Advises That Due to Need for Addl off-site Vendor Testing to Determine Root Cause of Component Failure Suppl to LER 94-005-00 Will Not Be Submitted Until Testing Completed on 950731
ML17311A596
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/25/1995
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03230-JML-B, 102-3230-JML-B, NUDOCS 9502020181
Download: ML17311A596 (6)


Text

NP RIG RITY (ACCELERATED RIDS VROCI'.SSIX(i>

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9502020181 DOC.DATE- 95/01/25 NOTARIZED: NO DOCKET N FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.rl. Arizona Public Service Co. (formerly Arizona Nuclear Power p RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R

SUBJECT:

Advises that due to need for addi off-site vendor testing to determine root cause of component failure suppl to LER 94-005-00 will not be submitted until testing completed on 950731.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Standardized plant. 05000529 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD HOLIAN, B TRAN, L INTERNAL: ACRS '1 AEOD/S PD/RAB AEOD/SPD/RRAB 1 F:I-LE CENTER 02 NRR/DE/ECGB 1 SRR/DE7EELB NRR/DE/EMEB 1, NRR/DIS P/PI PB NRR/DOPS/OECB 1' NRR/DRCH/HHFB NRR/DRCH/HICB NRR/DRCH/HOLB NRR/DRSS/PRPB 2 NRR/DSSA/SPLB D NRR/DSSA/SRXB 1 RES/DSIR/EIB RGN4 FILE 01 1 EXTERNAL: L ST LOBBY WARD LITCO BRYCE,J H NOAC MURPHY,G.A NOAC POORE,W.

NRC PDR NUDO 'S FULL TXT U

N iOTE TO ALL "R I DS" RECIP I EATS:

PLEASE HELP I:S TO REDL'CE O'ASTE! CO4TKC'I VOL'R I HE DOCL'Ill:4TCON'TROI.

DESK. ROOXI P l -37 (F XT. S%.2083 I TO EL I %II%ATE

'Oi SAXIE I ROTI DISTRIBL'TIOi LISTS I:OR DOCI.'ilI:i'I'S 5'Ol "I'i;I:.I)'OTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL

1 Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O, BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 102-03230-JML/BAG/RAS JAMES M. LEVINE January 25, 1995 VICE PRESIDENT NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 I

References:

Letter 192-00911-JML/BAG/RAS, dated November 18, 1994, from James M.

Levine, APS, to NRC, Licensee Event Report 94-005-00.

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 Ucense Event Report 94<050, Supplemental Response File: 9520-404 Licensee Event Report 94-005-00, submitted November 18, 1994, indicated that a supplemental report was expected to be completed by January 31, 1995. The results of the initial investigation into the events described in Licensee Event Report 94-005-00 have, however, necessitated additional off-site vendor testing in order to conclusively determine the root cause of the component failure. Due to this additional testing, Palo Verde will not be able to submit the LER supplement as expected.

The revised action plan for completing the root cause of failure evaluation includes:

Submitting the failed components and initial test data to Borg Warner to perform clearance/tolerance calculations.

Repeat the previous testing with a new stem/disk assembly, modifying some of the initial test parameters.

investigate the possibilities of a power circuit phenomenon which may be limiting current flow to the motor actuator.

The additional testing and investigative actions are expected to be completed by July 31, 1995, at which time the results will be communicated to the NRC in the form of a supplemental report to LER 94-005-00. The results of the initial investigation, as well as the need for additional off-site testing, were verbally communicated to Howard Wong, NRC Region Vl, Walnut Creek Field Office, on January 6, 1995.

950202018 I 950125 PDR ADOCK 05000529 S PDR

Ji U. S. Regulatory Commission ATTN: Document Control Desk License Event Report 94-005-00, Supplemental Response Page 2 If you have questions regarding this matter, please contact Burton A. Grabo, Section Leader, Nuclear Regulatory Affairs, at (602) 393-6492.

Sincerely, JML/BAG/RAS/pv cc: L J. Callan K. E. Perkins K. E. Johnston INPO Records Center