MONTHYEARML17300B3301999-09-14014 September 1999 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Making Listed Administrative Changes to TS 5.5.2 & TS 5.6.2 Re Primary Coolant Sources Outside Containment & Annual Radiological Environmental Operating Rept ML17313A9541999-05-26026 May 1999 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Reducing Spurious Reactor Trip Hazards Associated with Setpoints While Maintaining Plant Protection ML17313A8331999-02-26026 February 1999 Re-issue of Application for Amend to Licenses NPF-41,NPF-51 & NPF-74,re TS 3.5.3,ECCS - Operating,To Extend Completion Time for One Inoperable LPSI Subsystem from 72 Hours to 7 Days ML17313A8301999-02-26026 February 1999 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS 3.5.3, ECCS - Operating, by Extending Completion Time for One Inoperable LPSI Subsystem from 72 Hours to 7 Days ML17313A7091998-12-16016 December 1998 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing Condition G of TS 3.8.1 to Ensure That Appropriate Actions Will Be Taken to Prevent Double Sequencing of safety-related Loads ML17313A1571997-12-17017 December 1997 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Respectively.Amends Change TS 3/4.8.2 & Associated Bases 3/4.8,allowing Replacement of Existing Class 1E,125 Volt Dc Batteries W/Low Specific Gravity Cell Batteries ML17312B6391997-08-28028 August 1997 Application for Amend to License NPF-51,allowing one-time Extension of Required Surveillance Interval for Msi Sys Portion Only of ESFAS Logic ML17312B4651997-05-23023 May 1997 Rev to 950418 Application for Amends to Licenses NPF-41, NPF-51 & NPF-74,revising TS Section 3/4.4.4, Steam Generators & Associated Bases to Allow Installation of Tube Sleeves as Alternative to Plugging Defective SG Tubes ML17312B1541996-12-27027 December 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74 to Revise TS LCO 3.6.1.3.b of TS 3/4.6.1.3, Containment Air Locks, Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.6, Containment Structural Integrity. ML17312A8431996-06-28028 June 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Amending TS 3/4.5.2, ECCS Subsystems-Operating & Bases to Change SRs 4.5.2.d.2 & 4.5.2.d.3 to Reflect Design Basis Requirements for Anhydrous Trisodium Phosphate ML17300B2631996-06-17017 June 1996 Application for Amends to Licenses NPF-41,NPF-51 & NFP-74, Respectively,Changing Sections 1.10 & 3.2.8 & Associated Bases for Obtaining Thyroid Dcf Used in Definition of Dose Equivalent I-131 ML17312A6471996-04-0101 April 1996 Application for Amend to License NPF-51,revising TS 3/4/9.6 to Temporarily Allow Use of Hoist Instead of Refueling Machine for Movement of Fuel Assembly at Core Location A-07 ML17312A6381996-03-26026 March 1996 Application for Amend to License NPF-51,revising TS 3/4.9.6 to Increase Refueling Machine Overload Cut Off Limit to 2,000 Lb in Effort to Free Stuck Fuel Assembly from Core Location A-06 ML17312A6301996-03-26026 March 1996 Application for Amend to License NPF-51,revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432, STS for Combustion Engineering Plants. ML17312A6331996-03-23023 March 1996 Application for Amend to License NPF-51,revising TS SR 4.8.2.1.e, DC Sources, to Suspend Provision of TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Entry Into Mode 4 Following Sixth Refueling Outage ML17312A6251996-03-22022 March 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Modifying TS 3/4.8.1 for Purposes of Implementing Recommended Changes from NUREG-1432,GL 94-01 & GL 96-05 ML17312A5411996-02-0909 February 1996 Suppl Application for Amends to Licenses NPF-41,NPF-51 & NPF-74,implementing New Option B to 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors. ML17312A5221996-02-0101 February 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Respectively,Changing TS Sections 2.2.1 (Table 2.2-1) & 3/4.3.2 (Tables 3.3-3 & 4.3-2) to Specify Addl Restriction for Allowed Low Pressurizer Pressure Trip Setpoint ML17311B3131995-12-19019 December 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS for Implementation of 10CFR50,App J,Option B for Determining Test Frequency for Containment Leakage Rate Testing ML17311B2651995-11-0707 November 1995 Application for Amend to Licenses NPF-41,NPF-51 & NPF-74, Adopting Approved STS Format & Content of Section 5.0, Design Features, as Modified by Approved Changes to Improved STS ML17311B0931995-08-0303 August 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Adding Listed Analytical Method & Associated NRC SER to TS 6.9.1.10, Colr. Prorpietary PVNGS-3 Cycle 6 ECCS Performance Analysis Encl.Proprietary Analysis Withheld ML17311A9501995-06-13013 June 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Sections 3.5.1,3.5.2,3.7.11,3/4.8.1.1 & Bases to Extend AOTs for Sit,Lpsi Subtrain & EDG & Adding Bases for Extended Aots,Consistent w/NUREG-1366 & GL 93-05 ML17311A8631995-05-0202 May 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS 3.1.2.6,Figure 3.1-1, Min Borated Water Vols by Relocating Plant Elevations That Correspond to Min Required Water Vols for Spent Fuel Pool to Site Procedures ML17311A7531995-03-31031 March 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74. Amends Would Clarify Shutdown Margin Definition,Change shut- Down Margin Applicability & SRs to Comply W/Safety Analysis Assumptions for Subcritical Inadvertent CEA Withdrawal ML17311A5611994-12-28028 December 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Sections 3.9.6 & 4.9.6.1 Re Refueling Machine Overload Cut Off Limit ML17311A4901994-12-0707 December 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Requesting TS 3/4.7.5 to Change Bases for Ultimate Heat Sink from Providing 27 Day Cooling Water Supply to Providing 26 Day Cooling Water Supply ML17311A4481994-11-30030 November 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising LCO 3.2.1 & 3.2.4 & Associated Bases ML17311A4241994-11-22022 November 1994 Application for Amend to License NPF-41,proposing TS Section 3/4.7.1 by Adding Note to Table 3.7.2 ML17310B4491994-07-12012 July 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Requesting Amend to TS Table 3.3-3, ESF Actuation Sys Instrumentation. ML17310B4341994-06-17017 June 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Increasing Min Nitrogen Accumulator Pressure ML17310B4071994-06-17017 June 1994 Application for Amend to License NPF-41,NPF-51 & NPF-74 Proposing Ts,By Removing Five Tables of Component Lists, Per GL 91-08 ML17310B2691994-05-0404 May 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Clarifying TS LCO 3.4.8.3 & Surveillance Requirement 4.4.2.3.1 Applicability During Steady State Conditions in RCS Heatup/Cooldown Evolutions ML17310B1641994-03-28028 March 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing Min Condensate Storage Tank Indicated Level from 25 Ft to 29.5 Ft ML17310B0591994-02-18018 February 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Figure 3.2-1 for Units 1 & 3 & TS 3/4.1.1.4 & Bases 3/4.1.1.4 for Units 1,2 & 3 to Allow Units 1 & 3 to Operate at 100% Full Power Under Reduced Temp Regimen ML17310A8861994-01-0404 January 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74 Modifying Ts,Implementing Recommended Changes from GL 93-05, Line -Item TS Improvements to Reduce SR for Testing During Power Operation. ML17310A8891994-01-0404 January 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Proposing Changes to TS Section 3/4.2.3, Azimuthal Power Tilt, & Bases,Requesting Toprovide More Restrictive Azimuthal Power Tilt Limit When COLSS Out of Svc ML17310A8821993-12-30030 December 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing TS Section 3/4.3.2 by Modifying Tables 3.3-4,3.3-5 & Adding Figure 3.3-1 ML17310A8491993-12-0202 December 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74 Modifying TS by Removing Schedular Requirements for Type a Test to Be Performed Specifically at 40 + or - 10 Month Intervals ML17310A7871993-11-0505 November 1993 Application for Amend to License NPF-51,revising LCOs 3.5.2, ECCS, 3.6.2-1, CSS, 3.7.1.2, Afs, 3.7.3, EWS, 3.7.6, Ecw Sys & 3.7.11, Sdcs Under Exigent Circumstances ML17310A7251993-10-27027 October 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Section 1.18,6.9.1.8,6.14.c & 6.15.1 in Order to Implement Revised 10CFR50.36a Regulation That Now Allows Radioactive Effluent Release Rept to Be Submitted Annually ML17310A6131993-09-0808 September 1993 Application for Amend to License NPF-41,requesting TS Section 6.9.1.10 to Add Analytical Method Suppl Entitled Sys 80 Inlet Flow Distribution to List of Methods Used to Determine Core Operating Limits ML17310A5181993-08-0505 August 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-65, Requesting Change to Word Pressurizer to RCS for Item 4 in Tables 3.3-10 & 4.3-7 ML17310A4181993-06-30030 June 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS 3/4.3.2 to Request Addl Operating Margin in Time Response of Turbine Driven AF Pump to SG Low Level Signal ML17306B1981992-12-28028 December 1992 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Respectively,Revising TS 3/4.3.1,Table 4.3-1 & 3/4.3.2,Table 4.3-2,to Change Surveillance Requirements from Monthly to Quarterly for Several Channel Functional Tests ML17306A6891992-04-27027 April 1992 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Amending Tech Spec 3/5.7.6 & Bases of Section 3/4.7.6 to Reduce Essential Chilled Water Sys out-of-svc Time from 7 Days to 72 H ML17306A6091992-03-20020 March 1992 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Section 3/4.9.9 to Change Containment Purge Valve Isolation Sys Operability Requirements for Consistency W/Other Containment Penetration Operability Requirements ML17306A3761991-12-30030 December 1991 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Section 3.6.1.7 Action Statements Re Containment Purge Supply & Exhaust Valves for Consistency W/Other Containment Sys Action Requirements ML17306A3541991-12-20020 December 1991 Application for Amend to License NPF-74,adding Sentence to TS Section 5.3.1 to Allow Substitution of Up to Total of 80 Fuel Rods Clad W/Advanced zirconium-based Alloys Other than Zircaloy-4 in Two Fuel Assemblies.Rept Withheld ML17305B7301991-09-0909 September 1991 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing Tech Spec 3/4.7.11, Shutdown Cooling Sys to Delete auto-closure Interlock Surveillance of Surveillance Requirement 4.7.11b,per Generic Ltr 88-17 ML17305B7161991-08-28028 August 1991 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74. Proposed Amends Resolve Inconsistent Application of Exceptions to Tech Spec 3.0.4 & Specify Acceptable Time Limit for Completing Missed Surveillance 1999-09-14
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17300B3301999-09-14014 September 1999 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Making Listed Administrative Changes to TS 5.5.2 & TS 5.6.2 Re Primary Coolant Sources Outside Containment & Annual Radiological Environmental Operating Rept ML17313A9541999-05-26026 May 1999 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Reducing Spurious Reactor Trip Hazards Associated with Setpoints While Maintaining Plant Protection ML17313A8331999-02-26026 February 1999 Re-issue of Application for Amend to Licenses NPF-41,NPF-51 & NPF-74,re TS 3.5.3,ECCS - Operating,To Extend Completion Time for One Inoperable LPSI Subsystem from 72 Hours to 7 Days ML17313A8301999-02-26026 February 1999 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS 3.5.3, ECCS - Operating, by Extending Completion Time for One Inoperable LPSI Subsystem from 72 Hours to 7 Days ML17313A7091998-12-16016 December 1998 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing Condition G of TS 3.8.1 to Ensure That Appropriate Actions Will Be Taken to Prevent Double Sequencing of safety-related Loads ML17313A1571997-12-17017 December 1997 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Respectively.Amends Change TS 3/4.8.2 & Associated Bases 3/4.8,allowing Replacement of Existing Class 1E,125 Volt Dc Batteries W/Low Specific Gravity Cell Batteries ML17312B6391997-08-28028 August 1997 Application for Amend to License NPF-51,allowing one-time Extension of Required Surveillance Interval for Msi Sys Portion Only of ESFAS Logic ML17312B4651997-05-23023 May 1997 Rev to 950418 Application for Amends to Licenses NPF-41, NPF-51 & NPF-74,revising TS Section 3/4.4.4, Steam Generators & Associated Bases to Allow Installation of Tube Sleeves as Alternative to Plugging Defective SG Tubes ML17312B1541996-12-27027 December 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74 to Revise TS LCO 3.6.1.3.b of TS 3/4.6.1.3, Containment Air Locks, Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.6, Containment Structural Integrity. ML17312A8431996-06-28028 June 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Amending TS 3/4.5.2, ECCS Subsystems-Operating & Bases to Change SRs 4.5.2.d.2 & 4.5.2.d.3 to Reflect Design Basis Requirements for Anhydrous Trisodium Phosphate ML17300B2631996-06-17017 June 1996 Application for Amends to Licenses NPF-41,NPF-51 & NFP-74, Respectively,Changing Sections 1.10 & 3.2.8 & Associated Bases for Obtaining Thyroid Dcf Used in Definition of Dose Equivalent I-131 ML17312A6471996-04-0101 April 1996 Application for Amend to License NPF-51,revising TS 3/4/9.6 to Temporarily Allow Use of Hoist Instead of Refueling Machine for Movement of Fuel Assembly at Core Location A-07 ML17312A6381996-03-26026 March 1996 Application for Amend to License NPF-51,revising TS 3/4.9.6 to Increase Refueling Machine Overload Cut Off Limit to 2,000 Lb in Effort to Free Stuck Fuel Assembly from Core Location A-06 ML17312A6301996-03-26026 March 1996 Application for Amend to License NPF-51,revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432, STS for Combustion Engineering Plants. ML17312A6331996-03-23023 March 1996 Application for Amend to License NPF-51,revising TS SR 4.8.2.1.e, DC Sources, to Suspend Provision of TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Entry Into Mode 4 Following Sixth Refueling Outage ML17312A6251996-03-22022 March 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Modifying TS 3/4.8.1 for Purposes of Implementing Recommended Changes from NUREG-1432,GL 94-01 & GL 96-05 ML17312A5411996-02-0909 February 1996 Suppl Application for Amends to Licenses NPF-41,NPF-51 & NPF-74,implementing New Option B to 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors. ML17312A5221996-02-0101 February 1996 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Respectively,Changing TS Sections 2.2.1 (Table 2.2-1) & 3/4.3.2 (Tables 3.3-3 & 4.3-2) to Specify Addl Restriction for Allowed Low Pressurizer Pressure Trip Setpoint ML17311B3131995-12-19019 December 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS for Implementation of 10CFR50,App J,Option B for Determining Test Frequency for Containment Leakage Rate Testing ML17311B2651995-11-0707 November 1995 Application for Amend to Licenses NPF-41,NPF-51 & NPF-74, Adopting Approved STS Format & Content of Section 5.0, Design Features, as Modified by Approved Changes to Improved STS ML17311B0931995-08-0303 August 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Adding Listed Analytical Method & Associated NRC SER to TS 6.9.1.10, Colr. Prorpietary PVNGS-3 Cycle 6 ECCS Performance Analysis Encl.Proprietary Analysis Withheld ML17311A9501995-06-13013 June 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Sections 3.5.1,3.5.2,3.7.11,3/4.8.1.1 & Bases to Extend AOTs for Sit,Lpsi Subtrain & EDG & Adding Bases for Extended Aots,Consistent w/NUREG-1366 & GL 93-05 ML17311A8631995-05-0202 May 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS 3.1.2.6,Figure 3.1-1, Min Borated Water Vols by Relocating Plant Elevations That Correspond to Min Required Water Vols for Spent Fuel Pool to Site Procedures ML17311A7531995-03-31031 March 1995 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74. Amends Would Clarify Shutdown Margin Definition,Change shut- Down Margin Applicability & SRs to Comply W/Safety Analysis Assumptions for Subcritical Inadvertent CEA Withdrawal ML17311A5611994-12-28028 December 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Sections 3.9.6 & 4.9.6.1 Re Refueling Machine Overload Cut Off Limit ML17311A4901994-12-0707 December 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Requesting TS 3/4.7.5 to Change Bases for Ultimate Heat Sink from Providing 27 Day Cooling Water Supply to Providing 26 Day Cooling Water Supply ML17311A4481994-11-30030 November 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising LCO 3.2.1 & 3.2.4 & Associated Bases ML17311A4241994-11-22022 November 1994 Application for Amend to License NPF-41,proposing TS Section 3/4.7.1 by Adding Note to Table 3.7.2 ML17310B4491994-07-12012 July 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Requesting Amend to TS Table 3.3-3, ESF Actuation Sys Instrumentation. ML17310B4341994-06-17017 June 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Increasing Min Nitrogen Accumulator Pressure ML17310B4071994-06-17017 June 1994 Application for Amend to License NPF-41,NPF-51 & NPF-74 Proposing Ts,By Removing Five Tables of Component Lists, Per GL 91-08 ML17310B2691994-05-0404 May 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Clarifying TS LCO 3.4.8.3 & Surveillance Requirement 4.4.2.3.1 Applicability During Steady State Conditions in RCS Heatup/Cooldown Evolutions ML17310B1641994-03-28028 March 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing Min Condensate Storage Tank Indicated Level from 25 Ft to 29.5 Ft ML17310B0591994-02-18018 February 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Figure 3.2-1 for Units 1 & 3 & TS 3/4.1.1.4 & Bases 3/4.1.1.4 for Units 1,2 & 3 to Allow Units 1 & 3 to Operate at 100% Full Power Under Reduced Temp Regimen ML17310A8861994-01-0404 January 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74 Modifying Ts,Implementing Recommended Changes from GL 93-05, Line -Item TS Improvements to Reduce SR for Testing During Power Operation. ML17310A8891994-01-0404 January 1994 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Proposing Changes to TS Section 3/4.2.3, Azimuthal Power Tilt, & Bases,Requesting Toprovide More Restrictive Azimuthal Power Tilt Limit When COLSS Out of Svc ML17310A8821993-12-30030 December 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing TS Section 3/4.3.2 by Modifying Tables 3.3-4,3.3-5 & Adding Figure 3.3-1 ML17310A8491993-12-0202 December 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74 Modifying TS by Removing Schedular Requirements for Type a Test to Be Performed Specifically at 40 + or - 10 Month Intervals ML17310A7871993-11-0505 November 1993 Application for Amend to License NPF-51,revising LCOs 3.5.2, ECCS, 3.6.2-1, CSS, 3.7.1.2, Afs, 3.7.3, EWS, 3.7.6, Ecw Sys & 3.7.11, Sdcs Under Exigent Circumstances ML17310A7251993-10-27027 October 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Section 1.18,6.9.1.8,6.14.c & 6.15.1 in Order to Implement Revised 10CFR50.36a Regulation That Now Allows Radioactive Effluent Release Rept to Be Submitted Annually ML17310A6131993-09-0808 September 1993 Application for Amend to License NPF-41,requesting TS Section 6.9.1.10 to Add Analytical Method Suppl Entitled Sys 80 Inlet Flow Distribution to List of Methods Used to Determine Core Operating Limits ML17310A5181993-08-0505 August 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-65, Requesting Change to Word Pressurizer to RCS for Item 4 in Tables 3.3-10 & 4.3-7 ML17310A4181993-06-30030 June 1993 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS 3/4.3.2 to Request Addl Operating Margin in Time Response of Turbine Driven AF Pump to SG Low Level Signal ML17306B1981992-12-28028 December 1992 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Respectively,Revising TS 3/4.3.1,Table 4.3-1 & 3/4.3.2,Table 4.3-2,to Change Surveillance Requirements from Monthly to Quarterly for Several Channel Functional Tests ML17306A6891992-04-27027 April 1992 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Amending Tech Spec 3/5.7.6 & Bases of Section 3/4.7.6 to Reduce Essential Chilled Water Sys out-of-svc Time from 7 Days to 72 H ML17306A6091992-03-20020 March 1992 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Section 3/4.9.9 to Change Containment Purge Valve Isolation Sys Operability Requirements for Consistency W/Other Containment Penetration Operability Requirements ML17306A3761991-12-30030 December 1991 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Revising TS Section 3.6.1.7 Action Statements Re Containment Purge Supply & Exhaust Valves for Consistency W/Other Containment Sys Action Requirements ML17306A3541991-12-20020 December 1991 Application for Amend to License NPF-74,adding Sentence to TS Section 5.3.1 to Allow Substitution of Up to Total of 80 Fuel Rods Clad W/Advanced zirconium-based Alloys Other than Zircaloy-4 in Two Fuel Assemblies.Rept Withheld ML17305B7301991-09-0909 September 1991 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74, Changing Tech Spec 3/4.7.11, Shutdown Cooling Sys to Delete auto-closure Interlock Surveillance of Surveillance Requirement 4.7.11b,per Generic Ltr 88-17 ML17305B7161991-08-28028 August 1991 Application for Amends to Licenses NPF-41,NPF-51 & NPF-74. Proposed Amends Resolve Inconsistent Application of Exceptions to Tech Spec 3.0.4 & Specify Acceptable Time Limit for Completing Missed Surveillance 1999-09-14
[Table view] |
Text
RCCBLBRBTBD Dl TRIBOTION DBMONB TION SYSTEM I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9312130250 DOC.DATE: 93/12/02 NOTARIZED: YES DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit, 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amends to licenses NPF-41,NPF-42 & NPF-43 modifying TS by removing schedular requirements for type A D test to be performed specifically at 40 + or 10 month intervals. S DISTRIBUTION CODE'OOID COPIES RECEIVED:LTR Q ENCL I SIZE:
'TITLE: OR Submittal: General Distribution NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 D
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 1 1 PDV PD 1 1 HOLIAN,B 2 2 TRAN,L 2 2 INTERNAL: ACRS 6 6 NRR/DE/EELB 1 1 NRR/DORS/OTSB 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW 1 1 NRR/DSSA/SPLB .1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 REC PTI'1 DCB 1 1
0 1
OGC/HDS1 1 0 EXTERNAL: NRC PDR NSIC 1 1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELI INATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU D N'T NEED!
TOTAL NUMBER OF COPIES REQUIRE : LTTR 24 ENCL 22
Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX. ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICE PRESIDENT NUCLEAR 102-02748/WFC/RAB/RKR December 2, 1993 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37, Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Proposed Amendment to Technical Specification Section 3/4.3.6.1.2 File: 93-005-41 9.05 93-056-026 Pursuant to 10 CFR 50.90, Arizona Public Service Company (APS) submits a proposed amendment to Facility Operating License Numbers NPF-41, NPF-42, and NPF-43 to modify the Technical Specifications (TS) for PVNGS Units 1, 2, and 3, respectively. The proposed changes would modify TS 3/4.6.1.2 by removing the schedular requirements for a Type A (overall integrated containment leakage rate) test to be performed specifically at 40 + 10 month intervals and replacing these requirements with a requirement to perform Type A testing in accordance with Appendix J to 10 CFR 50. The proposed amendment will provide the flexibility needed in scheduling Type A tests to coincide with 18-month fuel cycles. The proposed changes to the schedular requirements are consistent with the surveillance requirements for 10 CFR 50, Appendix J testing in NUREG-1432, "Standard TS Combustion Engineering Plants."
Provided in the enclosure to this letter are the following:
A. Description of the Proposed Amendment Request B. Purpose of the Technical Specification C. Need for the Technical Specification Amendment D. Safety Analysis of the Proposed Technical Specification Amendment E. No Significant Hazards Consideration Determination F. Environmental Impact Consideration Determination G. Marked-up Technical Specification Pages 9312130250 'Ti'31202 PDR 'DOCK 05000528 PDR (
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Proposed Amendment to, Technical Specification Page 2 The Plant Review Board and Offsite Safety Review Committee have reviewed and approved the proposed amendment to TS 3/4.3.6.1.2. Pursuant to 10 CFR 50.91 (b) (1),
a copy of this request is being forwarded to the Arizona Radiation Regulatory Agency.
The proposed amendment is a Cost Beneficial Licensing Action. The proposed amendment will eliminate one to two Type A tests per Unit during each 10-year service period. Type A tests add two to three days to each outage. It also costs approximately
$ 200,000 to perform a Type A test.
As previously discussed with the NRC staff, APS requests NRC approval of the proposed amendment by April 1994 so that Unit 1 would not be required to shut down to perform Type A testing. Should you have any questions, please contact Richard A. Bernier at (602) 393-5882.
Sincerely, WFC/RAB/RKR/rv Enclosure cc: B. H. Faulkenberry J. A. Sloan A. V. Godwin
STATE OF ARIZONA )
)
OF IVIARICOPA ss.'OUNTY
)
I, W. F. Conway, represent that I am Executive Vice President - Nuclear, that the foregoing document has been" signed. by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true and correct.
W. F. Conway Sworn To Before Me This o2~~ Day Of 0~ ~, 1993.
Notary Public EAL RAMONA WRIGHT Notanr Publtt:- State ot Arhotta NrARICOPA COUNTY IIIIGmNot byhsAttg. 15, Nl
ENCLOSURE PROPOSED AMENDMENTTO TECHNICAL SPECIFICATION SECTION 3/4.3.6.1.2
's
'A. DESCRIPTION OF THE PROPOSED AMENDMENT REQUEST The proposed amendment to Technical Specification (TS) 3/4.3.6.1.2 makes the following specific changes to the Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 TS:
- Revises Surveillance Requirement 4.6.1.2.a to remove the specific requirement that the Type A tests be performed at 40 z 10 month intervals with the third test of each set conducted during the shutdown for the 10-year plant inservice inspection and replace it with the following:
a "Type A (Overall Integrated Containment Leakage Rate) testing shall be conducted in accordance with the requirements specified in Appendix J to 10 CFR 50, as modified by approved exemptions."
- Renumbers the remaining surveillance requirements for continuity. This is an administrative change. Consistent with the renumbering, the reference in Specification 4.6.1.1.c is revised from "Specification 4.6.1.2.d" to Specification 4.6.1.2.b."
B. PURPOSE OF THE TECHNICAL SPECIFICATION The TS required schedule provides only a 20-month window for scheduling of Type A tests. This requirement is not appropriate for a facility like PVNGS which uses an 18-month fuel cycle. An 18-month fuel cycle does not provide sufficient flexibility for three tests within a 10-year service period when limited by the stipulation that the tests be performed at 40 z 10 month schedules.
Experience at other units has demonstrated that the current TS test interval is too prescriptive. At the North Anna Power Station (which uses 18-month cycles) both units had to submit TS change requests to deviate from the TS specified Type A test schedule to allow the third test to coincide with the 10-year inservice inspection period. Virginia Electric and Power Company also submitted a similar amendment request on July 2, 1993. This was also recognized as part of the TS Improvement Program and as a result, NUREG-1432, "Standard TS Combustion Engineering Plants" only references Appendix J to 10 CFR 50 requirements for Type A tests.
To meet the current TS requirements of Type A testing every 30 to 50 months, a plant operating on an 18-month fuel cycle must perform a Type A test every other outage.
Page,1 of 5
I Following the first and second tests, at approximately 3 and 6 years, an extension must be requested to allow the third test to coincide with the 10-year inservice inspection outage. This request for extension has'normally been granted since there is no safety significance and the requirements of Appendix J to 10 CFR 50 are satisfied, which was the original intention of the TS. Therefore, Arizona Public Service Company (APS) proposes to revise the TS for PVNGS Units 1, 2, and 3 to refer to Appendix J to 10 CFR 50, which requires that tests be conducted at approximately equal intervals during the 10-year service period with the third test being conducted during the 10-year inservice inspection outage. This would typically result in tests being conducted at intervals of approximately 4.5 years, 3 years, and 3 years during the 10-year period.
C. NEED FOR THE TECHNICAL SPECIFICATION AMENDMENT The PVNGS TS currently requires a set of three Type A tests be performed specifically at 40 z 10 month intervals during each 10-year service period, with the third test of each set performed during the shutdown for the 10-year plant inservice inspection.
Appendix J to 10 CFR 50 requires that a Type A test of the containment be performed periodically. These tests are required to be scheduled as a set of three tests, to be performed at approximately equal intervals, during each 10-year service period, with the third set to coincide with the shutdown for the 10-year plant inservice inspection.
While the PVNGS TS essentially duplicate the requirements of Appendix J to 10 CFR50, the TS contain the additional requirement that Type A testing be performed at 40 z 10 month intervals. This additional requirement is too restrictive for units with 18-month fuel cycles. Therefore, APS proposes to revise the TS for PVNGS Units 1, 2, and 3 to delete the prescriptive schedular requirement for Type A testing and instead reference that Type A testing will be performed in accordance with Appendix J to 10 CFR 50.
D. SAFETY ANALYSIS OF THE PROPOSED TECHNICAL SPECIFICATION AMENDMENT Completion of acceptable Type A testing is a requirement for containment operability.
The proposed change would not change the general frequency. nor the required number of Type A tests. The proposed change does not affect the acceptance criteria nor the method in which the testing is performed. Only the prescriptive schedular requirements are being changed to conform with the requirements of the regulation and provide more flexibility in the scheduling of the tests.
Page 2 of 5
Based upon the following justification and the proposed TS changes, operation of PVNGS in accordance with Appendix J to 10 CFR 50, and without the specific test schedular requirements, would not involve an unreviewed safety question.
(1) The proposed changes would not involve an increase in the probability or the consequences of an accident previously evaluated. The proposed change only allows flexibilityin the scheduling of the three required Type A tests in the 10-year service period. The additional flexibility is needed for plants using 18-month fuel cycles to allow refueling outages and testing intervals to coincide. There is no change to the number of tests required, test methodology, or acceptance criteria.
(2) The proposed changes would not create the possibility of a new or different type of accident from any accident previously evaluated. The proposed change to the test schedule only provides flexibility in meeting the same requirement for three tests in a 10-year period. The testing type and bases have not changed.
Therefore, operation of the units with this more flexible test schedule will not result in an accident previously not analyzed in the Updated Final Safety Analysis Report (UFSAR). The proposed changes do not impact the design bases of the containment and do not modify the response of the containment during a design basis accident.
(3) The proposed changes would not involve a reduction in the margin of safety. The proposed changes to the schedule only provides flexibility in meeting the same requirement for three tests in a 10-year period. These proposed changes do not affect or change any limiting conditions for operation (LCO), or any other surveillance requirements in the TS, and the basis for the sur veillance requirement remains unchanged. The testing method, acceptance criteria, and bases are not changed. The TS continue to require testing that is consistent with the requirements of Appendix J to 10 CFR 50.
Based on the preceding evaluation, removing the specific schedule for Type A tests and making the other administrative changes to the TS will not adversely affect the safe operation of the units. Therefore, this proposed amendment for PVNGS Units 1, 2, and 3 does not result in an unreviewed safety question as defined by the criteria in 10 CFR 50.59 E. NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION PVNGS TS 3/4.6.1.2 currently requires a set of three Type A tests be performed specifically at 40 z 10 month intervals during each 10-year service period, with the third test of each set performed during shutdown for the 10-year plant inservice inspection. Appendix'J to 10 CFR 50 requires that a Type A test of the containment be performed periodically. These tests are required to be scheduled as a set of three Page 3 of 5
1 J
tests, to be performed at approximately equal intervals, during each 10-year service period, with the third test of each set to coincide with the shutdown for the 10-year inservice inspection. While the PVNGS TS leakage rate testing requirements essentially duplicate the requirements in Appendix J to 10 CFR 50, the TS additionally require the Type A test be performed at 40 z 10 month intervals. The TS requirement to conduct Type A tests at 40 z 10 month intervals is too restrictive and inconsistent with 18-month fuel cycles. Therefore, APS proposes to delete the detailed surveillance requirement for Type A tests, and instead, reference performance of Type A testing in accordance with Appendix J to 10 CFR 50, which is the basis for the surveillance requirement.
The proposed changes to the TS do not involve modifications to any of the existing equipment or affect the operation of existing systems. The reactor containment system reliability and operation are unchanged, therefore, they remain in accordance with the descriptions found in the UFSAR.
The proposed TS changes do not affect or change any other limiting condition for operation or surveillance requirements in the TS and the basis for the specifications remains unchanged. Periodic Type A tests will continue to be performed during the service life of each unit as required by Appendix J to 10 CFR 50. These proposed changes do not change the number of tests to be performed, test methodology, or test acceptance criteria. In essence, the specific requirement for 40 z 10 month test intervals is deleted.
The Commission has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92. A proposed amendment to an operating license for a facility involves a no significant hazards consideration if operation of the facility, in accordance with a proposed amendment, would not:
(1) Involve a significant increase in the probability or consequences of an accident previously evaluated or; (2) create the possibility of a new or different kind of accident from any accident previously evaluated or; (3) involve a significant reduction in a margin of safety. A discussion of these standards, as they relate to this amendment request, follows:
Standard 1 Involve a significant increase in the probability or consequences of an accident previously evaluated.
This amendment request does not involve a significant increase in the probability or consequences of an accident previously evaluated based on the safety analysis, b ause the proposed changes to the TS do not affect the assumptions, design parameters, or results of any UFSAR accident analysis. The proposed amendmen t does not add or modify any existing equipment. The proposed Type A testing schedule will still be consistent with Appendix J to 10 CFR 50. Therefore, the Page 4 of 5
~ ~
t~
proposed TS changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
Standard 2 Create the possibility of a new or different kind of accident from any accident previously analyzed.
This amendment request does not create the possibility of a new or different kind of accident from any accident previously analyzed since the proposed TS changes do not involve modifications to any of the existing equipment or affect the operation or design basis of the containment. The proposed changes do not modify the response of the containment during a design basis accident. The proposed changes only remove the restrictive schedular requirements for conducting Type A testing from the TS and substitute the schedule specified in Appendix J to 10 CFR 50. Therefore, the proposed TS changes would not create the possibility of a new or different kind of accident from any previously evaluated.
Standard 3 Involve a significant reduction in a margin of safety.
The margin of safety presently provided is not reduced by the proposed change in the schedular requirements for Type A tests. Although the changes allow more flexibility in scheduling Type A tests, the proposed amendment continues to ensure reactor containment system reliability by periodic testing. Since equipment reliability will be maintained, the proposed TS changes will not involve a significant reduction in margin of safety.
F. ENVIRONMENTALIMPACT CONSIDERATION DETERMINATION APS has determined that the proposed amendment involves no change in the amount or type of effluent that may be released offsite, and that there is no increase in individual or cumulative occupational radiation exposure. As such, operation of PVNGS Units 1, 2, and 3 in accordance with the proposed amendments, does not involve an unreviewed environmental safety question.
G. MARKED-UP TECHNICAL SPECIFICATION PAGES Units 1, 2, and 3; pages 3/46-1, 3/46-2 and 3/46-3 Page 5 of 5
l 0