MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] |
Text
ACCEL'ERATED D TRIBUTION DEMONSTRATION SYSTEM, ~
~
REGULATORY INFORMATION DISTRIBUTION .SYSTEM (RIDS)
CESSION NBR:9104260088. DOC.DATE: 91/04/19 NOTARIZED: NO' DOCKET 4 FACIL:STN-50-530 Palo Verde Nuclear Station,. Unit 3, Arizona Publi-.05000530 AUTH. NAME 'UTHOR. AFFILIATION CONWAY,W.F. Arizona Public, Service Co..(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT,AFFILIA'TION Document Control Branch (Document Control Desk) R
SUBJECT:
Responds to NRC 910321 ltr re violations noted in insp rept 50-530/91-01 on. 910106-0216.Corrective actions:memo to .
ensure that surveillance testing would -only be performed D during Modes 4,5 & 6 issued.
/ S DISTRIBUT1'ON CODE: IE01D COPIES RECEIVED: LTR I ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
/
NOTES:Standardized plant. 05000530 A
RECIPIENT COPIES REC1PIENT COPIES D ID CODE/NAME LTTR ENCL ID .CODE/NAME LTTR ENCL PD5 PD "1" '1 TRAMMELL,C 1 1 D THOMPSON,,M 1 1 S
INTERNAL: ACRS '2 ' AEOD .1 1 AEOD/DEIIB 1 1 AEOD/TPAB 1 -.1 1 1 NRR MORISSEAUjD 1 1 DEDRO'RR SHANKMAN,S 1. 1 NRR/DLPQ/LPEB10 1-. 1 NRR/DOEA/OEAB- 1 1 NRR/DREP/PEPB9D '.1'1 1 NRR/DRIS/DIR 1- 1 NRR/DST/DIR 8E2- 1 NRR/PMAS/ILRB12 1 1 1 1
'0 1 '
NUDOCS-ABSTRACT'GC/HDS1 1'
EG FILE 02 1 1 RGN5
EXTERNAL: EGGG/BRYCE, J. H. 1 1 NRC, PDR 1 1 NSIC 1 1 NOTES 1' D
S D
NOTE TO ALL "RIDS" RECIPIENTS:
I S PLEASE HEL'P US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiXI P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL '26
0
. ~
Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY , 102-02014-WFC/TRB/JJN EXEC&IVEVICEPRES1DENT NUCI.EAR April 19, 1991 U. S. Nuclear Regulatory Commission
.Attention: Document Control Desk Mail Station: Pl-37 Washington, DC 20555.
Reference:
Letter from R. P..Zimmerman,, Director Division of Reactor Safety and Projects, NRC to W. F. Conway, Executive Vice President Nuclear, Arizona Public Service',, dated March 21, 1991
Dear Sirs:
Subject:
Palo Verde Nuclear Generating-Station (PVNGS)
Unit 1, 2, and 3 Docket No.'TN 50-528'License No. NPF-.4'1)
Docket,No. STN 50-529 (License,No.,NPF-51) 0 This letter is Docket No. STN- 50-530 '(License No. NPF-74)
Reply to Notice of Violations 50-530/91-.01-01 and 530/91-01-02 File'1-070-026, provided in response to the inspection conducted by Messrs.
D. Coe, J. Ringwald, J. Sloan, D. Kirsch, and W. Ang from January 6 through February 16, 1991. Based upon the results of the inspection, two apparent violations of NRC requirements were identified. A restatement of the violations and APS's responses are provided in Appendix A and Attachment 1, respectively,, to this letter.
As requested in the referenced letter,, Attachment 2 provides APS's response regarding the adequacy of. the evaluations performed following identification of the Diesel Generator Air Receiver leakage. Should you have any questions regarding this response,,please contact me.
Very truly yours, WFC/TRB/JJN Attachments cc: J. B. Martin-D. H. Coe A. H. Gutterman A. C. Gehr
,920426008'lo429 F XIF iXIOCk;O~OOO..SI~
PXIli
0 ib
NRC Document Control Desk 102-02014-WFC/TRB/JJN Appendix A, Page 1 of 1 April 19, 1991 APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company Docket Number 50-530 Palo Verde Unit 3 License Number NPF-74 P
During an NRC inspection conducted, on January 6 through February 16, 1991, two violations of NRC requirements were identified. In accordance with the "General Statement of Policy and Procedure. for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1990),, the violations are listed below:
A. Palo Verde Unit 3 Technical Specifications Surveillance Requirement-4.8.1.1.2.d.l states "Each diesel generator shall be demonstrated OPERABLE: At least once per 18 months during shutdown by: 1, Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service."
Contrary to the above, the licensee performed manufacturer recommended inspections on Unit 3 Train "A" arid "B" diesel engines and electrical generators at various times between October 1990 and February 1991 while Unit 3 was being operated at power.
This is a Severity Level IV Violation (Supplement I) applicable to Unit 3.
B. 10 CFR Part 50, Appendix B, Criterion XVI, requires that measures be established to assure that conditions adverse to quality such as deficiencies, malfunctions, and defective material and equipment be promptly identified and corrected.
Contrary to the above,.manway cover gasket leakage in both EDG "A" starting air receivers, conditions adverse to quality, were identified in May 1990, but an appropriate evaluation had not been performed to identify potential impacts on safety function and the leakage had not been corrected as of February 1, 1991. The amount of air leakage from a receiver which can be experienced and still be considered capable of performing its specified function had not been determined, and'he leakage through the manway cover'askets had not been d'etermined.
This is a Severity Level IV violation (Supplement I) applicable to Unit 3.
r Il 0
0
NRC Document Control Desk 102-02014-WFC/TRB/JJN ,, Page 1 of 5 April 19, 1991 ATTACHMENT 1 REPLY TO NOTICE OF VIOLATION 50-530 91-01-01 I, REASON FOR THE VIOLATION The reason for the violation was an incorrect interpretation of the Technical Specification (TS) basis for performing vendor inspections whi'le shutdown. The TS statement "during shutdown" of surveillance requirement 4.8.1.1.2.d.l was interpreted as providing general guidance for vendor inspections that could not be performed within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement for online outages and therefore had to be performed during a plant shutdown when the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement would not apply. Those portions of the Surveillance Tests (ST) which implemented vendor inspections and could be performed within the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement were performed based on the premise that affirming the reliability of the Diesel Generator (DG) to the extent practical for vendor recommended inspections was prudent'I.
CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND THE RESULTS ACHIEVED The Vice President Nuclear Production discussed the event with cognizant plant management and issued a memorandum to ensure that surveillance testing would only be performed during Modes 4 (HOT SHUTDOWN), 5 (COLD
Ik t
Cl
NRC Document Control Desk 102-02014-WFC/TRB/JJN , Page 2 of 5 April 19, 1991 f
SHUTDOWN), and 6 (REFUELING - including core defueled) when TS state
'"during shutdown".
Additionally, Technical Specifications (TS) were reviewed to identify other Surveillance Requirements which are required'o be performed only when the Unit is shutdown. The Surveillance Tests (ST) which implement those Surveillance Requirements were reviewed to identify the tests which could potentially, be performed in Modes 1 (POWER OPERATION), 2 (STARTUP), and 3 (HOT STANDBY). Instruction Change Requests have been submitted to require specific precautions against performing these Surveillance Tests except in Modes 4, 5, and 6 (this includes core defueled).
III. CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID VIOLATIONS APS believes that the corrective steps described above will prevent recurrence.
IV. DATE WHEN FULL COMPLIANCE WAS ACHIEVED Full compliance was achieved on March 8, 1991, when the Vice President Nuclear Production issued a memorandum to ensure that testing would be performed only during Modes 4 (HOT SHUTDOWN), 5 (COLD SHUTDOWN), and 6 (REFUELING - including core defueled)'hen TS state "during shutdown".
Oi Ci
~lb
NRC Document Control Desk 102-02014-WFC/TRB/JJN , Page 3 of 5 April 19, 1991 REPLY TO NOTICE OF VIOLATION 50-530 91-01'-02 APS does not believe that a violation of regulatory requirements 'occurred.
However,, in reviewing the circumstances surrounding this issue APS recognizes the need to enhance the review process of safety related deficiencies to ensure that the design bases are maintained. Results of that review are contained in Attachment 2.'.
REASON FOR THE DENIAL The Diesel Generator air receiver leak was identified, repo'rted, and evaluated in accordance with APS's administrative controls. APS believes that the determination of operability and scheduling of maintenance was appropriate for the condition identified. The'air compressors were observed to be running'nly one to two minutes per cycle to restore air pressure in the receivers in accordance with design. Following this, the air receiver pressure was observed to remain between the nominal setpoints of 240'o 250 psig (the setpoints for cycling the compressor on and off) for several minutes. [Note'.. The evaluations discussed in Attachment 2 showed the highest observed receiver leakage resulting in compressor operation of about a minute and a half approximately every 17 minutes.] The minimum, pressure required for operability is 175 psig. Accordingly, it was apparent that the specific leak at the air receiver manway cover, as part of nominal
0 Oi 0'
NRC Document Control Desk 102-02014-VFC/TRB/JJN , Page 4 of 5 April 19,. 1991 .
P system leakage, was not close to a level .whi'ch would render inoperable or significantly degrade the Diesel Generator.
APS believes that any significant increase in the a'ir leakage that could have invalidated the initial evaluation would have been 'identified during shiftly .tours by direct observation of the leak, the air receiver pressure, or by the operating time of the compressor. Additionally,. the control room is provided wi'th a low pressure alarm.
II. CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND THE RESULTS ACHIEVED To reverify the operability of the DG and to ensure that the DG starting air receiver woul'd continue to meet its,design basis as described in the Final Safety, Analysis Report (FSAR), the evaluations= described in Attachment 2 were conducted. These evaluations confirmed the initial operability determination described above.
'I III. CORRECTIVE STEPS THAT VILL BE TAKEN TO AVOID VIOLATIONS I
Although APS believes that no vi'olation of regulatory requirements occurred,, Attachment 2'describes enhancements which APS'elieves will avoid the possibility of violations of this type.
0 Il 0
I NRC Document Control Desk 102-02014-WFC/TRB/JJN. , Page '5 of '5 April 19, 1991 IV. DATE WHEN FULL COMPLIANCE VAS 'ACHIEVED
'Full compliance was achieved at all times.
41 0
0 II
NRC Document Control Desk .
102-02014-WFC/TRB/JJN: ,, Page 1 of 3 April 19, 1991 ESPONSF. TO COVER LETTER VALUATION ASSESSMENT The cover letter to NRC Inspection Report 50-'528", '529:, and '530-91-01 requested an assessment of the adequacy .of .the evaluations performed following'.
identification of the EDG air start system leakage. To assess whether the May 1990 determination of operability was adequate, .two evaluations were performed as follows:
f On February 28, 1991, an Engineering -Evaluation was initiated to determine the acceptable air leaka'ge rate for the Starting 'Air Subsystem and to determine the current air 1'eakage rate from the Starting. Air Subsystem and to compare the two. This evaluation showed the allowed maximum leakage rate to,be one where the air compressor(s) was not, capable of maintaining the minimum air pressure in one receiver. The air leakage rate was such that 'this criteria.
was met at all times.
On March 20, 1991, a Non Conformance document (MNCR) was initiated to request definition of the word "after" in,the- Updated Final Safety Analysis Report sentence, "The DGSS (Diesel Generator Starting System) shall remain functional during and after SSE (Safe Shutdown'arthquake)." The word "after" was dispositioned to mean immediately after an 'SSE. Since the DGSS is designed to withstand a'SSE and start the diesel generator in response to loss of offsite power that occurs concurrent with or immediately 'after the SSE, minor leakage does'not render the DGSS incapable of performing its intended safety function and is therefore in agreement with the PVNGS UFSAR statement.
The two aforementioned evaluations substantiate the evaluation conducted in May 1990 that the Diesel'enerator continued to be OPERABLE despite the minor air leakage. However, in reviewing this'tem, APS has recognized that, although the evaluation ultimately showed compliance with regulatory requirements, the evaluation process for determining whether conditions may render equipment inoperable based on not meeting its design basis could be improved. The following explanation of the present process for evaluating deficiencies is provided with an explanation, of changes, being developed to the process.
Presently, anyone at .Palo Verde who discovers, a plant hardware deficiency is
41 0
Cl
NRC Document Con'trol Desk 102-02014-WFC/TRB/JJN , Page 2 of 3 April 19, 1991 directed to prepare a Work Request to identify the problem~. The Work Request is then given to a Licensed Operator for an initial determination of operability/reportability in accordance with the. Technical Specifications'nd 10CFR50.72/73 and for initial determination of priority. The present priority system provides two priorities for work to be done on a real time basis (work must begin within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />), two priorities which allow scheduling of work into the future, and one priority for outage work.
The personnel reviewing Work Requests have a detailed understanding of the
,power plant from an operational and system aspect and, in all but a few cases, are fully capable of making determinations of the importance of the problem identified. However, a few cases may arise in which certain design. bases may not be obvious or explicitly contained in the Technical Specifications. As such,. the personnel reviewing work orders may .not be fully cognizant of the intricacies of some design bases. In those cases, there exists the possibility of assigning a priority which allows scheduling'of work into the future when, in fact, the work should be performed on a real time basis.
To address this issue, Palo Verde is clarifying the System Engineering program to include a.requirement for the System Engineer to review open safety related work requests,'which potentially could impact system availability, on a periodic basis to ensure potential design bases concerns do not exist for identified deficiencies. Concerns. identified through this process will be documented through the Material Non-Conformance program to ensure timely evaluation and/or correction of the deficiency. Documentation of the reviews of work requests which do not become MNCRs will be maintained in accordance with engineering department procedures.
Addition of this requirement should ensure the System Engineer provides engineering expertise to assure reliable availability of assigned system(s) as presently required by the System Engineering. program. This additional step will also assure that the requirements of 10CFR50 Appendix B Criterion XVI are consistently applied.
INTENA CE SCHEDULING AND PLANNING The cover letter also stated that the two apparent violations appeared to indicate weaknesses in the maintenance scheduling and planning process. As a point of clarification, the following is provided.
As discussed in the responses to the violations (Attachment 1), neither condition identified was attributable to a weakness in our scheduling and planning of maintenance. In the first example, an incorrect interpretation of
~An individual may als'o initiate a MNCR for a hardware deficiency. However, this document receives the type of review necessary to ensure the design basis continues to be met.
0 NRC Docume'nt Control Desk3'02-02014-WFC/TRB/JJN'pril Attachment .2, Page 3 of 19, 1991 Technical Specifications resulted in 'the p'erformance of work at power. In the second case, although APS believes no. violation of regulatory requirements occurred, maintenance scheduling was based on an assigned priority with our program. The, ingredient missing from the scheduling was a in'ccordance review by engineering that justified the. schedule. Neither of these conditions reflect a w'eakness .in the maintenance scheduling and planning, process.
Additionally, as discussed recently with NRC regional management, APS has implemented strict controls with. regard to removing safety-related equipment from service for maintenance.: These controls. demonstrate APS management's