ML17311A968

From kanterella
Jump to navigation Jump to search
Informs of Delay in Installation of CR Radio Communication Backup Batteries Until 950915
ML17311A968
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/20/1995
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03395-JML-S, 102-3395-JML-S, NUDOCS 9506290123
Download: ML17311A968 (4)


Text

t PRIORITY 1 (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBA:9506290123 DOC.DATE: 95/06/20. NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 P STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3g Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I

SUBJECT:

Informs of delay in installation of CR radio communication backup batteries until 950915.

DISTRIBUTION CODE: A050D COPIES RECEIVED: LTR ( ENCL P SIZE:

TITLE: OR Submittal: Station Blackout (USI A-44) 10CFR50.63, MPA A-22 NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 T RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD HOLIAN, B TRAN,L THOMAS,C INTERNAL: ACRS FILE CENTER 1 NRR/DE/EELB /BRPE/'P -4 1 NRR/DSSA/SPLB NRR/DSSA/SRXB 1 D EXTERNAL: NOAC NRC PDR N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415-2083) TO ELZMZNATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL

~E Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034 JAMES M. LEVINE 102-03395-JML/SAB/DRL VICE PRESIDENT NUCLEAR PRODUCTION June 20, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Reference:

Letter 161-04684, dated March 20, 1992, "Response to the NRC Station Blackout Safety Evaluation Recommendations," from W. F. Conway, APS, to USNRC

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Control Room Radio Communication Backup Batteries In the above referenced letter, Arizona Public Service Company (APS) described its intention to install a battery backup power source for the new control room radio system by the fifth operating cycle of Unit 1. Because resources were dedicated to refueling outage work, the battery backup units will not be installed until September 15, 1995. In the event of a station blackout, at least two forms of communication (the EPABX Telephone System and the sound powered phones) will still be available to provide all required communication. This delay is considered acceptable since the new radio system being installed, of which the backup batteries are a part, will only supplement the already adequate communication provided by the sound powered phones and the EPABX systems.

Should you have any questions, please contact Scott Bauer at (602) 393-5978.

Sincerely, JML/SAB/DRL/rv cc: L. J. Callan B. E. Holian K. E. Johnston K. E. Perkins P,I 9506290123 950620 PDR ADOCK 05000528 PDR ypI 0