present an undue risk to the public health and safety [(a)(1)], and, the application of the regulation'is not necessary to achieve the underlying purpose of the rule [(a)(2)(ii)].
Bck ou d'n the referenced letter the USNRC approved the use of a single ASME Code Edition, with Addenda, for all three Units at PVNGS. This represents, a relief from the requirements of 10 CFR 50.55a(g)(4)(i) which requires that inservice examination of components during the initial 120-month inspection interval must comply with the requirements in the latest edition and addenda of the Code incorporated by reference in '0 CFR 50.55a(b) on the date 12 months prior to the date of issuance of the operating license, subject to the limitations and modifications listed in paragraph (b) of this section.
The USNRC approved this request for relief with the condition that APS establish a common start date for the initial inspection interval based upon the average date of commercial service in accordance with ASME Section XI subparagraph IWA-2400(b).
The common start date for the initial inspection interval for PVNGS is March 1987.
The Unit 3 pre-operational Type A test was performed in September of 1986.
Commercial operation in Unit 3 was achieved in January of 1988. The first periodic Type A test was performed in May of 1991 during the second refueling outage in Unit 3 (3R2),
40 months from the date of Unit 3 commercial operation. The second periodic test is currently scheduled to be performed in November of 1995 during the fifth refueling outage (3R5), corresponding to an interval of 54 months. The third Type A test is currently Page 1 of 5
plann'ed to be performed during the seventh refueling outage (3R7) which would coincide with the completion of the first 10-year ISI interval.
Desc o o Ee o eues:
APS proposes a schedular exemption from 10 CFR 50, Appendix J, Section III.D.1.(a) regarding "approximately equal time intervals." Specifically, the proposed'exemption would allow APS to delay the Unit 3 second Type A test until the sixth refueling outage (3R6). The Type A test would tentatively be scheduled for April of 1997, and would increase the interval between the first and second Type A test from 54 months to 71 months. The third Type A test is not bei'ng altered by this exemption request and will remain scheduled for the seventh refueling outage (3R7). This exemption request proposes an increase to the interval between the first and second Type A test but does not alter the frequency of testing (three Type A tests performed in a ten year period) during the first 10 year ISI interval.
Justifica o o o osedE e o Type A testing is performed to determine that the total leakage from primary containment does not exceed the maximum allowable leakage rate, La, as specified in the PVNGS TS.
The primary containment maximum allowable leakage rate provides an input assumption to the calculation required to ensure that the maximum potential offsite dose during a design basis accident does not result in a dose in excess of that specified in 10 CFR 100.
The allowable La for PVNGS is 0.10 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, where Pa is defined as the calculated peak internal containment pressure related to the design basis accident, specified in the PVNGS TS as 49.5 psig. The acceptance criteria for the Type A test is 75 percent of La or 0.075 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa.
Mechanisms that could cause degradation of the containment can be categorized into two types: 1) degradation due to work which is performed as part of a.modification or maintenance activity on a component or system (activity based); or 2) degradation resulting from a time based failure mechanism (i.e., deterioration of the containment structure due to pressure, temperature, radiation, chemical or other such effects). To address the potential degradation due to an activity based mechanism, all modifications performed since the last Type A test were reviewed. There were no modifications performed that impact the boundaries tested during a Type A test, or the modifications have been, or will be, tested adequately to ensure that there is no degradation from an activity based mechanism. In addition, there are PVNGS administrative controls which ensure that an appropriate retest, including local leak rate testing, if applicable, is specified for maintenance activities which affect primary containment integrity.
Page 2 of 5
I"f Regalding time based failure mechanisms, the risk of a non-detectable increase in the primary containment leakage is considered negligible due to the 10 CFR 50 Appendix J Type B and C testing program. The existing Type B and C testing program is not affected by this exemption request and will continue to effectively detect containment leakage caused by time based failure mechanisms. Without actual accident conditions, structural deterioration is a gradual phenomenon which requires periods of time well in excess of the proposed 71-month test interval which would result by performing the second periodic Type A test during 3R6. Other than accident conditions, the'only external mechanism inducing stress of the containment structure is the test itself. The longer test interval would, therefore, lessen the frequency of stressing the containment. 10 CFR 50, Appendix J, Section V.A. requires a general inspection of the accessible interior and exterior surfaces of the containment structures and components to be performed prior to any Type A test to uncover any evidence of structural deterioration which may affect either the containment structural integrity or leak tightness. At PVNGS Unit 3, there has been no evidence of structural deterioration that would impact structural. integrity or leak tightness. Although the containment inspections 'required by Appendix J are limited in scope, they provide an important added level of confidence. Therefore, APS commits to perform the general containment inspection as originally scheduled, during the upcoming 3R5.
The preoperational and first periodic Type A tests performed in Unit 3 both passed the acceptance criteria with adequate margin. The test results were 0.0521 and 0.062 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, respectively. The Type A test results were confirmatory of the Type B and C tests, and demonstrate that PVNGS Unit 3 is a low-leakage containment. A test report for each of the Type A tests was submitted to the NRC in accordance with the reporting requirements of 10 CFR 50, Appendix J, Section V.B.
The 10 CFR 50, Appendix J, Type B tests are intended to detect, local leaks and to measure leakage across pressure containing or leakage limiting-boundaries other than valves, such as, containment penetrations incorporating resilient seals, gaskets, doors, hatches, etc. The 10 CFR 50, Appendix J, Type C tests are intended to measure primary containment isolation valve leakage rates. The frequency and scope of Type B and C testing are not being altered by this proposed exemption request. The acceptance criteria for Type B and C testing is 0.6 La, or 0.06 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa. This acceptance criteria (0.6 La) is for the sum of all valves and penetrations subject to Type B and C testing and represents a considerable portion of the Type A test allowable leakage. The test results of the combined Type B and. C leakage rates for Unit 3 are as shown in the following table:
Page 3 of 5
0 i 1'
t
,1 t
PVNGS Unit 3 Appendix J Type B 8 C Test Result History Pr n fL
(%/day)
I Pre-Operational Sep 1986 0.0004 0.4 Pre-Operational Nov 1987 0.0021 2.1 U3R1 Nov 1989 0.0038 3.8 U3R2 May 1991 0.0051 5.1 U3R3 Nov 1992 0.0048 4.8 U3R4 May 1994 0.0045 4.5 The Unit 3 test results are substantially below the allowable acceptance criteria for the combined Type B and C leakage rates. These test results demonstrate a good historic performance of the Containment Integrity system. The Type B and C testing program is not being altered by this exemption request and will continue to effectively detect containment leakage caused by activity based or time based failure mechanisms.
Nuclear industry experience gathered for the preparation of the draft version of NUREG 1493, "Performance-Based Containment Leak-Test Program," Revision 2, dated March 31, 1994, page 7-3, indicates that "...only a small percentage (3 percent) of leakages that exceed current requirements (referred to as Type A test failures) are actually detectable only by Type A testing. Further, the leak rates observed in these few Type A test failures were only marginally above currently prescribed limits."
A PVNGS plant specific analysis was performed to evaluate the potential for extending the Type A test frequency. The PVNGS plant specific analysis considered the extension of the interval to as much as 240 months. The conclusion of the analysis was that the extension of the Type A test interval has a negligible impact on overall risk. Although the exemption request submitted by this letter does not alter the frequency for performance of Type A testing (i.e., it still maintains a frequency of 3 tests per ten years), it is reasonable to conclude that the analysis supports the requested exemption from the requirement of 10 CFR 50, Appendix J, regarding "approximately equal intervals." With this exemption request the interval between the first and second Type A tests would be 71 months, whereas, the PVNGS plant specific analysis supports the use of a 240 month interval with a negligible impact on overall risk.
upon the above technical justification, we request a one-time schedular exemption
'ased of the requirements of 10 CFR 50, Appendix J, Section III.D.1.(a), in accordance with the criteria of 10 CFR 50.12. Specifically, the proposed exemption would allow APS to delay the Unit 3 second Type A test until 3R6 which is scheduled for April 1997.
Page 4 of 5
0 J'l
A 4
In accordance with 10 CFR-50.12, the NRC may, upon application, grant exemptions from the requirements of 10 CFR 50, which will not present an undue risk to the public health and safety, and where special circumstances are present. The PVNGS plant specific analysis supports the conclusion that the one-time schedular exemption will not present an undue risk to the public health and safety and is consistent with the common defense and security as required by 10 CFR 50.12(a)(1). Additionally, special circumstances are present. 10 CFR 50.12(a)(2)(ii) defines that special circumstances are present where, "Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule...." The underlying purpose of 10 CFR 50, Appendix J, Section III.D.1.(a) is to establish and maintain a level of confidence through testing that any primary containment leakage, during a hypothetical design basis accident, will remain less than or equal to the maximum allowable value, La.. Compliance with the "approximately equal intervals" clause of Appendix J, with regard to Type A testing, is not necessary to achieve the underlying purpose of the rule, as explained in the above technical justification.
E v ron e ta I ac o o osedExem to APS has determined that the proposed exemption request involves no changes in the amount or type of effluent that may be released offsite, and that there is no increase in individual or cumulative occupational radiation exposure. As such, operation of PVNGS Unit 3, in accordance with the proposed exemption request, does not involve an unreviewed environmental safety question.