Addl Pages to Inservice Insp Summmary Rept,Refueling Outage RF91A NIS-1NIS-2 Owners Rept.
ML17286B228
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/14/1991
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286B227 List:
References
NUDOCS 9201060214
Download: ML17286B228 (10)


Text

~ ~

trASHINGTON PUBLIC PoirER SUPPLY SYSTEM PLAN NO. 2~87 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section Xl 1.OWner: Washington Public Power Supply System (WPPSS) Date: 11/14/91 AddreSS: 3000 George Washington Way, Richland, Washington Sheet:1 of1

2. Plant: Washington Public Power Supply System (WPPSS) Nuclear Power Plant (WNP) Unit: wNP-2 AddreSS: Hanford Reservation, Benton County, Washington
3. (a) WOrk PerfOrmed by: Bechtei Construcfion, Incorporation, PO BoX 600, Richland, WA (b) Repair Organization P.O. No., Job No., etc.: c2oo69
4. IdentiTiCatiOn Of SyStem: On Gas (OG) System
5. (a) Applicable Construction Code ASME Section III code class 3, 1971 Edition with no Addenda, Code Case: None (b) Applicable Edition of ASME Section XI Utilized for Repairs or Replacements: 196o Edmon with winter 1980 Addenda, Code Case: N408
6. Identification of Components Repaired or Replaced and Replacement Components Name of Name of Manufacturer National Other Year Repaired, ASME Code Component Manufacturer Serial No. Board I.D. Built Replaced, or Stamped No, Replacement (Yes or No)

Code Class OG-HX-1A GE 223176 1974 Repair/ Yes, Code Class 3 Replacement

7. DeSCl'iptlOrl Of WOrk: Performed work on OG.HX-1A. The work was performed as follows
1) Machined new tube plugs for plugging the tubes
2) installed new tube plugs ln the tube sheet holes and made required welds
3) Performed PT examination on the final welds. PT examinafion results acceptable
4) Insta! Ied new bolting material for the head cover to channel cover joint
6) Performed pressure test on flanged joint to conflrm pressure boundary integrity. No evidence of leakage during pressure test 968-22684 (9/87) t 920i0602i4 911220 PDR ADOCK 05000397 9 PDR

r  :~

~' ~

~ ~

NASHlHGIOH PVBUC PONER SUPPLY SYSTEM PLAN NO. M%87 FORM N1S-2 (Back) 8 Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure x Other TeSt PreSSure: 66O Pslg Test Temperature: 92' Component Design Pressure: tooo Psig Temperature: 678 F

9. Remarks: None CERTIFICATE OF COMPLIANCE We certify that the statements made in this Owner's Report are correct and this repair/replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: Not appricable CertTliCate AuthariZatiOn NO.: Not applicant>le ExPIration Date: Not App6cable Prepared by A~ Signed by Plant Technical Manager Date Date / s P CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Washington and employed by Arkwright Mutual Insurance Company (Factory Mutual System) of Norwood, Massachusetts have Inspected the components described in this Owner's Report during the period ~ '7 to ~// /Wl/ and state to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions 5'5C CA/

pector's Signature National Board, State, and Endorsements Date / ~

968-22684 (9/87) <iv S'.'i ~

+e '

trASHINGTON FUBUC PolfER SUPPLY SYSTEM PLAN NO. 241688 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI B

1.Owner: Washington Public Power Supply System (WPPSS) Date:11/14/91 AddreSS: 300O George Washington Way, Richland, Washington Sheet:1 of1

2. Plant.'Washington Public Power Supply System (WPPSS) Nuclear Power Plant (WNP) Unit: wNP-2 Address: Hanford Reservation, Benton County, Washington
3. (a) Wark PerfOrmed by: Bechtel Construcflon, Incorporaflon, PO Box 600, Richland, WA (b) Repair Organization P.O. No., Job No., etc.: c20069
4. IdentiTication of System: Off Gas (OG) System
5. (a) AppliCable COnStruCtjcn COde ASME SeCtian III Code Class 3,1971 Editionwithno Addenda, Code Case: None (b) AppliCable EditiOn Of AS ME SeCtiOn XI UtiliZed fOr RepairS Or ReplaCementS: 1980 Edition with Winter 1980 Addenda, Code Case: F08
6. IdentlTication of Components Repaired or Replaced and Replacement Components Name of Name of Manufacturer National Other Year Repaired, ASME Code Component Manufacturer Serial No. Board I.D. Built Replaced, or Stamped No. Replacement (Yes or No)

Code Class OG-HX-1 B GE 223177 N/A 1974 Repair/ Yes, Code Class 3 Replacement

7. DeSCriptlcn Of WOrk: Performed work on OG-HX-1 B. The work was performed as follows
1) Machined new tube plugs for plugging the tubes
2) Installed new tube plugs In the tube sheet holes and made required welds
3) Performed PT examination on the fina welds. PT examination rosults acceptable
4) Installed new bolting material for the head cover to channel cover joint
6) Performed pressure test on flanged joint to confir pressure boundary integrity. No evidence of leakage during pressure test 968-22684 (9/87)

WASHlHGTOH PUBUC POWER QQ SUPPLY SYSTEM PlAN NO. wacs FORM NIS-2 (Back) 8 Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure x Other Test Pressure: sso Psig Test Temperature: 92 F Component Design Pressure: tooo Psig Temperature: s7s F

9. RemarkS: None CERTIRCATE OF COMPUANCE

,We certify that the statements made in this Owner's Report are correct and this repair/replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: Not appricable CertifiCate AuthOriZatian NO.: Not applicable EXpiratiOn Date; Not Applicable Prepared by Signed by Plant 'rechnical Manager Date Date //-I+- ~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Washington and employed by Arkwright Mutual Insurance Company (Factory Mutual System) of Norwood, Massachusetts have inspected the components'described in this Owner's Report during the period to ~~i~~0 and state to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions pector's Signature National Board, State, and Endorsements Date l 968-22684 (9/87)

4, ~

trASHlHGIOH PUBUC PolfER SUPPLY SYSTEM PLAN NO. 2~89 FORM NIS.2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.Owner: Washington Public Power Supply System (WPPSS) Date; 11/<</91

. AddreSS: 3000 George Washington Way, FUchtand, WA Sheet:1 of1

2. Plant: WPPSS Nuclear Power Plant (WNP) Unit: WNP-2 Addi'ess: Hanford, Benton County, WA
3. (a) WOrk PerfOrmed by: WPPSS, 3000 George Washington Way, Richland, WA (b) Repair Organization P.O. No., Job No., etc.: wPPss
4. IdentifiCatiOn Of SyStem; Reactor Water Qeanup (RWCU) System
5. (a) Applicable Construction Code ASME Section III code Qass 3, 1971 Edition with winter 1973 Addenda, Code Case: None (b) Applicable Edition of AS ME Section XI Utilized for Repairs or Replacements: 1980 Edition with winter 1980 Addenda, Code Case: F08 6, IdenNication of Components Repaired or Replaced and Replacement Components Name of Name of Manufacturer National Other Year Repaired, ASME Code Component Manufacturer Serial No. Board I.D. Built Replaced, or Stamped No, Replacement (Yes or No)

Code Class RWCU(1)A WPPSS RWCU(1) MP1 N/A 1983 Replacement Yes, Code Qass 3

7. Description of Work: Machined new oriflce plate for RWCU-FE~. The work was performed as follows
1) Machined the new orifice plate by using dimensions obtained from the existing orwce plate
2) Wekfed handle to the orifice plate
3) Installed new or Ice plate under Plan No 24690
4) Performed pressure test to confirm pressure boundary integrity. No evidence of leakage during the pressure test 968-22684 (9/87)

WASHINGTON PUBUC POWER QQ SUPPLY SYSTEM PLAN NO. 24689 FORM N1S-2 (Back) 8 Tests Conducted; Hydrostatic Pneumatic Nominal Operating Pressure < Other Test Pressure: 9so Pstg Test Temperature: 426 'F Compoflent Design Pressul'e:1420Psig Temperature:878 F

9. Remarks: None CERTIFICATE OF COMPLIANCE We certify that the statements made in this Owner's Report are correct and this replacement conforms to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp: Not applicable CertiTiCate AuthcriZatIOn NO.: Not appricabie EXPiratiOn Date: Not Applicable O I Prepared by Signed by Plant Technical Manager Date li Date // /

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Washington and employed by Arkwright Mutual Insurance Company Owner's Report during the period to ~~~

(Factory Mutual System) of Norwood, Massachusetts have inspected the components described in this r' and state to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed'or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any Mnd arising from or connected with this inspection.

Commissions 554 QJ l epector'e Signature National Board, State, and Endorsements Date // /I 0/

968-22684 (9/87)

trAstuHGTOH puBUC poirER SUPPLY SYSTEM PLAN NO. 24690 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1.0Wner: Washington Public Power Supply System (WPPSS) Date: >>/I 4/91 Addi'ess: 3000 George Washington Way, Richland, Washington Sheet:1 of1

2. Plant: Washington Public Power Supply System (WPPSS) Nuclear Power Plant (WNP) Unit: wNP-2 Addi'eSS. 'Hanford Reservaflon, Benton County, Washington
3. (a) WOrk PerfOmled by: Washington Public Power Supply System (WPPSS), 3000 George Washington Way, Richland, WA (b) Repair OrganiZatian P.O. NO., JOb NO., etC.: Washington Public Power Supply System (WPPSS)
4. IdentiTiCatjOn Of SyStem: Reactor Water Cleanup (RWCU) System
5. (a) AppliCable COnStruCtiOn COde ASME SeCtiOn III Code aass 3, 1971 Ed'roon with Winter 1973 Addenda, Code Case: Nona (b) Applicable Edition of ASME Section XI Utilized for Repairs or Replacements:198o Eamon with winter 1980 Addenda, Coda Casa: F08
6. IdentiTicatjon of Components Repaired or Replaced and Replacement Components Name of Name of Manufacturer National Other Year Repaired, ASME Code Component Manufacturer Serial No. Soard I.D. Suilt Replaced, or Stamped No. Replacement (Yes or No)

Code Class RWCU(1) A WPPSS RWCU(1) MP2 Repair/ Yas, Code Class 3 Rephcem ant

7. DeSCriptjOn Of WOrk: Cut and reinstalied ormco flanges for RWCU-PEm. mo work was performed as follows
1) Cut existing orifice flanges
2) Beveled cut oriflce flange and pipe ends
3) Cut new pipe piece to tha required length. Beveled pipe cut ends
4) Installed exisflng oriflco flanges and new pipo
5) Made required circumferenflal butt welds
6) Performed MT examinaflon on the final circumferential butt welds. MT examination results acceptable
7) Reinstallad 3/4'ipe and made required socket welds
8) installed new orwce plato fabricated under Phn No 2 %89
9) Installed new bolting materkil for tho flangad joint
10) Performed hydrostatic test on circumferenflal butt weids to confum pressure boundary integrity. No evkfence of leakage during hydrostatic test 968-22684 (9/87)

~- 4 r ft

~ ~

t~

XASHlNGTON FUBUC PONER SUPPLY SYSTEM PLAN NO. A%90 FORM NIS-2 (Back) 8 Tests Conducted: Hydrostatic x Pneumatic Nominal Operating Pressure Other Test Pressure:18oo Pslg Test Temperature: 78' Component Design Pressure:1420 Psig Temperature: 878 F

9. Remarks: None CERTIFICATE OF COMPLIANCE We certify that the statements made in this Owner's Report are correct and this repair/rephcement conforms to the rules of the ASME Code,Section XI, Type Code Symbol Stamp: Not appr~le CertiTiCate AuthOriZatiOn NO.: Not appiicable EXpiratian Date: Not Applicable

' ~ ~ Signed by Prepared by Plant Technical Manager Date Date ie-I g g/

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Washington and employed by Arkwright Mutual Insurance Company (Factory Mutual System) of Norwood, Massachusetts have inspected the components described in this Owner's Report during the period ~M to ~/I /~~ and state to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

, By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from orconnected with this inspection.

r's Signature Commissions 'PS A!~

l National Soard, State, and Endorsements Date 968-22684 (9/87I

XASHIHGTOH PUBUC POXER SUPPLY SYSTEM PLAN NO. 24694 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI h

1.OWner: Washington Public Power Supply System (WPPSS) Date: 9/24/91 AddreSS: 3000 George Washington Way, RIchland, Washington Sheet:1 of 1

2. Plant: Washington Public Power Supply System (WPPSS),Nuclear Power Phnt(WNP) Unit: WNP 2 Addi'ess: Hanford Reservation, Benton County, Washington
3. (a) WOrk Perfarmed by: Washington Public Power Supply System (WPPSS),3000 George Washington Way, RIchland, WA (b) Repair OrganiZatiOn P.O. NO., JOb NO., etC.: Washington Public Power Supply System (WPPSS)

,4. Identification of System: Instrument Une

5. (a) AppliCable COnStruCtian COde ASME SeCtlcn III Code Class 2,1974 Edition with Winter1975 Addenda, Code Case: None (b) Applicable Edition of ASME Section XI Utilized for Repairs or Replacements:1980 Edition with winter 1980
~ Addenda, Code Case
N~
6. IdentiTication of Components Repaired or Replaced and Replacement Components Name of Name of Manufacturer National Other Year Repaired, ASME Code Component Manufacturer Serial No. Soard I.D. EIuilt Replaced, or Stamped No. Replacement (Yes or No)

Code Class Pl(1) ~-X82C JCI Pl(1) M-X82C 1983 Rephcament Yas, Code Class 2

7. DeSCriptiOn Of WOrk: Replaced valve Pl-V-X265. The rephcement work was performed as follows
1) Cut socket wekls and removed existing valve
2) Installed new valve
3) Made required socket walds
4) Performed PTaxamination on the anal socket welds. PT examination results acceptable h

968-22684 (9/87)

XASHIHGTOH PUBLIC POWER SUPPLY SYSTEM PlAN NO. 2~94 FORM NIS-2 (Back) 8 Tests Conducted: Hydrostatic Pneumatic Nominal Operating Pressure Other X N<<e Test Pressure: Psig Test Temperature: F COmpOnent DeSign PreSSure: Pslg Temperature: 'P

9. Remarks: See attached NPV-1 Code Oata Report for the new vahre Serial No 15 CERTIFICATE OF COMPLIANCE We certify that the statements made in this Owner's Report are correct and this replacement conforms to the rules oftheASME Code,Section XI. ,-' . *;

Type Code Symbol Stamp: Not approvable CertiTiCate AuthOriZatiOn NO.: Not applicable EXpiratiOn Date: Not Applicable a

Prepared by Signed by Plant Technical Manager Date Date

'o ~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Washington and employed by Arkwright Mutual Insurance Company (Factory Mutual System) of Norwood, Massachusetts have inspected the components described in this Owner's Report during the period and state to the best of rny knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions pector's SignatUre National Board, State, and Endorsements Date 968-22684 (9/87)