ML17306B387

From kanterella
Jump to navigation Jump to search
Forwards LER 93-001-00 Re Manual Reactor Trip Due to Steam Generator Tube Rupture & Valid Actuation of Safety Injection Actuation Sys & Containment Isolation Actuation Sys.Ler Also Describes Actuation of ECCS
ML17306B387
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/13/1993
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17306B388 List:
References
192-00837-JML-T, 192-837-JML-T, NUDOCS 9304190065
Download: ML17306B387 (4)


Text

ACCELEtu ~ED DOCUMENT DIS&uBUTION SYSTEM REGU .ORY INFORMATION DISTRIBU'1%F9 SYSTEM (RIDE)

ACCESSION NBR:9304190065 DOC.DATE: 93/04/13 NOTARIZED: NO DOCKET FACI'L:STN-50-529 Palo, Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards LER 93-001-00 re manual reactor trip due to steam generator tube rupture & valid actuation of safety injection actuation sys & containment isolation actuation sys.LER also describes actuation of ECCS.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR l ENCL TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

f SIZE: +I NOTES:Standardized plant. 05000529 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ONDD LA 1 1 ONDD PD 1 1 TRAMMELL,C 1 1 TRAN,L 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DORS/OEAB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRIL/RPEB 1 1 NRR/DRSS/PRPB 2 2 RR/MS/ SPLB 1 1 NRR/DSSA/SRXB 1 1 ZL 02 1 1 RES/DSIR/EIB 1 1 RGN5 FILE 01 1 1 EXTERNAL: EG&G BRYCEFJ.H NRC PDR 2

1 2

1 L ST LOBBY WARD NSIC MURPHY,G.A 11 1 1 NSIC POORE,W. 1 1 NUDOCS FULL TXT 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACI'HE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

~

g

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034 192-00837-JML/TRB/NLT JAMES M LEVINE VICE PACSlOENT April 13, 1993 NIjCLEAAPAQDUCTIQN U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Station Pl-37 Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station Unit 2 Docket No. STN 50-529 (License No. NPF-51)

Licensee Event Report 93-001-00 File: 93-020-404 Attached please find Licensee Event- Report (LER) 93-001-00 prepared and submitted pursuant to 10CFR50.73. This LER reports a Unit 2 manual reactor trip due to a steam generator tube rupture, and a valid actuationActuation of the Safety Injection Actuation System and the Containment Isolation System. In accordance with 10CFR50.73(d), a copy of this LER is being forwarded to the Regional Administrator, NRC Region V.

Pur'suant to Technical Specification 3.5.2, ACTION b, this LER also describes'he actuation of the Emergency Core Cooling System, and satisfies the Special Report requirements for documenting the total accumulated actuation cycles to date for Unit 2.

If you have any questions, please contact T. R. Bradish, Manager, Nuclear Regulatory Affairs at (602) 393-5421.

Very truly yours, JML/TRB/nit Attachment CC: W. F. Conway (all with attachment)

J. B. Martin J. A. Sloan INPO Records Center

~0 ~90068