ML17310A510

From kanterella
Jump to navigation Jump to search
Forwards Rev 04.01 to Procedure 41AO-1ZZ08, SG Tube Leak, Rev 00.07 to Procedure 41EP-1R004, Excess Steam Demand, Revised Figure 2.1.5-1 & Revised Pages 23,26 & 27 from Encl to 930723 Ltr,In Response to NRC Request Per 930804 Telcon
ML17310A510
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/09/1993
From: Bradish T
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17310A512 List:
References
102-02603-TRB-R, 102-2603-TRB-R, NUDOCS 9308130103
Download: ML17310A510 (6)


Text

ACCELERATE DOCUMENT DISTRIBUTION SYSTEM REGULAT INFORMATION DISTRIBUTION+STEM (RIDE)

ACCESSION NBR:9308130103 DOC.DATE: 93/08/09 NOTARIZED: NO DOCKET g .

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528-STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION BRADZSH,T.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECZP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 04.01 to Procedure 41AO-lZZ08, "SG Tube Leak," D Rev 00.07 to Procedure 41EP-1R004, "Excess Steam Demand,"

revised Figure 2.1.5-1 a revised pages 23,26 6 27 from encl TITLE: OR to 930723 ltr,in response to NRC request per 930804 telcon.

DISTRIBUTION CODE: AOOID NOTES:STANDARDIZED PLANT COPIES RECEIVED:LTR Submittal: General Distribution Q ENCL j SIZE: t 's9 ~ 8 05000528 S

Standardized plant. 05000529 Standardized plant. 05000530 "D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL .

PDV LA 1 1 PDV PD 1 1 TRAMMELL,C 2 2 TRAN,L 2 2 INTERNAL: ACRS 6 6 NRR/DE/EELB 1 1 NRR/DRCH/HICB 1 1 NRR/DRPW/OTSB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OC LFDCB 1 0 OGC/HDS1 1 0 REG 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'7 NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 21

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P,O. BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 102-02603-TRB/RAB August 9, 1993 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Steam Generator Tube Evaluation File: 93-056-026 During a conference call with Arizona Public Service Company (APS) on August 4, 1993, Ms. Linh Tran and members of the NRC staff requested copies of documents to aid them in their review of the PVNGS steam generator tube evaluation. Enclosed please find the requested documents.

Should you need further information, please contact Thomas R. Bradish at (602) 393-5421.

Sincerely, Thomas R. Bradish, Manager Nuclear Regulatory Affairs TRB/RAB/rv

Enclosures:

1. Procedure 41AO-1ZZ08, Steam Generator Tube Leak, Rev. 04.01
2. Procedure 41EP-1RO04, Excess Steam Demand, Rev. 00.07
3. Revised Figure 2.1.5-1 from the Enclosure to Letter 102-02585, dated July,25, 1993 4 Revised:Pages 23, 26, and 27 from the Enclosure to Letter 102-02585, dated July 25, 1993
5. Supplemental Information for the Enclosure to Letter 102-02585, dated July 25, 1993
6. Steam Generator Resin Intrusion

('308130103 PDR

930809 00 ADOCK 05000528 P PDR

1 ti

U.S. Nuclear Regulatory Commission ATlN: Document Control Desk, Steam Generator Tube Evaluation Page 2 cc: B. H. Faulkenberry J. A. Sloan L. N. Tran

~ ~

I