MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
ACCELERATEA. DOCUMENT DISTRIBUTION SYSTEM REGUL~Y INFORMATION DISTRIBUTI SYSTEM (RIDE)
~ I ACCESSION NBR:9310070193 DOC.DATE: 93/10/03 NOTARIZ'$D: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME- SUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to License NPF-2l,requesting Tech Spec 3/4.3.2 re isolation actuation instrumentation response time testing under emergency circumstances.
DISTRIBUTION CODE: EOOID COPIES RECEIVED:LTR ! ENCL / SIZE: 7+ S TITLE: OR Submittal: General Distribution NOTES: A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 1 1 PDV PD 1 1 CLIFFORD,J 2 2 D INTERNAL: -ACRS 6 6 NRR/DE/EELB 1 1 S NRR/DORS/OTSB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OCA CB 1 0 OGC/HDS1 1 0 01 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUh4ENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAhIE FICO'ISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bm 96'8 ~ 3000 Geode Wasbfnglon Way ~ Richland, Wasbingion 99352 ~ (509) 372-5000 October 2, 1993 G02-93-242 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENTTO TECHNICAL SPECIFICATION 3/4.3.2, ISOLATION ACTUATION INSTRVAKÃTATIONRESPONSE TIME TESTING UNDER I<22ERGENCY CIRCUMSTANCES References; 1. Letter, GO2-91-159, JW Baker (SS) to NRC dated August 29, 1991, "Licensee Report No 91-013-02"
- 2. Letter, GO2-93-202, JV Parrish (SS) to NRC dated August 6, 1993, "Licensee Event Report No 93-010-04"
- 3. General Electric Report NEDC-32013P, "System Analysis for Elimination of Selected Response Time Testing Requirements," dated March 1992 (proprietary)
- 4. Letter, GO2-93-241, JV Parrish (SS) to NRC, "Request for Discretionary Enforcement for Technical Specification 3/4.3.2, Isolation Actuation Instrumentation," dated October 2, 1993 In accordance with the Code of Federal Regulations, Title 10, Parts 50.90, 2.101, and 50.91(a)(5), the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications on an emergency basis as provided for in the regulations. Specifically, the Supply oo 9310070193 931003 PDR ADOCK 05000397 P ',
PDJ?
i,l J
V i
N 4
-p9" 9GVO C
p 1
'.k
t REQUEST FOR AMENDMENTTO TECHNICALSPECIFICATION3/4.3.2, ISOLATION ACTUATIONINSTRUMENTATIONRESPONSE TIME TESTING UNDER t
EMERGENCY CIRCUMSTANCES System is requesting that a note be added to Isolation Actuation Instrumentation Surveillance Requirement 4.3.2.3 to defer response time testing for Isolation Groups 3 and 4 as a criterion for Operability until entry into a Cold Shutdown condition no later than startup from the Spring 1994 Refueling Outage (Attachment 1).
The requested note will allow continued operation without entry into Action Statements 20 and 25 requiring plant shutdown and Standby Gas Treatment System operation. As reported in Reference 4, on October 1, 1993 a condition of noncompliance with WNP-2 Specifications was identified as part of a long term systematic review of plant procedures where it was determined that certain relays providing actuation signals to Group 3 and 4 isolation valves were not being response time tested as required by surveillance 4.3.2.3. Absent performance of the response time testing, Limiting Condition for Operation 3.3.2.b requires entry into the Action Statements listed in Table 3.3.2-1, Isolation Actuation Instrumentation which, in turn, require Plant shutdown and operation of the Standby Gas Treatment System. Further, Plant Staff determined that it is not desirable to perform response time testing of this instrumentation at power because of the potential for causing inadvertent relay actuation by physical contact or electrical shorting due to the tight configuration of the relay cabinet and the many temporary connections that must be made.
Until this issue was identified by the Technical Specification Surveillance Improvement Project, there was no reason to believe that the relays were not being response time tested in accordance with the Technical Specifications. As the lack of responsetime testing of these relays was just identified, it was not possible to submit this request on a more timely basis. It is considered to be less risk to defer the response time testing of these relays to the next Cold Shutdown condition instead of testing them at power. The Supply System believes there is less risk in relying on the existing test data than commencing a near term plant shutdown in order to gain actual test data immediately in cold shutdown conditions as required by the existing Technical Specifications.
It should be noted that, because the Technical Specification Surveillance Improvement Project is an in-depth technical review of the surveillance procedures to ensure they meet the Technical Specification surveillance requirements, other conditions of noncompliance with the WNP-2 Technical Specifications may be identified in the future.
cri tion f onditi n On October 1, 1993, a condition of noncompliance with the WNP-2 Technical Specifications was identified as part of the Technical Specification Surveillance Improvement Project. This two-year project was recommended by a Supply System Quality Action Team formed as a corrective action of LER 91-013-02 (Reference 1). The Technical Specification Surveillance Improvement Project revises and broadens the scope of the Surveillance Procedure Verification Program
~ ~
REQUEST FOR AMENDMENTTO TECHNICALSPECIFICATION 3/4.3.2, ISOLATION ACTUATIONINSTRUMENTATIONRESPONSE TIME TESTING UNDER EMERGENCY CIRCUMSTANCES completed in May 1991. Additional details of this program and previous findings are provided in LER 93-010-04 (Reference 2).
During the performance of the Technical Specification Surveillance Improvement Project review for compliance with the requirements associated with Technical Specification Surveillance 4.3.2.3 and Table 4.3.2.1-1, it was noted that portions of the automatic isolation actuation logic are not response time tested. The specific components identified as not response time tested are the final actuation electro-mechanical relays for a portion of isolation groups 3 and 4 (these relays do not actuate other group isolations) which are actuated in turn from the Reactor Low Water Level 2, High Drywell Pressure, or Reactor Building Vent Exhaust Plenum High Radiation relays (see attached figure). Refer to Technical Specification Table 3.6.3-1 for containment isolation group designations. The existing response time testing procedures measure the system response time from the sensed parameter through two (out of a total of nine in two channels and out of a total of ten in the other two channels) relays per channel at the appropriate level of the system logic per division. In each case, these two relays are parallel with, and of the same manufacturer and model type as the untested relays in each channel.
Com ensat Measures The relays are located in cabinets in the Main Control Room where they are under control of the Shift Manager. This limits access to the cabinets thereby making the relays less susceptible to inadvertent damage or unobserved degradation.
There is no identified mechanism for significant degradation of the relay dropout time. As discussed below, response time testing of instrument strings using the model types of relays involved has confirmed the response time reliability of the relays in question. The Supply System is aware of Information Notice 92-05 pertaining to potential ABB KMH-2 relay coil insulation breakdown concerns. However, this notice was reviewed as part of the Supply System Operating Experience Review Program and it was determined that no relays containing the manufacturing defect had been purchased. Furthermore, searches of the Nuclear Plant Reliability Data System and of Supply System maintenance history have not identified any other generic concerns.
Based upon the above, compensatory measures are not required.
Safe Basi for the R ue t The Supply System has evaluated the relay design and its application at WNP-2 and has concluded that the testing performed, and the industry failure data on the actuation logic relays, is adequate to assure they will perform their intended safety function. Response Time Testing of these relays would not provide significant additional assurance that the relays would perform their intended safety function.
t REQUEST FOR AMENDMENTTO TECHNICALSPECIFICATION 3/4.3.2, ISOLATION t
ACTUA,TION INSTRUIVIFATATIONRESPONSE TIME TESTING UNDER EMERGENCY CIRCUMSTANCES The need to perform response time testing is discussed in the plant Technical Specification Bases, which state:
"Except for the MSIVs, the safety analysis does not address individual sensor response times or the response times of the logic systems to which the sensors are connected.... It follows that checking the valve speeds and the 13-second time for emergency power establishment will establish the response time for the isolation functions. However, to enhance overall system reliability and to monitor instrument channel response time trends, the isolation actuation instrumentation response time shall be measured and recorded as a part of the ISOLATION SYSTEM RESPONSE TIME."
Existing plant procedures in place that provide assurance that these relays will perform their required function include the following:
LOGIC SYSTEM FUNCTIONALTEST (LSFT)-
This test is performed each annual refueling outage. The LSFT provides testing of the entire instrumentation and relay logic string from the sensor through the actuated component. The LSFTs provide periodic assurance that each of the relays will deenergize and contacts properly close as required to perform their safety function through the actuated components.
PARTIAL RESPONSE TIME TESTING OF PARALLEL RELAYS-Existing response time testing procedures measure the system response time from the sensed parameter through two (out of a total of nine in two channels and out a total of ten in the other two channels) relays per channel at the appropriate level of the system logic per division. These two relays are in parallel with the untested relays in each channel and are the same model number (EUMH-2) from the same manufacturer (ASEA/COMBIFLEX)and are located in a similar manner in the same cabinets as the relays for that division which are not response time tested. The Supply System believes that the response time testing results (approximately 110 milliseconds dropout time) of the two relays, which are currently being tested, are representative of those which would be obtained from the testing of the untested relays. This provides assurance that the relays in each channel which are not response time tested will perform their required function within the Technical Specification limit.
If f-I
t REQUEST FOR AMENDMENTTO TECHNICALSPECIFICATION 3/4.3.2, ISOLATION ACTUATION INSTRUMIPJTATION RESPONSE TIME TESTING UNDER t
EMI<MGENCY CIRCUMSTANCES CHANNEL FUNCTIONALTEST (CFT)-
This test verifies the correct function of the logic channel to these relays. A quarterly CFT verifies correct function of a logic channel by actuating half trip annunciators. The CFT does not test individual relays.
The affected relays, which have no time-delay feature, are electro-mechanical plunger-type with no dash pot or other dampening of the armature. Degradation for this type of relay is typically evidenced by failure to function, rather than degraded response times. Previous Supply System qualification tests performed on relays of the same manufacturer and model type have found dropout times to be approximately 110 milliseconds. There was no significant (less than 13 milliseconds) change in response time after equivalent thermal aging to 10 years and 27,000 actuation cycles. Response time testing for the tested in-plant relays (discussed above) has shown dropout times of approximately 110 milliseconds, which is consistent with the qualification test data. In addition, a review of industry data, discussions with the manufacturer,.
and WNP-2's own experience confirms the failure to function as the expected failure mode for these relays.
Response time testing is performed for each of the affected relay logic strings containing the untested relays. Response time testing is performed on the sensing device and actuated device portion of the actual logic strings. The parallel relays are the only actuating components in the logic circuits which are not tested. Thus, the response time of each logic circuit with the untested relays should behave consistent with the measured response times of the tested logic circuits with similar relays.
Based on the above, the Supply System believes that granting the requested Technical Specification change will not represent a significant safety issue. This is based on the observed failure modes of these relays, the scope of testing currently performed, the results of that testing, and the limited added assurance provided by response time testing in evaluating the ability of these relays to perform their safety functions.
Justificati n for the Period of A licabilit The relays and associated circuitry are located within two enclosures in the main control room.
These cabinets contain a number of circuits providing isolation, emergency system actuation and electrical load shedding of non-safety related plant equipment. The circuitry is "deenergized-to-actuate". The implementation of these tests at power would require entering cabinets that are very restrictive and difficult to work within. This activity would require many repeated connections within these enclosures. The possibility of inadvertently shorting or grounding of leads and the possibility of mechanically agitating the relays exists. As a result, this could result in actuation or disabling of one or more key emergency systems and loss of norinally
I t
+1
REQUEST FOR AMENDMENTTO TECHNICALSPECIFICATION 3/4.3.2, ISOLATION ACTUATIONINSTRUMENTATIONRESPONSE TIME TESTING UNDER EMXRGENCY CIRCUMSTANCES operating plant equipment leading to plant shutdown, further challenging plant systems and equipment.
No Si nificant Hazards Consideration The Supply System has evaluated this request for an emergency Technical Specification change to defer consideration of response time testing for Groups 3 and 4 as part of system OPERABILITY until the first Cold Shutdown condition no later than startup from the Spring 1994 Refueling Outage. The Supply System has determined that the granting of this request will not represent a significant hazards consideration because it will not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated. The relays are accident mitigating features and are not considered in the initiating sequences for any accidents previously evaluated. The LSFTs performed to date have demonstrated functionality of the relays, there is no observed failure mode that has caused deterioration of the dropout time of these relays, and the dropout time of the relays should be the same as the response time tested relays. Thus, the relays and logic strings will perform as designed. Therefore, approval of the requested change will not result in a significant increase in the probability or consequences of an accident.
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated. No new modes of operation of any equipment, system configuration or initial conditions result from the lack of response time testing of the relays. Granting of the requested change willnot affect initial conditions or introduce new system configurations, and, thus, will not create the possibility of a new or different kind of accident.
- 3) Involve a significant reduction in a margin of safety. As discussed above, the LSFTs performed to date have demonstrated functionality of the relays, there is no observed failure'mode that has caused deterioration of the dropout time of these relays, and the dropout time of the relays should be the same as the response time tested relays. With no identified mechanism for increase in the relay dropout time, the design basis for primary and secondary containment isolation is maintained and there is no significant.
increase in a radiological release from primary or secondary containment .
Because the logic strings are considered to be capable of performing their safety function within the response times listed in the Technical Specifications, granting of this request does not represent a significant hazards consideration.
t REQUE8T FOR AME~NDME<NTTO TECHNICALSPECIFICATION3/4.3.2, ISOLATION ACTUATION INSTRUMENTATIONRESPONSE TIME TESTING UNDER t
EMERGENCY CIRCUMSTANCES Environmental Consideration As discussed above, the Supply System concludes that this request does not involve a significant hazards consideration, nor is there a potential for a significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does the request involve a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(C)(9) and, therefore, per 10 CFR 51.22(b), an environmental assessment of this change is not required.
Summary The Supply System concludes that granting this request will involve minimum or no safety impact and represents a reduced risk to public health and safety over that associated with a potential plant shutdown.
This change has been approved by the WNP-2 Plant Operating Committee and the Supply System Corporate Nuclear Safety Review Board. In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
Sincerely
. V. Parrish (Mail Drop 1023)
Assistant Managing Director, Operations AGH/ah cc: Document Control Desk DL Williams - BPA/399 NS Reynolds - Winston & Strawn NRC Site Inspector - 901A JW Clifford - NRC
STATE. OF WASHINGTON )
Subject:
Request for Amend to TS 3/4.3,2
) s lationActu i nTnstrumentation COUNTY OF BENTON )
I, J. V. PARRISH, being duly sworn, subscribe to and say that I am the Assistant Managing Director, Operations for the WASHINGTON'PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have the full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.'ATE o2 , 1993
. Parrish, Assistant Managing Director Operations On this date personally appeared before me J. V. PARRISH, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this 4 day of 1993.
~
~
e "'.,'.
1 ~
1 No lic in and.'f t STATE OF WASHINGTC>N" ~,
Residing at My Commission Expires 3o /VV'