MILLSTONE POWER STATION UNIT 2 FINAL SAFETY ANALYSIS REPORT
1 of 2 Revision Summary of Change Revision 34 (2016 - 2017 Reporting Period)
Revision Revision Release Date Change Activity Document Elements Affected (Sections, Tables, Figures)
Summary Description of Changes 34 4/5/16 Administrative As identified in the 2016 NRC Submittal List of Changed Pages and submitted Summary of Change.
Administrative (FSAR content not affected). Change indicator(s) and page change identification(s) present in the 2016 NRC Submittal were removed in preparation for the 2017 Annual Report. This forms the base line for changes incorporated under the Revision 34 series. Revision level of the authoring files are unchanged. This supports Revision/Change traceability.
34.1 9/29/16 Administrative Various Reflects administrative (FSAR content not affected) markup to identify sensitive non-safeguards unclassified information where applicable.
34.1 9/29/16 MP2-UCR-2016-004 Table 11.2-1 Correct typo identified by CR1017686.
34.1 9/29/16 MP2-UCR-2016-006 Section 14.8.2.2.4 Millstone 2 NRC License Amendment 326, Millstone Power Station Unit 2 - Issuance of Amendment to Revise Technical Specifications for Containment Leak Rate Testing (CAC No. MF5838), March 31, 2016 (ADAMS Accession Number ML16068A312).
34.1 9/29/16 MP2-UCR-2016-007 Chapter 1 section 1.A; Chapter 8 List of Figures; Chapter 8 section 8.1.1.4, 8.1.2.1; 8.1.2.2; 8.1.2.3 and Figure 8.1-1A; 8.1-1B Unit 2 SLOD Removal (LBDCR 15-MP2-006) 34.2 12/22/16 MP2-UCR-2013-017 Table 6.7-1, Table 9.9-11 Reflects correction of technical value in the respective tables.
34.2 12/22/16 MP2-UCR-2015-007 1.2.10.4, 1.A, 9.8.2.1.1, 9.8.2.1.2, 9.8.2.2.2, Figure 9.8-7, Figure 9.8-8A, Figure 9.8-8B, Figure 9.8-8C, 14.7.4.1 Reflects changes associated with LBDCR 12-MP2-008.
34.2 12/22/16 MP2-UCR-2016-003 9.3.2.3 Update Subsection 9.3.2.3 to reflect changes made by DCN DM2-00-0166-07 that eliminated the packing leak-off lines on M22-SI-306.
2 of 2 34.2 12/22/16 MP2-UCR-2016-009 11.E.1 RM-8123 and RM-8262 are described incorrectly in the FSAR. This change removes the reference to a gamma geiger muller detector chamber type and replace it with the correct beta scintillator type detector.
34.2 12/22/16 MP2-UCR-2016-010 15.2.1.2 Cancellation of Millstone 2 Boraflex Monitoring Program.
34.2 12/22/16 MP2-UCR-2016-012 15.2.1.21 MP3 HVK Chiller Service Water Thermal Performance Testing Elimination.
34.2 12/22/16 MP2-UCR-2016-016 14.6.5.2, 14.6.5.2.5, 14.6.5.2.5.1, 14.6.5.2.5.2, 14.6.5.2.5.3, 14.6.5.2.5.4, 14.6.5.2.5.5, 14.6.5.2.5.8, 14.6.5.2.5.9, 14.6.5.2.6, 14.6.5.2.7, 14.6.5.2.8, Figures 14.6.5.2-1, 14.6.5.2-2, 14.6.5.2-3, 14.6.5.2-4, 14.6.5.2-5, 14.6.5.2-6, 14.6.5.2-7, 14.6.5.2-8, 14.6.5.2-9, 14.6.5.2-10, 14.6.5.2-11, 14.6.5.2-12, 14.6.5.2-13, 14.6.5.2-14, 14.6.5.2-15, 14.6.5.2-16, 14.6.5.2-17, 14.6.5.2-18, 14.6.5.2-19, 14.6.5.2-20, 14.6.5.2-21, 14.6.5.2-22, Tables 14.6.5.2-3, 14.6.5.2-4, 14.6.5.2-5, 14.6.5.2-6, 14.6.5.2-7 This SAR change request updates the Small Break Loss of Coolant Accident (SBLOCA) analysis presented in FSAR Section 14.6.5.2.
34.3 03/30/17 MP2-UCR-2016-008 9.5.1.1, 9.5.2.1, 9.5.3.1 The NRC requested additional information be provided in the FSAR to describe the procedural controls in place to maintain the Millstone 2 Spent Fuel Pool temperature below 150°F. LAR 15-571 35 06/29/17 MP2-UCR-2015-025 14.0.11, 14.6.1.1, 14.6.1.6 Confirmatory Order EA-13-188, AREVA analysis ANP-3406, Rev. 0 -
Remove credit for charging from the long-term portion of the inadvertent opening of the PORV (IOPORV) event.
35 06/29/17 MP2-UCR-2017-004 10.3.4.2, Table 10.3-1 LA3022214 - Modify FSAR Section 10.3.4.2 Tests and Inspection to read See Section 5.2.7.4.1 in lieu of 5.2.8.4.2.
Revision 34 (2016 - 2017 Reporting Period)
Revision Revision Release Date Change Activity Document Elements Affected (Sections, Tables, Figures)
Summary Description of Changes
MPS2 UFSAR LOA 1 of 3 LIST OF ABBREVIATIONS Abbreviation ADH Aerated Drain Header AEAS Auxiliary Exhaust Actuation Signal AES Auxiliary Exhaust System ATWS Anticipated Transient Without Scram BOL Beginning of Life BWR Boiling Water Reactor CEA Control Element Assembly CEDM Control Element Drive Mechanism CEDS Control Element Drive System CFR Code of Federal Regulations CIAS Containment Isolation Actuation Signal CRFS Control Room Filtration System CSAS Containment Spray Actuation Signal CSS Containment Spray System CVCS Chemical and Volume Control System CVH Containment Vent Header DBA Design Basis Accident DBE Design Basis Earthquake DNB Departure from Nucleate Boiling DNBR Departure from Nucleate Boiling Ratio DRL Division of Reactor Licensing EB Enclosure Building EBFR Enclosure Building Filtration Region EBFS Enclosure Building Filtration System
MPS2 UFSAR (CONTINUED)
Abbreviation LOA 2 of 3 ECCS Emergency Core Cooling System EOL End of Life ESCS Engineered Safety Features Control System F
Degrees Fahrenheit FPS Fire Protection System FT Fuel Transfer FW Feed Water HMP High Mechanical Performance HPSI High Pressure Safety Injection HTP High Thermal Performance IA Instrument Air ID Inside Diameter LOCA Loss of Coolant Accident LPSI Low Pressure Safety Injection MPC Maximum Permissible Concentration MSL Mean Sea Level MSS Main Steam System MTU Metric Tons Uranium MWD Megawatt Days NDT Non-Destructive Testing NDTT Nil Ductility Transition Temperature NS Nitrogen Supply NSSS Nuclear Steam Supply System OBE Operating Basis Earthquake
MPS2 UFSAR (CONTINUED)
Abbreviation LOA 3 of 3 OD Outside Diameter PA Purge Air PDH Primary Drain Header PDT Primary Drain Tank PPM Parts Per Million PVMP Preoperational Vibration Monitoring Program PWR Pressurized Water Reactor RBCCW Reactor Building Closed Cooling Water RBCCWS Reactor Building Closed Cooling Water System RCS Reactor Coolant System RWS Radioactive Waste System RWST Refueling Water Storage Tank SA Station Air SGBS Steam Generator Blowdown System SIAS Safety Injection Actuation Signal SIS Safety Injection System SRAS Sump Recirculation Actuation Signal SRST Spent Resin Storage Tank SS Sampling System TBCCWS Turbine Building Closed Cooling Water System WGH Waste Gas Header WREC Westinghouse Rector Evaluation Center WTR Westinghouse Test Reactor
MPS2 UFSAR LOES 1 of 8 LIST OF EFFECTIVE SECTIONS Chapter 1-INTRODUCTION AND
SUMMARY
Table of Contents List of Tables List of Figures
1.1 INTRODUCTION
1.2
SUMMARY
DESCRIPTION 1.3 COMPARISON WITH OTHER PLANTS 1.4 PRINCIPAL ARCHITECTURAL AND ENGINEERING CRITERIA FOR DESIGN 1.5 RESEARCH AND DEVELOPMENT REQUIREMENTS 1.6 IDENTIFICATION OF CONTRACTORS 1.7 GENERAL DESIGN CHANGES SINCE ISSUANCE OF PRELIMINARY SAFETY ANALYSIS REPORT 1.8 ADVISORY COMMITTEE ON REACTOR SAFEGUARDS SPECIAL INTEREST ITEMS [THIS SECTION PROVIDES HISTORICAL INFORMATION PROVIDED TO THE ACRS AT THE TIME OF INITIAL LICENSING AND WAS NOT INTENDED TO BE UPDATED.]
1.9 TOPICAL REPORTS 1.10 MATERIAL INCORPORATED BY REFERENCE 1.A AEC GENERAL DESIGN CRITERIA FOR NUCLEAR POWER PLANTS Chapter 2 - SITE AND ENVIRONMENT Table of Contents List of Tables List of Figures 2.1 GENERAL DESCRIPTION 2.2 POPULATION, LAND USE AND WATER USE 2.3 METEOROLOGY 2.4 GEOLOGY 2.5 HYDROLOGY 2.5 HYDROLOGY
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 2 of 8 2.6 SEISMOLOGY 2.7 SUBSURFACE AND FOUNDATIONS 2.8 ENVIRONMENTAL MONITORING PROGRAM 2.9 ENVIRONMENTAL RADIATION MONITORING PROGRAM Chapter 3-REACTOR Table of Contents List of Tables List of Figures 3.1
SUMMARY
DESCRIPTION 3.2 DESIGN BASES 3.3 MECHANICAL DESIGN 3.4 NUCLEAR DESIGN AND EVALUATION 3.5 THERMAL-HYDRAULIC DESIGN 3.A ANALYSIS OF REACTOR VESSEL INTERNALS Chapter 4-REACTOR COOLANT SYSTEM Table of Contents List of Tables List of Figures 4.1 GENERAL SYSTEM DESCRIPTION 4.2 DESIGN BASIS 4.3 SYSTEM COMPONENT DESIGN 4.4 MATERIALS COMPATIBILITY 4.5 SYSTEM DESIGN EVALUATION 4.6 TESTS AND INSPECTIONS 4.A SEISMIC ANALYSIS OF REACTOR COOLANT SYSTEM
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 3 of 8 Chapter 5-STRUCTURES Table of Contents List of Tables List of Figures 5.1 GENERAL 5.2 CONTAINMENT GENERAL DESCRIPTION 5.3 ENCLOSURE BUILDING 5.4 AUXILIARY BUILDING 5.5 TURBINE BUILDING 5.6 INTAKE STRUCTURE 5.7 EXTERNAL CLASS I TANKS 5.8 SEISMIC DESIGN 5.9 CONSTRUCTION PRACTICE AND QUALITY ASSURANCE 5.A DESCRIPTION OF FINITE ELEMENT METHOD USED IN CONTAINMENT ANALYSIS 5.B JUSTIFICATION FOR LOAD FACTORS AND LOAD COMBINATIONS USED IN DESIGN EQUATIONS OF CONTAINMENT 5.C JUSTIFICATION FOR CAPACITY REDUCTION FACTORS () USED IN DETERMINING CAPACITY OF CONTAINMENT 5.D EXPANDED SPECTRUM OF TORNADO MISSILES 5.E COMPUTER PROGRAM LIST AND DESCRIPTIONS 5.E.1 COMPUTER PROGRAM APPLICABILITY AND VALIDATION 5.E.2 COMPUTER PROGRAM TEST PROBLEM SOLUTIONS 5.E.3 COMPUTER PROGRAM TEST PROBLEM SIMILARITIES 5.F CONTAINMENT WATER INTRUSION INTO TENDON GALLERY DURING CONSTRUCTION (1)
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 4 of 8 Chapter 6-ENGINEERED SAFETY FEATURES SYSTEMS Table of Contents List of Tables List of Figures 6.1 GENERAL 6.2 REFUELING WATER STORAGE TANK AND CONTAINMENT SUMP 6.3 SAFETY INJECTION SYSTEM 6.4 CONTAINMENT SPRAY SYSTEM 6.5 CONTAINMENT AIR RECIRCULATION AND COOLING SYSTEM 6.6 CONTAINMENT POST-ACCIDENT HYDROGEN CONTROL SYSTEM 6.7 ENCLOSURE BUILDING FILTRATION SYSTEM Chapter 7-INSTRUMENTATION AND CONTROL Table of Contents List of Tables List of Figures
7.1 INTRODUCTION
7.2 REACTOR PROTECTIVE SYSTEM 7.3 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM 7.4 REGULATING SYSTEMS 7.5 INSTRUMENTATION SYSTEM 7.6 OPERATING CONTROL STATIONS 7.7 CONTROL ROOM ANNUNCIATION 7.8 COMMUNICATION SYSTEMS 7.9 ANTICIPATED TRANSIENTS WITHOUT SCRAM CIRCUITRY 7.10 AUXILIARY STEAM LINE BREAK DETECTION/ISOLATION SYSTEM 7.11 ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT IMPORTANT TO SAFETY
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 5 of 8 Chapter 8-ELECTRICAL SYSTEMS Table of Contents List of Tables List of Figures 8.0 ELECTRICAL DRAWINGS SUBMITTED TO AEC FOR REVIEW 8.1 ELECTRIC POWER 8.2 4160-VOLT AND 6900-VOLT SYSTEMS 8.3 EMERGENCY GENERATORS 8.4 480 VOLT SYSTEM 8.5 BATTERY SYSTEM 8.6 ALTERNATING CURRENT INSTRUMENTATION AND CONTROL 8.7 WIRE, CABLE AND RACEWAY FACILITIES Chapter 9-AUXILIARY SYSTEMS Table of Contents List of Tables List of Figures 9.1 GENERAL 9.2 CHEMICAL AND VOLUME CONTROL SYSTEM 9.3 SHUTDOWN COOLING SYSTEM 9.4 REACTOR BUILDING CLOSED COOLING WATER SYSTEM 9.5 SPENT FUEL POOL COOLING SYSTEM 9.6 SAMPLING SYSTEM 9.7 COOLING WATER SYSTEMS 9.8 FUEL AND REACTOR COMPONENT HANDLING EQUIPMENT 9.9 PLANT VENTILATION SYSTEMS 9.10 FIRE PROTECTION SYSTEM 9.11 COMPRESSED AIR SYSTEM 9.12 WATER TREATMENT SYSTEM
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 6 of 8 9.13 AUXILIARY STEAM SYSTEM Chapter 10- STEAM AND POWER CONVERSION SYSTEM Table of Contents List of Tables List of Figures 10.1
SUMMARY
DESCRIPTION 10.2 TURBINE GENERATOR 10.3 MAIN STEAM SUPPLY SYSTEM 10.4 OTHER FEATURES OF STEAM AND POWER CONVERSION SYSTEM Chapter 11-RADIOACTIVE WASTE PROCESSING AND RADIATION PROTECTION SYSTEMS Table of Contents List of Tables List of Figures 11.1 RADIOACTIVE WASTE PROCESSING SYSTEMS 11.2 RADIATION PROTECTION 11.A SOURCE TERMS FOR RADIOACTIVE WASTE PROCESSING AND RELEASES TO THE ENVIRONMENT 11.B RADIOACTIVE WASTE PROCESSING OF RELEASES TO ENVIRONMENT 11.C DOSES FROM RADIOACTIVE RELEASES AND COST-BENEFIT ANALYSIS 11.D EXPECTED ANNUAL INHALATION DOSES AND ESTIMATED AIR CONCENTRATIONS OF RADIOACTIVE ISOTOPES FOR MP2 FACILITIES 11.E AIRBORNE ACTIVITY SAMPLING SYSTEM FOR CONTAINMENT, SPENT FUEL AND RADWASTE ATMOSPHERES Chapter 12-CONDUCT OF OPERATIONS Table of Contents 12.1 ORGANIZATIONAL STRUCTURE 12.2 TRAINING PROGRAM 12.3 EMERGENCY PLANNING
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 7 of 8 12.4 REVIEW AND AUDIT 12.5 PLANT PROCEDURES 12.6 RECORDS 12.7 PHYSICAL SECURITY PLANS 12.8 QUALITY ASSURANCE PROGRAM 12.9 DELETED BY PKG FSC MP2-UCR-2011-014 Chapter 13-INITIAL TESTS AND OPERATION Table of Contents List of Tables List of Figures
13.1 DESCRIPTION
OF THE STARTUP TEST PROGRAM 13.2 STARTUP TEST PROGRAM ORGANIZATION AND RESPONSIBILITIES 13.3 ADMINISTRATIVE CONDUCT OF THE STARTUP TEST PROGRAM 13.4 MILLSTONE STARTUP GROUP TRAINING PROGRAM 13.5 INITIAL INSPECTION AND COMPONENT TESTING PHASE 13.6 PREOPERATIONAL AND ACCEPTANCE TEST PROGRAM 13.7 HOT FUNCTIONAL TEST PROGRAM 13.8 INITIAL FUEL LOADING 13.9 INITIAL CRITICALITY 13.10 LOW POWER PHYSICS TESTING 13.11 POWER ASCENSION TESTING 13.12 PIPING OPERATIONAL TESTING 13.13 ACTIVE VALVES OPERATIONAL TESTING 13.A PREOPERATIONAL TEST DESCRIPTIONS
MPS2 UFSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 8 of 8 Chapter 14-SAFETY ANALYSIS Table of Contents List of Tables List of Figures 14.0 GENERAL 14.1 INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 14.2 DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 14.3 DECREASE IN REACTOR COOLANT SYSTEM FLOW 14.4 REACTIVITY AND POWER DISTRIBUTION ANOMALIES 14.5 INCREASES IN REACTOR COOLANT SYSTEM INVENTORY 14.6 DECREASES IN REACTOR COOLANT INVENTORY 14.7 RADIOACTIVE RELEASES FROM A SUBSYSTEM OR COMPONENT 14.8 MILLSTONE UNIT 2 FSAR EVENTS NOT CONTAINED IN THE STANDARD REVIEW PLAN Chapter 15 LICENSE RENEWAL Table of Contents List of Tables
15.0 INTRODUCTION
15.1 OVERVIEW OF AGING MANAGEMENT PROGRAMS 15.2 PROGRAMS THAT MANAGE THE EFFECTS OF AGING ON STRUCTURES AND COMPONENTS WITHIN THE SCOPE OF LICENSE RENEWAL 15.3 TIME-LIMITED AGING ANALYSIS 15.4 TLAA SUPPORT PROGRAMS 15.5 EXEMPTIONS 15.6 LICENSE RENEWAL COMMITMENTS
MPS2 UFSAR LOET 1 of 15 LIST OF EFFECTIVE TABLES Number Title Table 1.1-1 Licensing History Table 1.2-1 Summary of Codes and Standards for Components of Water-Cooled Nuclear Power Units (1)
Table 1.3-1 Comparison with Other Plants Table 1.4-1 Seismic Class I Systems and Components Table 1.8-1 Comparison of Preoperational Vibration Monitoring Program Design Parameters Table 1.9-1 Topical Reports Table 2.3-1 Distances from Release Point to Receptors Table 2.3-2 (DELETED)
Table 2.5-1 Effect of Hurricane Generated Surge and Waves on Unit Number 2 Structures Table 2.5-2 Design Wave Conditions Table 2.5-3 Roof Surface Area and Number and Size of Roof Drains Table 2.5-4 All Catch Basins for Elevation Area Draining Into and Runoff Flowing In and Out of a Catch Basin Table 3.2-1 Stress Limits for Reactor Vessel Internal Structures Table 3.3-1 Mechanical Design Parameters
- Table 3.3-2 Pressurized Water Reactor Primary Coolant Water Chemistry Recommended Specifications Table 3.4-1 Fuel Characteristics for a Representative Reload Core Table 3.4-2 Neutronics Characteristics for a Representative Reload Core Table 3.4-3 Representative Shutdown Margin Requirements Table 3.5-1 Nominal Reactor and Fuel Design Parameters Table 3.5-2 Design Operating Hydraulic Loads on Vessel Internals Table 3.5-3 Uncertainty Sources for DNBR Calculations (DELETED)
Table 3.A-1 Natural Frequencies for Vertical Seismic Analysis Mathematical Model Table 3.A-2 Seismic Stresses in Critical Reactor Internals Components for the Design Basis Earthquake Table 4.1-1 Reactor Coolant System Volumes Table 4.2-1 Principal Design Parameters of Reactor Coolant System Table 4.2-2A Table of Loading Combinations and Primary Stress Limits
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 2 of 15 Table 4.2-2B Table of Loading Combinations and Primary Stress Limits for the Replacement Reactor Vessel Head and Replacement pressurizer Table 4.2-3 Reactor Coolant System Code Requirements Table 4.2-4 Comparison with Safety Guide 26 Table 4.3-1 Reactor Vessel Parameters Table 4.3-2 Steam Generator Parameters Table 4.3-3 Main Steam Safety Valve Parameters Table 4.3-4 Tech Pub Review PKG for T4.3-4Reactor Coolant Pump Parameters Table 4.3-5 Reactor Coolant Piping Parameters Table 4.3-6 Pressurizer Parameters Table 4.3-7 Quench Tank Parameter Table 4.3-8 Pressurizer Spray (RC-100E, RC-100F) Valve Parameters Table 4.3-9 Power-Operated Relief Valve Isolation Valve Parameters (RC-403, RC-405)
Table 4.3-10 Pressurizer Power-Operated Relief Valve Parameters (RC-402, RC-404)
Table 4.3-11 Pressurizer Safety Valve Parameters (RC-200, RC-201)
Table 4.3-12 Active and Inactive Valves in the Reactor Coolant System Boundary Table 4.4-1 Materials Exposed to Coolant Table 4.4-2 Reactor Coolant Chemistry Table 4.5-1 Reactor Coolant System Component Nozzles, Nozzle Sizes and Nozzle Materials Table 4.5-2 Reactor Coolant System Heatup and Cooldown Limits Table 4.6-1 RTNDT Determination for Reactor Vessel Base Metal Millstone Unit Number 2 Table 4.6-2 Charpy V-notch and Drop Weight Test Values - Pressurizer Millstone Unit Number 2 Table 4.6-3 Charpy V-notch and Drop Weight Test Values - Steam Generator Table 4.6-4 Charpy V-notch Values - Piping Table 4.6-5 Plate and Weld Metal Chemical Analysis Table 4.6-6 Beltline Mechanical Test Properties - Reactor Vessel Surveillance Materials Table 4.6-7 Tensile Test Properties - Reactor Vessel Surveillance Materials Table 4.6-8 Summary of Specimens Provided for Each Exposure Location
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 3 of 15 Table 4.6-9 Capsule Removal Schedule Table 4.6-10 Inspection of Reactor Coolant System Components During Fabrication and Construction Table 4.6-11 Reactor Coolant System Inspection C-E Requirements Table 4.6-12 RTPTS Values at 54 EFPY Table 4.6-13 Adjusted Reference Temperatures (ART) Projections Table 4.A-1 Natural Frequencies and Dominant Degrees of Freedom Table 4.A-2 Seismic Loads on Reactor Coolant System Components for Operational Basis Earthquake Table 5.2-1 Containment Structure Analysis Summary Table 5.2-2 Containment Structure Analysis Summary - Dead Load, Initial Prestress and Live Load (D+KF+L)
Table 5.2-3 Containment Structure Analysis Summary - Dead Load, Initial Prestress and Live Load (D+F+L+1.15P)
Table 5.2-4 Containment Structure Analysis Summary - Dead Load, Initial Prestress and Live Load, Operating Temperature and OBE (D+F+L+T0+E)
Table 5.2-5 Containment Structure Analysis Summary - Dead Load, Prestress, Live Load, 100% Accident Pressure and Accident Temperature (D+F+L+1.0P+T1)
Table 5.2-6 Containment Structure Analysis Summary - Dead Load, Prestress, Operating Temperature, Thermal Expansion Forces of Pipes, Pipe Rupture Forces and DBE (D+F+T0+H+R+E1)
Table 5.2-6A Deleted by FSARCR 04-MP2-016 Table 5.2-7 Containment Structure Analysis Summary - Dead Load, Prestress, 100%
Accident Pressure, Thermal Expansion Forces of Pipes, Pipe Rupture Forces and DBE (D+F+1.0P+H+T1+E1)
Table 5.2-8 Containment Structure Analysis Summary - Dead Load, Prestress, 125%
Accident Pressure, 125% Thermal Expansion Forces of Pipes, Accident Temperature and 125% DBE (D+F+1.25P+1.25H+T1+1.25E)
Table 5.2-9 Containment Structure Analysis Summary - Dead Load, Prestress, 150%
Accident Pressure, and Accident Temperature (D+F+1.5P+T1)
Table 5.2-10 Spectrum of Potential Missiles From Inside the Containment Table 5.2-11 Containment Structure Isolation Valve Information Table 5.2-12 Containment Penetration Piping
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 4 of 15 Table 5.2-13 Major(1) Containment Isolation Valves Table 5.2-14 Typical Leak Rate Measurement System Instrumentation Table 5.2-15 Typical Containment Resistance Temperature Detectors and Dewcell Sensor Volume Weight Fractions Table 5.5-1 Maximum Actual Stresses - Turbine Building Table 5.8-1 Material Damping Values Table 5.9-1 Aggregate Tests Table 5.9-2 Cement Tests Table 5.9-3 Fly Ash Tests Table 5.9-4 Typical Chemical Analysis of Fly Ash Used Table 5.9-5 Allowable Void Limits for Cadwelding Table 5.D-1 Impactive Velocities (fps) of Missiles of Different CdA/W Factors as Picked from the Ground by the Design Tornado Table 5.D-2 Kinetic Energy per Ft2 of Impact Area Table 5.D-3 Radius vs. Velocity FPS/MPH (D=0.882 psi/V1 = 27 mph)
Table 5.D-4 Radius vs. Velocity FPS/MPH (D=3 psi/V1 = 60 mph)
Table 5.D-5 Velocities of Various Missiles Table 5.D-6 Test Data Summary Table 5.D.A-1A Relative Conservatism in Steps A, B, and C Table 5.D.A-2A Table 5.D.A-3A Table 6.1-1 Pipe Rupture Protection Requirements Table 6.1-2 Omitted Table 6.1-3 Design Non-Seismic Category I Components Located Inside Containment and Enclosure Building Table 6.1-4 Pipe Rupture Criteria Applicability (Outside Containment) Based on Normal Operating Plant Conditions Table 6.2-1 Refueling Water Storage Tank and Containment Sump Table 6.3-1 Omitted Table 6.3-2 Principal Design Parameters of the Safety Injection System
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 5 of 15 Table 6.3-3 Shutdown Cooling Heat Exchanger Data Table 6.3-4 Omitted Table 6.3-5 Internal Dimensions of Containment Sump Recirculation Piping and Valves Table 6.3-6 Safety Injection System Failure Mode Analysis High Pressure Safety Injection Table 6.3-7 Administrative Error Analysis-Safety Injection System Valves Table 6.3-8 Failure Modes and Effects Analysis for Boron Precipitation Control Table 6.4-1 Containment Spray System Component Design Parameters Table 6.4-2 Containment Spray System Failure Mode Analysis Table 6.5-1 Containment Air Recirculation and Cooling Units Materials of Construction Table 6.5-2 Containment Air Recirculation and Cooling Units Performance Datadn Table 6.5-3 Containment Air Recirculation and Cooling System Table 6.6-1 Containment Post Accident Hydrogen Control Systems Component Description Table 6.6-2 Deleted by FSARCR 04-MP2-018 Table 6.6-3 Omitted Table 6.6-4 Post-Incident Recirculation System Failure Mode Analysis Table 6.7-1 Enclosure Building Filtration System Component Description Table 6.7-2 Enclosure Building Filtration System Failure Mode Analysis Table 7.2-1 Reactor Trip and Pretrip Set Points Table 7.2.1.1-I Parameters Affecting Fuel Design Limit Table 7.2.1.1-II Pertinent NSSS parameters and Monitored Variables Table 7.2.1.1-III Trip Functions Table 7.2.1.1-IV Trip Variable Monitored Table 7.3.2.2-1 ESAS Failure Mode Analysis for Containment Pressure Channels Table 7.4-1 Prohibits on CEAs Table 7.5-1 Major Process Instrumentation Table 7.5-2 Omitted Table 7.5-3 Regulatory Guide 1.97 (Rev. 2) Accident Monitoring Instrumentation Table 7.5-4 Area Radiation Monitors Table 7.5-5 Liquid Process/Effluent Radiation Monitors
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 6 of 15 Table 7.5-6 Airborne Process/Effluent Radiation Monitors Table 7.5-6A Process Radiation Monitors (Steam)
Table 7.5-7 CEA Position Light Matrix Table 7.6-1 Major Equipment Normally Used for Hot Shutdown Table 7.6-2 Major Equipment Normally Used for Cold Shutdown Table 8.3-1 Diesel Fuel Oil System Mode Analysis Table 8.3-2 A Emergency Diesel Generator Loading Table 8.3-3 B Emergency Diesel Generator Loading Table 8.5-1 Battery Service Profile for Batteries 201A and 201B Table 8.7-1 Cable Characteristics Table 8.7-2 Omitted Table 8.7-3 Omitted Table 8.7-4 Facility Identification Table 9.2-1 Chemical and Volume Control System Parameters Table 9.2-2 Reactor Coolant and Demineralized Water Chemistry Table 9.2-3 Regenerative Heat Exchanger Table 9.2-4 Letdown Control Valves Table 9.2-5 Letdown Heat Exchanger Table 9.2-6 Ion Exchangers Table 9.2-7 Letdown Filters Table 9.2-8 Volume Control Tank Table 9.2-9 Charging Pumps Table 9.2-10 Concentrated Boric Acid Preparation and Storage Table 9.2-11 Boric Acid Pumps and Strainers Table 9.3-12 Shutdown Cooling Heat Exchangers Design Basis Parameters Table 9.3-13 Shutdown Cooling System Design Parameters Table 9.4-1 Reactor Building Closed Cooling Water System Components Table 9.4-2 Reactor Building Closed Cooling Water System Failure Mode Analysis Table 9.4-3 Minimum Required RBCCW Flow to Essential Safety-Related Loads LOCA
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 7 of 15 Injection and Recirculation Operations Table 9.5-4 Spent Fuel Pool Monitoring Equipment Table 9.5-5 Components of Spent Fuel Pool Cooling System Table 9.7-1 Circulating Water System Components Table 9.7-2 Service Water System Components Table 9.7-3 Turbine Building Closed Cooling Water System Components Table 9.7-4 Service Water Cooling System Table 9.8-1 Transfer Tube Isolation Valve Table 9.8-2 Spent Fuel Pool Platform Crane Table 9.8-3 Spent Fuel Cask Crane Table 9.8-4 Failure Mode Analysis Table 9.8-5 Radiation Levels from Heated Junction Thermocouple (R/Hr)
Table 9.9-6 Control Element Drive Mechanism Cooling System Table 9.9-7 Containment and Enclosure Building Purge System Table 9.9-8 Containment Auxiliary Circulation System Table 9.9-9 Containment Penetration Cooling System Table 9.9-10 Penetration Air Cooling Requirements Table 9.9-11 Radwaste Ventilation System Table 9.9-12 Nonradioactive Ventilation System Table 9.9-13 Engineered Safety Features Room Air Recirculation System Table 9.9-14 Fuel Handling Ventilation System Table 9.9-15 Main Exhaust System Table 9.9-16 Control Room Air Conditioning System Table 9.9-17 Diesel Generator Ventilation Systems Table 9.9-18 Turbine Building Ventilation System Table 9.9-19 Access Control Area Air Conditioning System Table 9.9-20 Balance of Unit Ventilation System Table 9.9-21 Engineered Safety Features Room Air Recirc. System Failure Mode Analysis Table 9.9-22 Control Room Air Conditioning System Failure Mode Analysis
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 8 of 15 Table 9.9-23 Diesel Generator Ventilation System Failure Mode Analysis Table 9.9-24 Vital Switchgear Ventilation System Component Description Table 9.9-25 Auxiliary Chilled Water System Component Description Table 9.9-26 Vital Chilled Water System Component Description Table 9.9-27 Indoor Design Temperatures for Significant Plant Areas Table 9.11-1 Compressed Air System Component Description Table 9.11-2 Gas Receiver Tanks Safety Evaluation Table 9.12-3 Water Treatment System Components Table 10.1-1 DELETED Table 10.2-1 Turbine Generator Component Description Table 10.3-2 Major Components of Main Steam System Table 10.3-3 Omitted Table 10.3-4 Operating Details for Valve Systems Protecting Steam Generations of Overpressure Table 10.4-5 Major Components of the Condensate and Feedwater System Table 10.4-6 Failure Analysis of Steam Generator Blowdown System Components Table 11.1-1 Radioactive Waste Processing System Component Description Table 11.1-2 Sources and Expected Volumes of Solid Wastes Table 11.1-3 Radioactivity levels of solid wastes (See Note)
Table 11.1-4 Curie Inventory of Solid Waste Shipped from Millstone Unit 2 (See Note)
Table 11.1-5 Assumptions for Waste Gas Decay Tank Accident Table 11.2-6 Source Terms for Shielding Design Table 11.A-7 Design-Basis and Expected Primary Coolant Activity Concentrations Table 11.A-8 Calculated Reactor Core Activities Table 11.A-9 Expected Annual Effluent Releases (Curies Per Year), by Radionuclide, from Each Release Point Table 11.A-10 Expected Annual Liquid Effluent Activity Releases (Curies/Year), by Radionuclide, from Each Waste Stream Table 11.A-11 Expected Annual Liquid Effluent Concentrations (Diluted and Undiluted), by Radionuclide, from Each Waste System
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 9 of 15 Table 11.A-12 Design Basis Radionuclide Concentrations in Liquid Effluent, in Fractions of 10 CFR Part 20 Concentration Limits Table 11.A-13 Design-Basis Radionuclide Airborne Concentrations at the Site Boundary From All Gaseous Effluent Release Points Combined, in Fractions of 10 CFR Part 20 Concentration Limits Table 11.A-14 Total Annual Design-Basis and Expected Releases of Radioactive Liquid Waste to the Environment From All Sources Combined, in Curies Per Year Table 11.A-15 Total Annual Design Basis and Expected Releases of Airborne Radioactive Waste to the Environment From All Release Points Combined, in Curies Per Year Table 11.A-16 Basis for Reactor Coolant System Activity NUREG-0017 gale Code Input Table 11.B-17 Inputs to PWR-GALE Code Table 11.C-18 Comparison of Calculated Annual Maximum Individual Doses with 10 CFR Part 50 Appendix I Design Objectives Table 11.C-19 Annual Total Body and Thyroid Doses to the Population Within 50 Miles of the Millstone Site, In Man-Rem, From Expected Liquid and Airborne Effluent Releases Table 11.D-20 Containment Building Airborne Concentrations Table 11.D-21 Auxiliary Building Airborne Concentrations Table 11.D-22 Turbine Building Airborne Concentrations Table 13.12-1 Seismic Category I-ASME Section III Classes 1 and 2 Piping Systems Table 14.0-1 Reactor Operating Modes For Millstone Unit 2 Table 14.0-2 Disposition of Events Summary Table 14.0.1-1 Accident Category Used For Each Analyzed Event Table 14.0.2-1 Plant Operating Conditions Table 14.0.2-2 Nominal Fuel Design Parameters Table 14.0.3-1 Core Power Distribution (TABLE DELETED)
Table 14.0.3-1 Range of Key Initial Condition Operating Parameters Table 14.0.5-1 Reactivity Parameters (TABLE DELETED)
Table 14.0.7-1 Analytical Trip Setpoints Table 14.0.7-2 Uncertainties Applied at HFP Condition in Local Power Density Limiting Safety System Settings Calculations
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 10 of 15 Table 14.0.7-3 Uncertainties Applied at HFP Condition in the Thermal Margin/Low Pressure Limiting Safety System Settings Calculations Table 14.0.7-4 Uncertainties Applied at HFP Condition in the Local Power Density Limiting Condition for Operation Calculations Table 14.0.7-5 Uncertainties Applied in Departure from Nucleate Boiling Limiting Condition for Operation Calculations Table 14.0.8-1 Component Capacities and Setpoints Table 14.0.9-1 Overview of Plant Systems and Equipment Available for Transient and Accident Conditions Table 14.0.12-1 Nomenclature Used in Plotted Results Table 14.1.1-1 Available Reactor Protection for the Decrease in Feedwater Temperature Event Table 14.1.1-2 Disposition of Events for the Decrease in Feedwater Temperature Event Table 14.1.2-1 Available Reactor Protection for the Increase in Feedwater Flow Event Table 14.1.2-2 Disposition of Events for the Increase in Feedwater Flow Event Table 14.1.3-1 Available Reactor Protection for the Increase in Steam Flow Event Table 14.1.3-2 Disposition of Events for the Increase in Steam Flow Event Table 14.1.3-3 Initial Conditions for the Increase in Steam Flow Event Table 14.1.3-4 Event Summary for the Increase in Steam Flow Event Table 14.1.3-5 Peak Reactor Power Levels for Increase in Steam Flow Event Table 14.1.4-1 Available Reactor Protection for the Inadvertent Opening of a Steam Generator Relief or Safety Valves Table 14.1.4-2 Disposition of Events for the Inadvertent Opening of a Steam Generator Relief or Safety Valve Event Table 14.1.5.1-1 Available Reactor Protection for Steam System Piping Failures Inside and Outside of Containment Table 14.1.5.1-2 Disposition of Events for Steam System Piping Failures Inside and Outside Containment Table 14.1.5.1-3 S-RELAP5 Thermal-Hydraulic Input (Pre-Scram Steam Line Break)
Table 14.1.5.1-4 Actuation Signals and Delays (Pre-Scram Steam Line Break)
Table 14.1.5.1-5 S-RELAP5 Neutronics Input and Assumptions (Pre-Scram Steam Line Break)
Table 14.1.5.1-6 MDNBR and Peak Reactor Power Level Summary (Pre-Scram Steam Line Break)
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 11 of 15 Table 14.1.5.1-7 LHGR-Limiting Pre-Scram Steam Line Break Sequence of Events: HFP 0.20ft2 Asymmetric Break Inside Containment with Offsite Power Available Table 14.1.5.1-8 MDNBR-Limiting Pre-Scram Steam Line Break Sequence of Events: HFP 3.51ft2 Asymmetric Break Inside Containment with Loss of Offsite Power Table 14.1.5.2-1 Available Reactor Protection for Steam System Piping Failures Inside and Outside of Containment, Post-Scram Analysis Table 14.1.5.2-2 Disposition of Events for Steam System Piping Failures Inside and Outside of Containment, Post-Scram Analysis Table 14.1.5.2-3 SRELAP5 -Thermal-Hydraulic Input (Post-Scram Steam Line Break)
Table 14.1.5.2-4 Actuation Signals and Delays (Post-Scram Steam Line Break)
Table 14.1.5.2-5 S-RELAP5 Neutronics Input and Assumptions (Post-Scram Steam Line Break)
Table 14.1.5.2-6 Post-Scram Steam Line Break Analysis Summary Table 14.1.5.2-7 LHGR-Limiting Sequence of Events - HZP Offsite Power Available Table 14.1.5.2-8 MDNBR-Limiting Post-Scram Steam Line Break Analysis Summary Table 14.1.5.3-1 Assumptions Used in Main Steam Line Break Analysis Table 14.1.5.3-2 Summary of Millstone 2 MSLB Accident Doses Table 14.1.5.3-3 Deleted by FSARCR PKG FSC 07-MP2-006 Table 14.2.1-1 Available Reactor for the Loss of External Load Event Table 14.2.1-2 Disposition of Events for the Loss of External Load Event Table 14.2.1-3 Event Summary for the Loss of External Load Event (Primary Overpressurization Case)
Table 14.2.1-4 Event Summary for the Loss of External Load Event (Secondary Overpressurization Case)
Table 14.2.1-5 Event Summary for the Loss of External Load Event (Minimum Departure from Nucleate Boiling Ratio Case)
Table 14.2.2-1 Available Reactor Protection for the Turbine Trip Event Table 14.2.2-2 Disposition of Events for the Turbine Trip Event Table 14.2.4-1 Available Reactor Protection for the Closure of the Main Steam Isolation Valves Events Table 14.2.4-2 Disposition of Events for the Closure of the Main Steam Isolation Valves Events Table 14.2.4-3 Event Summary for the Main Steam Isolation Valve Closure Event (Lower Steam Flow Case)
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 12 of 15 Table 14.2.7-1 Available Reactor Protection for the Loss of Normal Feedwater Flow Event Table 14.2.7-2 Disposition of Events for the Loss of Normal Feedwater Flow Event Table 14.2.7-3 Sequence of Events for Minimum Steam Generator Inventory Case: One Motor-Driven AFW Pump Fails to Start with Offsite Power and Steam Dumps Table 14.2.7-4 Sequence of Events for Maximum Pressurizer Level Case: Loss of Offsite Power, One Motor-Driven AFW Pump Fails to Start Table 14.3.1-1 Available Reactor Protection for the Loss of Forced Reactor Coolant Flow Event Table 14.3.1-2 Disposition of Events for the Loss of Forced Reactor Coolant Flow Event Table 14.3.1-3 Event Summary for the Loss of Forced Reactor Coolant Flow Table 14.3.3-1 Available Reactor Protection for the Reactor Coolant Pump Rotor Seizure Event Table 14.3.3-2 Disposition of Events for the Reactor Coolant Pump Rotor Seizure Event Table 14.3.3-3 Event Summary for the Reactor Coolant Pump Rotor Seizure Table 14.4.1-1 Available Reactor Protection for the Uncontrolled Control Rod/Bank Withdrawal from a Subcritical or Low-Power Startup Condition Event Table 14.4.1-2 Disposition of Events for the Uncontrolled Control Rod/Bank Withdrawal from a Subcritical or Low-Power Startup Condition Event Table 14.4.1-3 Event Summary for the Uncontrolled Bank Withdrawal from Low-Power Event Table 14.4.2-1 Available Reactor Protection for the Uncontrolled Control Rod/Bank Withdrawal at Power Event Table 14.4.2-2 Disposition of Events for the Uncontrolled Control Rod/Bank Withdrawal at Power Event Table 14.4.2-3 Event Summary for the Uncontrolled Rod/Bank Withdrawal Event for the Limiting 100% Power Case Table 14.4.3.1-1 Available Reactor Protection for the Dropped Control Rod/Bank Event Table 14.4.3.1-2 Disposition of Events for the Dropped Control Rod/Bank Event Table 14.4.3.1-3 Event Summary for the Limiting Dropped Control Rod/Bank Case Table 14.4.3.5-1 Available Reactor Protection for the Single Control Rod Withdrawal Event Table 14.4.3.5-2 Disposition of Events for the Single Control Rod Withdrawal Event Table 14.4.4-1 Available Reactor Protection Table 14.4.4-2 Disposition of Events for the Startup of an Inactive Loop Event Table 14.4.6-1 Available Reactor Protection for Chemical and Volume Control System
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 13 of 15 Malfunction that Results in a Decrease in the Boron Concentration in the Reactor Coolant Event Table 14.4.6-2 Disposition of Events for the Chemical and Volume Control System Malfunction that Results in a Decrease in the Boron Concentration in the Reactor Coolant Event Table 14.4.6-3 Summary of Results for the Boron Dilution Event Asymmetric Dilution Front Model Table 14.4.6-4 Summary of Results for the Boron Dilution Event Instantaneous Mixing Mode Table 14.4.8-1 Available Reactor Protection for the Spectrum of Control Rod Ejection Accidents Table 14.4.8-2 Disposition of Events for the Spectrum of Control Rod Ejection Accidents Table 14.4.8-3 Event Summary for a Control Rod Ejection (Maximum Pressurization Case)
Table 14.4.8-4 Event Summary for a Control Rod Ejection Minimum Departure from Nucleate Boiling Ratio Case Table 14.4.8-5 dnBounding Beginning of Cycle/End of Cycle Ejected Rod Analysis Table 14.4.8-6 CREA Radiological Analysis Assumptions Table 14.4.8-7 Radiological Consequences of a CREA Table 14.6.1-1 Available Reactor Protection for the Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve Event Table 14.6.1-2 Disposition of Events for the Inadvertent Opening of a Pressurized Water Reactor Pressurizer Relief Valve Event Table 14.6.1-3 Event Summary for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve Table 14.6.3-1 Available Reactor Protection for the Radiological Consequences of Steam Generator Tube Rupture Event Table 14.6.3-2 Disposition of Events for the Radiological Consequences of Steam Generator Tube Rupture Event Table 14.6.3-3 Sequence of Events for the Steam Generator Tube Rupture Event Table 14.6.3-4 Mass Releases for the Steam Generator Tube Rupture Accident Table 14.6.3-5 Assumptions for the Radiological Evaluation for the Steam Generator Tube Rupture Event Table 14.6.3-6 Summary - Radiological Consequences of the Steam Generator Tube Rupture Event
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 14 of 15 Table 14.6.5.1-1 Available Reactor Protection for the Large Break Loss of Coolant Accident Table 14.6.5.1-2 Disposition of Events for the Large Break Loss of Coolant Accident Table 14.6.5.1-3 Millstone Unit 2 System Analysis Parameters (Large Break Loss of Coolant Accident Analysis)
Table 14.6.5.1-4 Millstone Unit 2 Large Break Loss of Coolant Accident Analysis Table 14.6.5.1-5 Millstone Unit 2 Large Break LOCA Analysis Table 14.6.5.1-6 Millstone Unit 2 Large Break LOCA Analysis Table 14.6.5.1-7 Peak Clad Temperature Including All Penalties and Benefits - Large Break LOCA Table 14.6.5.2-1 Available Reactor Protection for the Small Break Loss of Coolant Accident Table 14.6.5.2-2 Disposition of Events for the Small Break Loss of Coolant Accident Table 14.6.5.2-3 Millstone Unit 2 Small Break Loss of Coolant Accident System Analysis Parameters Table 14.6.5.2-4 Deleted by FSCR MPS-UCR-2016-016 Table 14.6.5.2-5 Calculated Event Times for Small Break Loss-of-Coolant Accident Table 14.6.5.2-6 Analysis Results for Small Break Loss-of-Coolant Accident Table 14.6.5.2-7 Peak Clad Temperature Including All Penalties and Benefits - Small Break LOCA Table 14.6.5.3-1 Core and System Parameters Used in the LTC Analysis Table 14.7.1-1 Deleted by FSARCR PKG FSC 07-MP2-006 Table 14.7.4-1 Assumption for Fuel Handling Accident in the Spent Fuel Pool Table 14.7.4-2 Assumption for Fuel Handling Accident in Containment Table 14.7.4-3 Deleted by FSARCR 02-MP2-015 Table 14.7.5-1 Assumptions for Spent Fuel Cask Tip Accident Table 14.8.2-1 Containment Design Parameters Table 14.8.2-2 Initial Conditions for Pressure Analyses Table 14.8.2-3 Minimum Containment Heat Sink Data Table 14.8.2-4 Sequence of Events, MP2-MSLB: Loss of Offsite Power and the Failure of Vital Bus VA-10 or VA-20 from 102% Power Table 14.8.2-5 Engineered Safety Features Performance for MSLB Containment Analysis Table 14.8.4-1 Loss of Coolant Accident (Off site Assumptions)
MPS2 UFSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 15 of 15 Table 14.8.4-2 Summary of Doses for Loss of Coolant Accident Table 14.8.4-3 Loss of Coolant Accident (Control Room Assumptions)
Table 14.8.4-4 Atmospheric Dispersion Data for Millstone Unit 2 Control Room Table 14.8.4-5 Dose to Millstone Unit 2 Control Room Operators Table 15.3-1 Containment Tendon Prestress Table 15.6-1 License Renewal Commitments
MPS2 UFSAR LOEF 1 of 49 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET 1.2-1 FIGURE 1.2-1 Site Layout N/A 1.2-2 FIGURE 1.2-2 Plot Plan 25203-10003 (a) 1.2-3 FIGURE 1.2-3 General Arrangement, Turbine Building Plan at Operating Floor Elevation 54 Feet 6 Inches 25203-27011 (a) 1.2-4 FIGURE 1.2-4 General Arrangement, Turbine Building Plan at Mezzanine Floor Elevation 31 Feet 6 Inches 25203-27012 (a) 1.2-5 FIGURE 1.2-5 General Arrangement, Turbine Building Plan at Ground Floor Elevation 14 Feet 6 Inches 25203-27013 (a) 1.2-6 FIGURE 1.2-6 General Arrangement Containment Plan at Floor Elevation 14 feet 6 inches and Elevation 36 feet 6 inches 25203-27014 (a) 1.2-7 FIGURE 1.2-7 General Arrangement Auxiliary Building Plan at Elevation 36 feet 6 inches and Elevation 38 feet 6 inches 25203-27015 (a) 1.2-8 FIGURE 1.2-8 General Arrangement Auxiliary Building Sections G-G and H-H 25203-27016 (a) 1.2-9 FIGURE 1.2-9 General Arrangement Auxiliary Building Ground Floor Elevation 14 feet 6 inches and Cable Vault Elevation 25 feet 6 inches 25203-27017 (a) 1.2-10 FIGURE 1.2-10 General Arrangement Containment and Auxiliary Building Plan at Elevation (-)5 feet 0 inches and Elevation (-)3 feet 6 inches 25203-27018 (a) 1.2-11 FIGURE 1.2-11 General Arrangement Containment and Auxiliary Building Plan at Elevation (-)25 feet 6 inches and Elevation (-)22 feet 6 inches 25203-27019 (a) 1.2-12 FIGURE 1.2-12 General Arrangement Containment and Auxiliary Building Plan at Elevation (-)45 feet 6 inches 25203-27020 (a) 1.2-13 FIGURE 1.2-13 General Arrangement Containment and Auxiliary Building Section A-A 25203-27021 (a) 1.2-14 FIGURE 1.2-14 General Arrangement Containment and Auxiliary Building Section B-B 25203-27022 (a) 1.2-15 FIGURE 1.2-15 General Arrangement Turbine Building Sections C-C and E-E 25203-27023 (a)
MPS2 UFSAR LOEF 2 of 49 1.2-16 FIGURE 1.2-16 General Arrangement Turbine Building Sections D-D and F-F 25203-27024 (a) 1.2-17 FIGURE 1.2-17 General Arrangement Intake Structure Auxiliary Steam Boiler Room Plan and Section 25203-27025 (a) 2.4-1 FIGURE 2.4-1 Geological Features N/A 2.4-2a FIGURE 2.4-2a Boring Plan N/A 2.4-2b FIGURE 2.4-2b Test Borings N/A 2.4-2c FIGURE 2.4-2c Boring Logs N/A 2.4-2d FIGURE 2.4-2d Boring Logs N/A 2.4-3 FIGURE 2.4-3 Seismic Line Location Map N/A 2.4-4 FIGURE 2.4-4 Seismic Profiles N/A 2.5-1 FIGURE 2.5-1 Topography in the Vicinity of Millstone Point N/A 2.5-2 FIGURE 2.5-2 Bore Hole and Test Pit Locations N/A 2.5-3 FIGURE 2.5-3 Test Pit Number 1 N/A 2.5-4 FIGURE 2.5-4 Test Pit Number 2 N/A 2.5-5 FIGURE 2.5-5 Relationship Between Hurricane Wind Direction and Plant Layout N/A 2.5-6 FIGURE 2.5-6 Section Through Plant N/A 2.5-7 FIGURE 2.5-7 Profiles of Plant N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 3 of 49 2.5-8 FIGURE 2.5-8 Surge Hydrograph for PMH N/A 2.5-9 FIGURE 2.5-9 Bottom Profile for Surge Traverse Line N/A 2.5-10 FIGURE 2.5-10 Storm Tracker for Probable Maximum Hurricane N/A 2.5-11 FIGURE 2.5-11 Location of the Center of the Storm Within the Critical Area N/A 2.5-12 FIGURE 2.5-12 Shore Protection N/A 2.5-13 FIGURE 2.5-13 Shore Protection N/A 2.5-14 FIGURE 2.5-14 Wave Force Diagrams For The Three Zones And Their Corresponding Bottom Profiles Near The Walls N/A 2.5-15 FIGURE 2.5-15 Typical Anchorage Detail N/A 2.5-16 FIGURE 2.5-16 Filter System and the Gradation of the Filter Materials N/A 2.5-17 FIGURE 2.5-17 Scour Protection N/A 2.5-18 FIGURE 2.5-18 Flood Protection N/A 2.5-19 FIGURE 2.5-19 General Roof Plan N/A 2.5-20 FIGURE 2.5-20 Drainage Plan N/A 2.5-21 FIGURE 2.5-21 Turbine and Auxiliary Building Plans at Elevation 14 Feet 6 Inches N/A 2.5-22 FIGURE 2.5-22 Auxiliary Building Basement Plans N/A 2.5-23 FIGURE 2.5-23 Intake Structure N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 4 of 49 2.5-24 FIGURE 2.5-24 Louver Protection - Intake Structure N/A 2.7-1 FIGURE 2.7-1 Excavation Plan N/A 2.7-2 FIGURE 2.7-2 Backfill and Compaction Requirements N/A 3.1-1 FIGURE 3.1-1 Reactor Vertical Arrangement N/A 3.1-2 FIGURE 3.1-2 Reactor Core Cross Section N/A 3.3-1 FIGURE 3.3-1 Fuel Rod Assembly N/A 3.3-2A FIGURE 3.3-2A AREVA - Reload Fuel Assembly Batch S and Prior N/A 3.3-2B FIGURE 3.3-2B AREVA - Reload Fuel Assembly Batch T and Later N/A 3.3-3A FIGURE 3.3-3A AREVA - Reload Fuel Assembly Components Batch S and Prior N/A 3.3-3B FIGURE 3.3-3B AREVA - Reload Fuel Assembly Components Batch T and Later N/A 3.3-4A FIGURE 3.3-4A Bi-Metallic Fuel Spacer Assembly N/A 3.3-4B FIGURE 3.3-4B HTP Fuel Space Assembly N/A 3.3-5 FIGURE 3.3-5 Fuel Assembly Hold Down Device N/A 3.3-6 FIGURE 3.3-6 Control Element Assembly N/A 3.3-7 FIGURE 3.3-7 Control Element Assembly Materials N/A 3.3-8 FIGURE 3.3-8 Control Element Assemblies Group and Number Designation N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 5 of 49 3.3-9 FIGURE 3.3-9 Core Orientation N/A 3.3-11 FIGURE 3.3-11 Reactor Internals Assembly N/A 3.3-12 FIGURE 3.3-12 Pressure Vessel-Core Support Barrel Snubber Assembly N/A 3.3-13 FIGURE 3.3-13 Core Shroud Assembly N/A 3.3-14 FIGURE 3.3-14 Upper Guide Structure Assembly N/A 3.3-15 FIGURE 3.3-15 Control Element Drive Mechanism (Magnetic Jack)
N/A 3.3-16 FIGURE 3.3-16 (Left Blank Intentionally)
N/A 3.3-17 FIGURE 3.3-17 Heated Junction Thermocouple Probe Pressure Boundary Installation N/A 3.3-18 FIGURE 3.3-18 Typical Heated Junction Thermocouple Probe Assembly Installation N/A 3.3-19 FIGURE 3.3-19 Placement of Natural Uranium Replacement Fuel Rods and Fuel Assembly Orientation Relative to the Core Baffle for Cycle 19 N/A 3.4-1 FIGURE 3.4-1 Representative Full Core Loading Pattern N/A 3.4-2 FIGURE 3.4-2 Representative Quarter Core Loading Pattern N/A 3.4-3 FIGURE 3.4-3 Representative BOC and EOC Exposure Distribution N/A 3.4-4 FIGURE 3.4-4 Representative Boron Letdown, HFP, ARO N/A 3.4-5 FIGURE 3.4-5 Representative Normalized Power Distributions, Hot Full Power, Equilibrium Xenon, 150 MWD/MTU N/A 3.4-6 FIGURE 3.4-6 Representative Normalized Power Distribution, Hot Full Power, Equilibrium Xenon, 18,020 MWD/MTU N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 6 of 49 3.A-1 FIGURE 3.A-1 Representative Node Locations - Horizontal Mathematical Model N/A 3.A-2 FIGURE 3.A-2 Mathematical Model - Horizontal Seismic Analysis N/A 3.A-3 FIGURE 3.A-3 Mathematical Model - Vertical Seismic Analysis N/A 3.A-4 FIGURE 3.A-4 Core Support Barrel Upper Flange - Finite Element Model N/A 3.A-5 FIGURE 3.A-5 Core Support Barrel Lower Flange - Finite Element Model N/A 3.A-6 FIGURE 3.A-6 Lateral Seismic Model - Mode 1, 3.065 CPS N/A 3.A-7 FIGURE 3.A-7 Lateral Seismic Model - Mode 2, 5.118 CPS N/A 3.A-8 FIGURE 3.A-8 Lateral Seismic Model - Mode 2, 5.118 CPS N/A 3.A-9 FIGURE 3.A-9 Reactor Vessel Flange Vertical Response Spectrum (1% Damping)
N/A 3.A-10 FIGURE 3.A-10 ASHSD Finite Element Model of the Core Support Barrel/Thermal Shield System N/A 3.A-11 FIGURE 3.A-11 Vertical Shock Model N/A 3.A-12 FIGURE 3.A-12 Lateral Shock Mode N/A 3.A-13 FIGURE 3.A-13 SAMMSOR DYNASOR Finite Element Model of Core Support Barrel N/A 4.1-1 FIGURE 4.1-1 P&ID for Reactor Coolant System & Pump (Sheet 1) 25203-26014 (a) Sheet 1 of 3 4.1-1 FIGURE 4.1-1 P&ID for Reactor Coolant System & Pump (Sheet 2) 25203-26014 (a) Sheet 2 of 3 4.1-1 FIGURE 4.1-1 P&ID for Reactor Coolant System & Pump (Sheets 3) 25203-26014 (a) Sheet 3 of 3 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 7 of 49 4.1-2 FIGURE 4.1-2 Reactor Coolant System Arrangement-Elevation N/A 4.1-3 FIGURE 4.1-3 Reactor Coolant System Arrangement-Plan N/A 4.3-1 FIGURE 4.3-1 Reactor Vessel N/A 4.3-2 FIGURE 4.3-2 Steam Generator N/A 4.3-3 FIGURE 4.3-3 Reactor Coolant Pump N/A 4.3-4 FIGURE 4.3-4 P&ID Reactor Coolant Pump 25203-26014 (a) Sheet 3 of 3 4.3-5 FIGURE 4.3-5 Reactor Coolant Pump Seal Area N/A 4.3-6 FIGURE 4.3-6 Reactor Coolant Pump Predicted Performance N/A 4.3-7 FIGURE 4.3-7 Pressurizer N/A 4.3-8 FIGURE 4.3-8 Temperature Control Program N/A 4.3-9 FIGURE 4.3-9 Pressurizer Level Setpoint Program N/A 4.3-10 FIGURE 4.3-10 Pressurizer Level Control Program N/A 4.3-11 FIGURE 4.3-11 Quench Tank N/A 4.3-12 FIGURE 4.3-12 Permanent Reactor Cavity Seal Plate N/A 4.5-1 FIGURE 4.5-1 Reactor Coolant System Pressure Temperature Limitations for 7 Full Power Years N/A 4.5-2 FIGURE 4.5-2 Reactor Coolant System Pressure - Temp Limitations During Plant Heatup/Cooldown After 7 Years Integrated Neutron Flux N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 8 of 49 4.5-3 FIGURE 4.5-3 Reactor Coolant System Pressure Temperature Limitations For 0 to 2 Years of Full Power N/A 4.5-4 FIGURE 4.5-4 Reactor Coolant System Heatup Limitations for 54 EFPY N/A 4.5-5 FIGURE 4.5-5 Reactor Coolant System Cooldown Limitations for 54 EFPY N/A 4.6-1 FIGURE 4.6-1 Location of Surveillance Capsule Assemblies N/A 4.6-2 FIGURE 4.6-2 Typical Surveillance Capsule Assembly N/A 4.6-3 FIGURE 4.6-3 Typical Charpy Impact Compartment Assembly N/A 4.6-4 FIGURE 4.6-4 Typical Tensile-Monitor Compartment Assembly N/A 4.6-5 FIGURE 4.6-5 Base Metal - WR (Transverse) Plate C-506-1 Impact Energy vs Temperature N/A 4.6-6 FIGURE 4.6-6 Base Metal - WR (Transverse) Plate C-506-1 Lateral Expansion versus Temperature N/A 4.6-7 FIGURE 4.6-7 Base Metal - RW (Longitudinal) Plate C-506-1 Impact Energy versus Temperature N/A 4.6-8 FIGURE 4.6-8 Base Metal - RW (Longitudinal) Plate C-506-1 Lateral Expansion vs Temperature N/A 4.6-9 FIGURE 4.6-9 WELD Metal PLATE C-506-2/C-506-3 IMPACT ENERGY vs Temperature N/A 4.6-10 FIGURE 4.6-10 Weld Metal, Plate C-506-2/C-506-3 Lateral Expansion vs Temperature N/A 4.6-11 FIGURE 4.6-11 HAZ Metal, Plate C-506-1 Impact Energy versus Temperature N/A 4.6-12 FIGURE 4.6-12 HAZ Metal, Plate C-506-1 Lateral Expansion versus Temperature N/A 4.6-13 FIGURE 4.6-13 SRM (HSST Plate 01MY - Longitudinal) Impact Energy versus Temperature N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 9 of 49 4.6-14 FIGURE 4.6-14 SRM (HSST Plate 01MY - Longitudinal) Lateral Expansion versus Temperature N/A 4.A-1 FIGURE 4.A-1 Reactor Coolant System Seismic Analysis Model MS2 N/A 4.A-1A FIGURE 4.A-1A Reactor Coolant System - Seismic Analysis Model MS2 and RV14 N/A 4.A-2 FIGURE 4.A-2 RV14 Reactor and Internals Seismic Analysis Model N/A 4.A-3 FIGURE 4.A-3 Pressurizer Seismic Analysis Model N/A 4.A-4 FIGURE 4.A-4 Surge Line Seismic Analysis Model N/A 5.2-1 FIGURE 5.2-1 Containment Structure Details N/A 5.2-2 FIGURE 5.2-2 Containment Structure Details N/A 5.2-3 FIGURE 5.2-3 Design Thermal Gradient N/A 5.2-4 FIGURE 5.2-4 Equipment Hatch Details N/A 5.2-5 FIGURE 5.2-5 Personnel Lock Details N/A 5.2-6 FIGURE 5.2-6 Liner Plate N/A 5.2-7 FIGURE 5.2-7 Leak Chase Channels N/A 5.2-8 FIGURE 5.2-8 Typical Penetrations N/A 5.2-9 FIGURE 5.2-9 Bracket Details N/A 5.2-10 FIGURE 5.2-10 Liner Plate Details N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 10 of 49 5.2-11 FIGURE 5.2-11 Reactor Vessel Support Details N/A 5.2-12 FIGURE 5.2-12 Lower Steam Generator Support Details N/A 5.2-13 FIGURE 5.2-13 Upper Steam Generator Support Details N/A 5.2-14 FIGURE 5.2-14 Primary and Secondary Shield Wall N/A 5.2-15 FIGURE 5.2-15 Detail - Seismic Restraint N/A 5.2-16 FIGURE 5.2-16 Finite Element Mesh of Bottom of Containment Shell N/A 5.2-17 FIGURE 5.2-17 Finite Element Mesh of Top of Containment Shell N/A 5.2-18 FIGURE 5.2-18 Finite Element Mesh of Containment Shell for Stressing Sequence N/A 5.2-19 FIGURE 5.2-19 Containment Structure Stress Analysis Summary, Dead Load and Initial Prestress, Live Load N/A 5.2-20 FIGURE 5.2-20 Containment Structure Stress Analysis Summary, Dead Load, Live Load, Prestress and Test Pressure N/A 5.2-21 FIGURE 5.2-21 Containment Structure Stress Analysis Summary, Dead Load, Live Load, Prestress, Operating Temperature and DBE N/A 5.2-22 FIGURE 5.2-22 Containment Structure Stress Analysis Summary, Dead Load, Live Load, Prestress, 100% Accident Pressure and Accident Temperature N/A 5.2-23 FIGURE 5.2-23 Containment Structure Stress Analysis Summary, Dead Load, Prestress, Operating Temperature, Thermal Expansion Forces of Pipes, Pipe Rupture Forces and DBE N/A 5.2-24 FIGURE 5.2-24 Containment Structure Stress Analysis Summary, Dead Load, Prestress, 100% Accident Pressure, Thermal Expansion Forces of Pipes, Accident Temperature and DBE N/A 5.2-25 FIGURE 5.2-25 Containment Structure Stress Analysis Summary, Dead Load, Prestress, 125% Accident Pressure, 125% Thermal Expansion Forces of Pipes, Accident Temperature and 125% OBE N/A 5.2-26 FIGURE 5.2-26 Containment and Structure Stress Analysis Summary, Dead Load, Prestress, 150% Accident Pressure and Accident Temperature N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 11 of 49 5.2-27 FIGURE 5.2-27 Isolation Valve Arrangements N/A 5.2-28 FIGURE 5.2-28 Isolation Valve Arrangements N/A 5.2-29 FIGURE 5.2-29 Isolation Valve Arrangements N/A 5.2-30 FIGURE 5.2-30 Isolation Valve Arrangements N/A 5.2-31 FIGURE 5.2-31 Isolation Valve Arrangements N/A 5.2-32 FIGURE 5.2-32 Isolation Valve Arrangements N/A 5.2-33 FIGURE 5.2-33 Isolation Valve Arrangements N/A 5.2-34 FIGURE 5.2-34 Isolation Valve Arrangements N/A 5.2-35 FIGURE 5.2-35 Reactor Coolant System Plan N/A 5.2-36 FIGURE 5.2-36 Reactor Coolant System Elevation N/A 5.2-37 FIGURE 5.2-37 Deleted by FSARCR 04-MP2-016 N/A 5.3-1 FIGURE 5.3-1 Enclosure Building N/A 5.3-2 FIGURE 5.3-2 Enclosure Building Layout N/A 5.3-3 FIGURE 5.3-3 Waterproof Membrane Details N/A 5.3-4 FIGURE 5.3-4 Waterproof Membrane Details N/A 5.3-5 FIGURE 5.3-5 Spent Fuel Cask Travel Limits N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 12 of 49 5.4-1 FIGURE 5.4-1 Probable Missile Trajectories Inside Auxiliary Building N/A 5.4-2 FIGURE 5.4-2 Missile Resistant Siding Detail N/A 5.4-3 FIGURE 5.4-3 Location of Missile Resistant Siding N/A 5.5-1 FIGURE 5.5-1 Joint Detail at Turbine Pedestal N/A 5.5-2 FIGURE 5.5-2 Joint Detail at Col. Line E N/A 5.6-1 FIGURE 5.6-1 Intake Structure Layout N/A 5.6-2 FIGURE 5.6-2 C. W. System - Plan N/A 5.8-1 FIGURE 5.8-1 Recommended Damped Response Spectra 9%g Acceleration, Operating Basis Earthquake N/A 5.8-2 FIGURE 5.8-2 Recommended Damped Response Spectra 17%g Acceleration, Design Basis Earthquake N/A 5.8-3 FIGURE 5.8-3 Recommended Damped Response Spectra 9%g Acceleration, Operating Basis Earthquake (Soil Surface)
N/A 5.8-4 FIGURE 5.8-4 Recommended Damped Response Spectra, 17%g Acceleration, Design Basis Earthquake (Soil Surface)
N/A 5.8-5 FIGURE 5.8-5 Comparison of Smooth Response Spectra vs. Response Spectra from the Anamet Time History Design Earthquake (Critical Damping = 0.5%)
N/A 5.8-6 FIGURE 5.8-6 Comparison of Smooth Response Spectra vs. Response Spectra from the Anamet Time History Design Earthquake (Critical Damping = 1%)
N/A 5.8-7 FIGURE 5.8-7 Comparison of Smooth Response Spectra vs. Response Spectra from the Anamet Time History Design Earthquake (Critical Damping = 2%)
N/A 5.8-8 FIGURE 5.8-8 Comparison of Smooth Response Spectra vs. Response Spectra from the Anamet Time History Design Earthquake (Critical Damping = 5%)
N/A 5.8-9 FIGURE 5.8-9 Response Spectra from the Time History Design Earthquake with Various Frequency Intervals N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 13 of 49 5.8-10 FIGURE 5.8-10 Comparison of Response Spectra with 1952 Taft and 1940 El Centro Earthquake N/A 5.8-11 FIGURE 5.8-11 Foundation Outline N/A 5.8-12 FIGURE 5.8-12 Sections A-A & B-B N/A 5.8-13 FIGURE 5.8-13 Auxiliary Bay of Turbine Building N/A 5.8-14 FIGURE 5.8-14 Containment Mass Model N/A 5.8-15 FIGURE 5.8-15 Mode Shapes for the Containment Building N/A 5.8-16 FIGURE 5.8-16 Containment Building Design Earthquake 9% Ground Acceleration N/A 5.8-17 FIGURE 5.8-17 Containment Building Design Earthquake 17% Ground Acceleration N/A 5.8-18 FIGURE 5.8-18 Containment Structure Elevation 53 feet 0 inches N/A 5.8-19 FIGURE 5.8-19 Containment Structure Elevation 97 feet 0 inches N/A 5.8-20 FIGURE 5.8-20 Containment Structure Elevation 152 feet 6 inches N/A 5.8-21 FIGURE 5.8-21 Containment Internals Model N/A 5.8-22 FIGURE 5.8-22 Mode Shapes & Frequencies Containment Internals - North-South N/A 5.8-23 FIGURE 5.8-23 Mode Shapes & Frequencies Containment Internals - North-South OBE (DBE)
N/A 5.8-24 FIGURE 5.8-24 Mode Shapes & Frequencies Containment Internals - East-West N/A 5.8-25 FIGURE 5.8-25 Containment Internals - East-West OBE (DBE)
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 14 of 49 5.8-26 FIGURE 5.8-26 Containment Internals Elevation 0 feet 0 inches - OBE (North-South) Reactor Vessel Support N/A 5.8-27 FIGURE 5.8-27 Containment Internals Elevation 0 feet 0 inches - OBE (East-West) Reactor Vessel Support N/A 5.8-28 FIGURE 5.8-28 Containment Internals Elevation 14 feet 6 inches - OBE (North-South) Pressurizer Support N/A 5.8-29 FIGURE 5.8-29 Containment Internals Elevation 14 feet 6 inches - OBE (East-West) Pressurizer Support N/A 5.8-30 FIGURE 5.8-30 Containment Internals Elevation 38 feet 6 inches - OBE (North-South) Safety Injection Tank Support N/A 5.8-31 FIGURE 5.8-31 Containment Internals Elevation 38 feet 6 inches - OBE (East-West) Safety Injection Tank Support N/A 5.8-32 FIGURE 5.8-32 Containment Internals Elevation 43 feet 0 inches - OBE (North-South) Steam Generator Upper Support (Snubbers)
N/A 5.8-33 FIGURE 5.8-33 Containment Internals Elevation 43 feet 0 inches - OBE (East-West) Steam Generator Upper Support (Snubbers)
N/A 5.8-34 FIGURE 5.8-34 Containment Internals Elevation 50 feet 0 inches - OBE (North-South) Steam Generator Upper Support (Shear Keys)
N/A 5.8-35 FIGURE 5.8-35 Containment Internals Elevation 50 feet 0 inches - OBE (East-West) Steam Generator Upper Support (Shear Keys)
N/A 5.8-36 FIGURE 5.8-36 Containment Internals Elevation0 feet 0 inches - OBE (North-South) Steam Generator Lower Support N/A 5.8-37 FIGURE 5.8-37 Containment Internals Elevation 0 feet 0 inches - OBE (East-West) Steam Generator Lower Support N/A 5.8-38 FIGURE 5.8-38 Auxiliary Building Model N/A 5.8-39 FIGURE 5.8-39 Mode Shapes & Frequencies Auxiliary Building - North-South N/A 5.8-40 FIGURE 5.8-40 Auxiliary Building - North-South OBE (DBE)
N/A 5.8-41 FIGURE 5.8-41 Mode Shapes & Frequencies Auxiliary Building - East-West N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 15 of 49 5.8-42 FIGURE 5.8-42 Auxiliary Building - East-West OBE (DBE)
N/A 5.8-43 FIGURE 5.8-43 Auxiliary Building Elevation 14 feet 6 inches N/A 5.8-44 FIGURE 5.8-44 Auxiliary Building Elevation 38 feet 6 inches N/A 5.8-45 FIGURE 5.8-45 Auxiliary Building Elevation 71 feet 6 inches N/A 5.8-46 FIGURE 5.8-46 Warehouse Model N/A 5.8-47 FIGURE 5.8-47 Mode Shapes & Frequencies Warehouse Bldg. - East-West N/A 5.8-48 FIGURE 5.8-48 Mode Shapes & Frequencies Warehouse Bldg. - North-South N/A 5.8-49 FIGURE 5.8-49 Warehouse Bldg. - OBE (DBE)
N/A 5.8-50 FIGURE 5.8-50 Warehouse Elevation 38 feet 6 inches N/A 5.8-51 FIGURE 5.8-51 Turbine Building Model N/A 5.8-52 FIGURE 5.8-52 Mode Shapes & Frequencies Turbine Bldg. - North-South N/A 5.8-53 FIGURE 5.8-53 Turbine Bldg. OBE (DBE) East-West N/A 5.8-54 FIGURE 5.8-54 Mode Shapes & Frequencies Turbine Bldg. - East-West N/A 5.8-55 FIGURE 5.8-55 Turbine Bldg. OBE (DBE) North-South N/A 5.8-56 FIGURE 5.8-56 Turbine Building Elevation 31 feet 6 inches N/A 5.8-57 FIGURE 5.8-57 Turbine Building Crane - OBE N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 16 of 49 5.8-58 FIGURE 5.8-58 Intake Structure Model N/A 5.8-59 FIGURE 5.8-59 Intake Structure OBE (DBE)
N/A 5.8-60 FIGURE 5.8-60 Mode Shapes & Frequencies Intake Structure N/A 5.8-61 FIGURE 5.8-61 Intake Structure Elevation 14 feet 0 inches OBE N/A 5.A-1 FIGURE 5.A-1 Thick Walled Cylinder With Internal Pressure N/A 5.D-1 FIGURE 5.D-1 Tangential Velocities as Derived from Hoecker's Pressure - Time Profile N/A 5.D-2 FIGURE 5.D-2 Monthly Weather Review - Hoecker N/A 5.D-3 FIGURE 5.D-3 Test Data Summary N/A 5.D-1A FIGURE 5.D-1A Plan of Spent Fuel Area N/A 5.D-2A FIGURE 5.D-2A Spent Fuel Pool Section View N/A 5.D-3A FIGURE 5.D-3A Missile Strike Angle to Missile Proof Siding N/A 6.1-1 FIGURE 6.1-1 Safety Injection P&ID (Sheet 1) 25203-26015 (a) Sheet 1 of 3 6.1-1 FIGURE 6.1-1 Safety Injection P&ID (Sheet 2) 25203-26015 (a) Sheet 2 of 3 6.1-1 FIGURE 6.1-1 Safety Injection P&ID (Sheet 3) 25203-26015 (a) Sheet 3 of 3 6.1-2 FIGURE 6.1-2 Main Steam Pipe Whip Restraint N/A 6.1-3 FIGURE 6.1-3 Pipe Restraint Design N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 17 of 49 6.1-4 FIGURE 6.1-4 Fluid Jet Expansion Model N/A 6.3-1 FIGURE 6.3-1 Safety Injection and Containment Spray Pumps Suction Piping N/A 6.3-2 FIGURE 6.3-2 High Pressure Safety Injection Pump Performance N/A 6.3-3 FIGURE 6.3-3 Low Pressure Safety Injection Pump Performance N/A 6.4-1 FIGURE 6.4-1 Area 5 Piping Containment Spray and Hydrogen Purge N/A 6.4-2 FIGURE 6.4-2 Containment Spray Nozzles Spray Patterns (1713A Nozzle Spraying Horizontally)
N/A 6.4-3 FIGURE 6.4-3 Containment Spray Nozzles Spray Patterns (1713A Nozzle Spraying Downward on 45°)
N/A 6.4-4 FIGURE 6.4-4 Containment Spray Nozzles Spray Patterns (1713A Nozzle Spraying Vertically Downward)
N/A 6.4-4A FIGURE 6.4-4A Typical Spray Coverage Patterns N/A 6.4-5 FIGURE 6.4-5 Not Used N/A 6.4-6 FIGURE 6.4-6 Not Used N/A 6.4-7 FIGURE 6.4-7 Containment Spray Nozzle Performance Characteristics N/A 6.4-8 FIGURE 6.4-8 Containment Spray Pump Performance Characteristics.
N/A 6.4-9 FIGURE 6.4-9 Containment Heat Removal Systems Sink Schematic N/A 6.5-1 FIGURE 6.5-1 Containment Air Recirculation and Cooling Unit Fan Performance Curve N/A 6.5-2 FIGURE 6.5-2 Containment Air Recirculation and Cooling Unit Coil Performance Characteristics N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 18 of 49 6.6-1 FIGURE 6.6-1 Post-Incident Recirculation Fan Performance Characteristics N/A 6.7-3 FIGURE 6.7-3 Enclosure Building Filtration System Fan Performance Curve N/A 7.2-1 FIGURE 7.2-1 Reactor Protective System Block Diagram 7.2-2 FIGURE 7.2-2 Reactor Protective System Functional Diagram 25203-29193 (a) Sheet 1 7.2-3 FIGURE 7.2-3 Nuclear Instrumentation System Functional Diagram 7.2-4 FIGURE 7.2-4 Low Flow Protective System Functional Diagram 7.2-5 FIGURE 7.2-5 Low Steam Generator Pressure Reactor Trip Bypass Functional Diagram 7.2-6 FIGURE 7.2-6 Block Diagram Core Protection Trips 7.2-7 FIGURE 7.2-7 Neutron Flux Monitoring System Logarithmic Range Channels 7.2-8 FIGURE 7.2-8 Neutron Flux Monitoring System Power Range Channels 7.2-9 FIGURE 7.2-9 Not Used 7.2-10 FIGURE 7.2-10 Reactor Coolant Pump Underspeed Block Diagram 7.2-11 FIGURE 7.2-11 Variable High Power Trip Operation 7.2-12 FIGURE 7.2-12 Thermal Margin Trip 7.2-13 FIGURE 7.2-13 T Power Calculation 7.2-14 FIGURE 7.2-14 Local Power Density Trip LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 19 of 49 7.3-1 FIGURE 7.3-1 Engineered Safety Logic 25203-28150 (a) Sheet 1 7.3-2A FIGURE 7.3-2A Engineered Safety Logic Actuated Equipment Tabulation 25203-28150 (a) Sheet 2A 7.3-2B FIGURE 7.3-2B Engineered Safety Logic Actuated Equipment Tabulation 25203-28150 (a) Sheet 2B 7.3-2C FIGURE 7.3-2C Engineered Safety Logic Actuated Equipment Tabulation 25203-28150 (a) Sheet 2C 7.3-2D FIGURE 7.3-2D Engineered Safety Logic Actuated Equipment Tabulation 25203-28150 (a) Sheet 2D 7.3-3 FIGURE 7.3-3 Engineered Safety Logic Sequencer & Channel 5 Output 25203-28150 (a) Sheet 3 7.3-4 FIGURE 7.3-4 Engineered Safety Logic 25203-28150 (a) Sheet 4 7.4-1 FIGURE 7.4-1 Deleted by FSARCR 05-MP2-026 N/A 7.4-2 FIGURE 7.4-2 CEA Position Setpoints N/A 7.4-3 FIGURE 7.4-3 CEDS Functional Block Diagram 25203-29155 (a) Sheet 9 7.4-4 FIGURE 7.4-4 Pressure Control Program N/A 7.4-5 FIGURE 7.4-5 Steam Dump to Condensers and Turbine Bypass System N/A 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 1) 25203-39220 (a) Sheet 7A 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 2) 25203-39220 (a) Sheet 7B 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 3) 25203-39220 (a) Sheet 8A 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 4) 25203-39220 (a) Sheet 8B LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 20 of 49 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 5) 25203-39220 (a) Sheet 9A 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 6) 25203-39220 (a) Sheet 9B 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 7) 25203-39220 (a) Sheet 10A 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 8) 25203-39220 (a) Sheet 10B 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 9) 25203-39220 (a) Sheet 11A 7.4-6 FIGURE 7.4-6 Feedwater Control System (Sheet 10) 25203-39220 (a) Sheet 11B 7.4-7 FIGURE 7.4-7 Feedwater Regulating System Block Power Distribution N/A 7.4-8 FIGURE 7.4-8 Reactivity Control System N/A 7.4-9 FIGURE 7.4-9 Motion Inhibit Circuit Interconnection Simplified Diagram N/A 7.5-1 FIGURE 7.5-1 Pressurizer Pressure Measurement Channel Functional Diagram N/A 7.5-2 FIGURE 7.5-2 Out-Of-Core Nuclear Detector Location N/A 7.5-3 FIGURE 7.5-3 In-Core Nuclear Detector Assembly N/A 7.5-4 FIGURE 7.5-4 In-Core Detector/Core Exit Thermocouple and RVLM Sensor Locations N/A 7.5-5 FIGURE 7.5-5 Process Radiation Monitor Schematic N/A 7.5-6 FIGURE 7.5-6 Heated Junction Thermocouple Probe Assembly N/A 7.5-7 FIGURE 7.5-7 ICCMS Functional Block Diagram N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 21 of 49 7.5-8 FIGURE 7.5-8 ICCMS Data Processing N/A 7.5-9 FIGURE 7.5-9 ICCMS Display Hierarchy N/A 7.6-1 FIGURE 7.6-1 General Arrangement Control Room Plan Elevation 35 feet 6 inches 25203-27027 (a) 7.6-2 FIGURE 7.6-2 C01, CRP, Front View Arrangement Safeguards Section (Sheet 1) 25203-30208 (a) Sheet 1 of 4 7.6-2 FIGURE 7.6-2 C01, CRP, Front View Arrangement Safeguards Section (Sheet 2) 25203-30208 (a) Sheet 2 of 4 7.6-2 FIGURE 7.6-2 C01, CRP, Front View Arrangement Safeguards Section (Sheet 3) 25203-30208 (a) Sheet 3 of 4 7.6-2 FIGURE 7.6-2 C01, CRP, Front View Arrangement Safeguards Section (Sheet 4) 25203-30208 (a) Sheet 4 of 4 7.6-3 FIGURE 7.6-3 CRP Front View Arrangements (Sheet 1) 25203-30209 (a) Sheet 1 of 2 7.6-3 FIGURE 7.6-3 CRP Front View Arrangements (Sheet 2) 25203-30209 (a) Sheet 2 of 2 7.6-3 FIGURE 7.6-3 CRP Front View Arrangements (Sheet 3) 25203-30210 (a) Sheet 1 of 2 7.6-3 FIGURE 7.6-3 CRP Front View Arrangements (Sheet 4) 25203-30210 (a) Sheet 2 of 2 7.6-4 FIGURE 7.6-4 C04 CRP, Front View Arrangement Reactivity Control System (Sheet 1) 25203-30211 (a) Sheet 1 7.6-4 FIGURE 7.6-4 C04 CRP, Front View Arrangement Reactivity Control System (Sheet 2) 25203-30211 (a) Sheet 2 7.6-4 FIGURE 7.6-4 C04 CRP, Front View Arrangement Reactivity Control System (Sheet 3) 25203-30211 (a) Sheet 3 7.6-4 FIGURE 7.6-4 C04 CRP, Front View Arrangement Reactivity Control System (Sheet 4) 25203-30211 (a) Sheet 4 7.6-5 FIGURE 7.6-5 C05, CRP, Front View Arrangement Steam Generator & Feedwater Control (Sheets 1) 25203-30212 (a) Sheet 1 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 22 of 49 7.6-5 FIGURE 7.6-5 C05, CRP, Front View Arrangement Steam Generator & Feedwater Control (Sheet 2) 25203-30212 (a) Sheet 2 7.6-5 FIGURE 7.6-5 C05, CRP, Front View Arrangement Steam Generator & Feedwater Control (Sheet 3) 25203-30212 (a) Sheet 3 7.6-5 FIGURE 7.6-5 C05, CRP, Front View Arrangement Steam Generator & Feedwater Control (Sheet 4) 25203-30212 (a) Sheet 4 7.6-6 FIGURE 7.6-6 C06, CRP. Front View Arrangement Plant Auxiliary (Sheet 1) 25203-30213 (a) Sheet 1 of 2 7.6-6 FIGURE 7.6-6 C06, CRP. Front View Arrangement Plant Auxiliary (Sheet 2) 25203-30213 (a) Sheet 2 of 2 7.6-7 FIGURE 7.6-7 C07, Control Room Panel, Front View Arrangement Turbine-Generator (Sheet 1) 25203-30214 (a) Sheet 1 of 4 7.6-7 FIGURE 7.6-7 C07, Control Room Panel, Front View Arrangement Turbine-Generator (Sheet 2) 25203-30214 (a) Sheet 2 of 4 7.6-7 FIGURE 7.6-7 C07, Control Room Panel, Front View Arrangement Turbine-Generator (Sheet 3) 25203-30214 (a) Sheet 3 of 4 7.6-7 FIGURE 7.6-7 C07, Control Room Panel, Front View Arrangement Turbine-Generator (Sheet 4) 25203-30214 (a) Sheet 4 of 4 7.6-8 FIGURE 7.6-8 C08, CRP Front View Arrangement Station Service Electric (Sheet 1) 25203-30215 (a) Sheet 1 of 4 7.6-8 FIGURE 7.6-8 C08, CRP Front View Arrangement Station Service Electric (Sheet 2) 25203-30215 (a) Sheet 2 of 4 7.6-8 FIGURE 7.6-8 C08, CRP Front View Arrangement Station Service Electric (Sheet 3) 25203-30215 (a) Sheet 3 of 4 7.6-8 FIGURE 7.6-8 C08, CRP Front View Arrangement Station Service Electric (Sheet 4) 25203-30215 (a) Sheet 4 of 4 7.6-9 FIGURE 7.6-9 Local Control Panels (C60) & (C61) 25203-28006 (a) Sheet 1 of 3 7.6-10 FIGURE 7.6-10 Local Control Panels (C63) & (C21) 25203-28006 (a) Sheet 2 of 3 7.6-11 FIGURE 7.6-11 Engineered Safety Equipment Status Panel Layout (C01X) 25203-30071 (a)
LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 23 of 49 7.6-12 FIGURE 7.6-12 Condensate Demineralizer Waste Treating Panel CDX N/A 7.6-13 FIGURE 7.6-13 Condensate Demineralizer Waste Treating Panel CDX N/A 7.6-14 FIGURE 7.6-14 Condensate Demineralizer Waste Treating Panel CDX N/A 7.6-15 FIGURE 7.6-15 Condensate Demineralizer Waste Treating Panel CDX N/A 7.9-1 FIGURE 7.9-1 Logic Diagram - Anticipated Transient Without Scram 25203-28105 (a) Sheet 36 7.9-2 FIGURE 7.9-2 Block Diagram Diverse SCRAM System (ATWS) 25203-37005 (a) Sheet 105 7.9-3 FIGURE 7.9-3 Schematic Diagram Diverse SCRAM System ATWS 25203-32012 (a) Sheet 48 7.10-1 FIGURE 7.10-1 Piping and Instrumentation Diagram Auxiliary Steam and Condensate 25203-26026 (a) Sheet 2 of 5 8.1-1A FIGURE 8.1-1A Deleted by FSARCR MP2-UCR-2016-007 N/A 8.1-1B FIGURE 8.1-1B Hunts Brook Junction N/A 8.1-1C FIGURE 8.1-1C 345 kV Transmission Map of Connecticut and Western Massachusetts N/A 8.1-1D FIGURE 8.1-1D 345 kV Switchyard N/A 8.2-1 FIGURE 8.2-1 Main Single Line Diagram 25203-30001 (a) 8.3-1 FIGURE 8.3-1 Logic Diagrams Diesel Generators (Sheet A) 25203-30034 (a) Sheet 1 8.3-1 FIGURE 8.3-1 Logic Diagrams Diesel Generators (Sheet B) 25203-30034 (a) Sheet 2 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 0A) 25203-32041 (a) Sheet A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 24 of 49 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 1) 25203-32041 (a) Sheet 1 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 1A) 25203-32041 (a) Sheet 1A 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 2) 25203-32041 (a) Sheet 2 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 2A) 25203-32041 (a) Sheet 2A 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 3) 25203-32041 (a) Sheet 3 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 4) 25203-32041 (a) Sheet 4 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 5) 25203-32041 (a) Sheet 5 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 6) 25203-32041 (a) Sheet 6 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 7) 25203-32041 (a) Sheet 7 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 8) 25203-32041 (a) Sheet 8 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 9) 25203-32041 (a) Sheet 9 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 10) 25203-32041 (a) Sheet 10 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 11) 25203-32041 (a) Sheet 11 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 12) 25203-32041 (a) Sheet 12 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 13) 25203-32041 (a) Sheet 13 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 14) 25203-32041 (a) Sheet 14 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 25 of 49 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 15) 25203-32041 (a) Sheet 15 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 16) 25203-32041 (a) Sheet 16 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 17) 25203-32041 (a) Sheet 17 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 18) 25203-32041 (a) Sheet 18 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 19) 25203-32041 (a) Sheet 19 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 20) 25203-32041 (a) Sheet 20 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 21) 25203-32041 (a) Sheet 21 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 22) 25203-32041 (a) Sheet 22 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 23) 25203-32041 (a) Sheet 23 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 24) 25203-32041 (a) Sheet 24 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 25) 25203-32041 (a) Sheet 25 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 26) 25203-32041 (a) Sheet 26 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 27) 25203-32041 (a) Sheet 27 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 28) 25203-32041 (a) Sheet 28 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 29) 25203-32041 (a) Sheet 29 8.3-2 FIGURE 8.3-2 Diesel Generator Related (Sheet 30) 25203-32041 (a) Sheet 30 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 26 of 49 8.3-3 FIGURE 8.3-3 Not Used 8.3-4 FIGURE 8.3-4 Diesel Generator Fuel Oil System/Auxiliary Steam Condensate and Heater Index (Sheets 1) 25203-26010 (a) Sheet 1 of 1 8.3-4 FIGURE 8.3-4 Diesel Generator Fuel Oil System/Auxiliary Steam Condensate and Heater Index (Sheet 2) 25203-26026 (a) Sheet 3 of 5 8.3-4 FIGURE 8.3-4 Diesel Generator Fuel Oil System/Auxiliary Steam Condensate and Heater Index (Sheet 3) 25203-26026 (a) Sheet 4 of 5 8.3-5 FIGURE 8.3-5 Diesel Generators' Ancillary Systems (Sheet 1A) 25203-26018 (a) Sheet 4 of 5 8.3-5 FIGURE 8.3-5 Diesel Generators' Ancillary Systems (Sheet 1B) 25203-26018 (a) Sheet 5 of 5 8.3-5 FIGURE 8.3-5 Diesel Generators' Ancillary Systems (Sheet 2) 25203-26018 (a) Sheet 2 of 5 8.3-5 FIGURE 8.3-5 Diesel Generators' Ancillary Systems (Sheet 3) 25203-26018 (a) Sheet 3 of 5 8.4-1 FIGURE 8.4-1 Charging Pump - Power Supply Crossover P18B 25203-32009 (a) Sheet 42 8.4-2 FIGURE 8.4-2 Service Water Strainer ML1B Power Supply Crossover Scheme 25203-32013 (a) Sheet 39 8.5-1 FIGURE 8.5-1 Single Line Diagram 125 VDC / VAC Systems (Sheet 1) 25203-30024 (a) 8.5-1 FIGURE 8.5-1 Single Line Diagram 125 VDC / VAC Systems (Sheet 2) 25203-30023 (a) 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 1) 25203-32045 (a) Sheet 1 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 2) 25203-32045 (a) Sheet 2 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 3) 25203-32045 (a) Sheet 3 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 4) 25203-32045 (a) Sheet 4 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 27 of 49 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 5) 25203-32045 (a) Sheet 5 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 6) 25203-32045 (a) Sheet 6 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 7) 25203-32045 (a) Sheet 7 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 8) 25203-32045 (a) Sheet 8 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 9) 25203-32045 (a) Sheet 9 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 10A) 25203-32045 (a) Sheet 10A 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 10B) 25203-32045 (a) Sheet 10B 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 10C) 25203-32045 (a) Sheet 10C 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 10D) 25203-32045 (a) Sheet 10D 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 11) 25203-32045 (a) Sheet 11 8.5-2 FIGURE 8.5-2 Reactor Trip Switchgear Circuit Breaker Control Circuitry (Sheet 12) 25203-32045 (a) Sheet 12 8.7-1 FIGURE 8.7-1 Raceway Plans (Sheet 1) 25203-34060 (a) 8.7-1 FIGURE 8.7-1 Raceway Plan Cable Vault Area -6, Elevation 25 Feet 6 Inches (Sheet 2) 25203-34031 (a) 8.7-1 FIGURE 8.7-1 Raceway Plan Cable Vault Area -7, Elevation 25 Feet 6 Inches (Sheet 3) 25203-34032 (a) 8.7-1 FIGURE 8.7-1 Raceway Plan Containment Area Elevation 14 Feet 6 Inches (Sheets 4) 25203-34042 (a) 9.0-1 FIGURE 9.0-1 P&ID Legend 25203-26001 (a) Sheet 1 of 3 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 28 of 49 9.0-2 FIGURE 9.0-2 P&ID Legend 25203-26001 (a) Sheet 2 of 3 9.0-3 FIGURE 9.0-3 General Legend Notes N/A 9.2-1 FIGURE 9.2-1 Chemical and Volume Control System Flow Schematic (Normal Operation)
N/A 9.2-2 FIGURE 9.2-2 P&IDs: Charging; Deborating; Purification; Boric Acid Systems (Sheet 1) 25203-26017 (a) Sheet 1 of 3 9.2-2 FIGURE 9.2-2 P&IDs: Charging; Deborating; Purification; Boric Acid Systems (Sheet 2) 25203-26017 (a) Sheet 2 of 3 9.2-2 FIGURE 9.2-2 P&IDs: Charging; Deborating; Purification; Boric Acid Systems (Sheet 3) 25203-26017 (a) Sheet 3 of 3 9.3-1 FIGURE 9.3-1 Shutdown Cooling Flow Diagram N/A 9.4-1 FIGURE 9.4-1 P&ID RBCCW System RBCCW Pumps and Heat Exchangers 25203-26022 (a) Sheet 1 of 6 9.4-2 FIGURE 9.4-2 RBCCW System Spent Fuel Pool and Shutdown Heat Exchangers 25203-26022 (a) Sheet 2 of 6 9.4-3 FIGURE 9.4-3 P&ID RBCCW. System Containment Spray Pump and Safety Injection Pump Seal Coolers 25203-26022 (a) Sheet 3 of 6 9.4-4 FIGURE 9.4-4 P&ID RBCCW. System Reactor Coolant Pump, Thermal Barriers and Lube Oil Coolers 25203-26022 (a) Sheet 4 of 6 9.4-5 FIGURE 9.4-5 P&ID RBCCW. System Containment Air Recirculation and Coolant Unit 25203-26022 (a) Sheet 5 of 6 9.4-6 FIGURE 9.4-6 P&ID Diagram RBCCW. System Reactor Vessel Support Concrete Cooling Coils 25203-26022 (a) Sheet 6 of 6 9.4-7 FIGURE 9.4-7 Reactor Building Closed Cooling Water Pump Performance Curve N/A 9.5-1 FIGURE 9.5-1 P&ID Spent Fuel Pool Cleaning and Cleanup System (Sheet 1) 25203-26023 (a) Sheet 1 of 2 9.5-1 FIGURE 9.5-1 P&ID Spent Fuel Pool Cleaning and Cleanup System (Sheet 2) 25203-26023 (a) Sheet 2 of 2 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET 15-19
MPS2 UFSAR LOEF 29 of 49 9.5-2 FIGURE 9.5-2 Spent Fuel Pool Pump Performance Curve N/A 9.6-1 FIGURE 9.6-1 P&ID Diagram Sampling System 25203-26025 (a) Sheet 1 of 4 9.6-2 FIGURE 9.6-2 P&ID Diagram Sampling System 25203-26025 (a) Sheet 2 of 4 9.6-3 FIGURE 9.6-3 P&ID Diagram Sampling System 25203-26025 (a) Sheet 3 of 4 9.6-4 FIGURE 9.6-4 P&ID Post Accident Sampling System Reactor Coolant Sample 25203-26074 (a) Sheet 1 of 2 9.6-5 FIGURE 9.6-5 P&ID Post Accident Sampling System Containment Air Sample 25203-26074 (a) Sheet 2 of 2 9.7-1 FIGURE 9.7-1 P&IDs - Circulating Water, Service Water, Screen Wash, Sodium Hypochlorite (Sheet 1) 25203-26008 (a) Sheet 1 of 4 9.7-1 FIGURE 9.7-1 P&IDs - Circulating Water, Service Water, Screen Wash, Sodium Hypochlorite (Sheet 2) 25203-26008 (a) Sheet 2 of 4 9.7-1 FIGURE 9.7-1 P&IDs - Circulating Water, Service Water, Screen Wash, Sodium Hypochlorite (Sheet 3) 25203-26008 (a) Sheet 3 of 4 9.7-1 FIGURE 9.7-1 P&IDs - Circulating Water, Service Water, Screen Wash, Sodium Hypochlorite (Sheet 4) 25203-26008 (a) Sheet 4 of 4 9.7-2 FIGURE 9.7-2 P&ID TBCCW System (Sheet 1) 25203-26007 (a) Sheet 1 of 3 9.7-2 FIGURE 9.7-2 P&ID TBCCW System (Sheet 2) 25203-26007 (a) Sheet 2 of 3 9.7-2 FIGURE 9.7-2 P&ID TBCCW System (Sheet 3) 25203-26007 (a) Sheet 3 of 3 9.7-3 FIGURE 9.7-3 Typical Service Water Pump Certified Test Curve N/A 9.7-4 FIGURE 9.7-4 Deleted by FSARCR 03-MP2-011 N/A 9.8-1 FIGURE 9.8-1 Plan of New Fuel Storage Racks N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 30 of 49 9.8-2 FIGURE 9.8-2 New Fuel Storage Racks - Section A-A N/A 9.8-3 FIGURE 9.8-3 New Fuel Storage Rack Assembly (8 Rack Module) 25203-13013 (a) Sheet 14 9.8-4 FIGURE 9.8-4 New Fuel Storage Rack Assembly (4 Rack Module) 25203-13013 (a) Sheet 19 9.8-5 FIGURE 9.8-5 Storage Rack N/A 9.8-6 FIGURE 9.8-6 Closure Bar New Fuel Storage Racks 25203-13013 (a) Sheet 10 9.8-7 FIGURE 9.8-7 Fuel Pool Arrangement - Four Region N/A 9.8-8A FIGURE 9.8-8A Typical Spent Fuel Rack Module/Poison Box - Regions 1 and 2 N/A 9.8-8B FIGURE 9.8-8B Typical Spent Fuel Rack Module/Regions 3 and 4 N/A 9.8-8C FIGURE 9.8-8C Poison Box (Boraflex poison no longer credited)
N/A 9.8-8D FIGURE 9.8-8D Adjustable Foot N/A 9.8-9 FIGURE 9.8-9 Collector Leak Channel Plan at Base of Walls N/A 9.8-10 FIGURE 9.8-10 Refueling Equipment Arrangement N/A 9.8-11 FIGURE 9.8-11 Refueling Machine N/A 9.8-12 FIGURE 9.8-12 Deleted by PKG FSC MP2-UCR-2009-006 N/A 9.8-13 FIGURE 9.8-13 Reactor Vessel Head Lifting Rig N/A 9.8-14 FIGURE 9.8-14 Core Support Barrel Lifting Rig N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 31 of 49 9.8-15 FIGURE 9.8-15 Upper Guide Structure Lifting Rig N/A 9.8-16 FIGURE 9.8-16 Surveillance Capsule Retrieval Tool N/A 9.8-17 FIGURE 9.8-17 Spent Fuel Pool Platform Crane N/A 9.8-18 FIGURE 9.8-18 Spent Fuel Pool Platform Crane Travel Limits N/A 9.8-19 FIGURE 9.8-19 Spent Fuel Cask Crane 25203-29022 (a) 169 9.8-20 FIGURE 9.8-20 Heated Junction Thermocouple Handling Canister N/A 9.9-1 FIGURE 9.9-1 P&ID Containment and Enclosure Building Ventilation 25203-26028 (a) Sheet 1 of 6 9.9-2 FIGURE 9.9-2 Ventilation P&IDs (Sheet 1) 25203-26028 (a) Sheet 2 of 6 9.9-2 FIGURE 9.9-2 Ventilation P&IDs (Sheet 2) 25203-26028 (a) Sheet 3 of 6 9.9-2 FIGURE 9.9-2 Ventilation P&IDs (Sheet 3) 25203-26028 (a) Sheet 4 of 6 9.9-2 FIGURE 9.9-2 Ventilation P&IDs (Sheet 4) 25203-26028 (a) Sheet 5 of 6 9.9-3 FIGURE 9.9-3 P&ID Auxiliary Building Ventilation System (Sheet 1) 25203-26029 (a) Sheet 1 of 7 9.9-3 FIGURE 9.9-3 P&ID Auxiliary Building Ventilation System (Sheet 2) 25203-26029 (a) Sheet 2 of 7 9.9-3 FIGURE 9.9-3 P&ID Auxiliary Building Ventilation System (Sheet 3) 25203-26029 (a) Sheet 3 of 7 9.9-4 FIGURE 9.9-4 P&ID HVAC System Turbine Building, Intake Structure, Warehouse and Diesel Generator Rooms 25203-26027 (a) Sheet 1 9.9-4A FIGURE 9.9-4A P&ID Control Room Air Conditioning System 25203-26027 (a) Sheet 3 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 32 of 49 9.9-5 FIGURE 9.9-5 Control Element Drive Mechanism (CEDM) Fan Performance Curve N/A 9.9-6 FIGURE 9.9-6 Containment Purge Fan Performance Curve N/A 9.9-7 FIGURE 9.9-7 Containment Auxiliary Circulation Fan Performance Curve N/A 9.9-8 FIGURE 9.9-8 Containment Penetration Cooling Fan Performance Curve N/A 9.9-9 FIGURE 9.9-9 Radwaste Ventilation Fan Performance Curve N/A 9.9-10 FIGURE 9.9-10 Logic Diagram Radwaste Area Supply Fan 25203-28129 (a) Sheet 22 9.9-11 FIGURE 9.9-11 Non-Radioactive Supply Fan Performance Curve N/A 9.9-12 FIGURE 9.9-12 Non-Radioactive Exhaust Fan Performance Curve N/A 9.9-13 FIGURE 9.9-13 Battery Room Exhaust Fan Performance Curve N/A 9.9-14 FIGURE 9.9-14 Cable Vault Transfer Fan Performance Curve N/A 9.9-15 FIGURE 9.9-15 Engineered Safety Features Room Fan Performance Curve N/A 9.9-16 FIGURE 9.9-16 Fuel Handling Supply Fan Performance Curve N/A 9.9-17 FIGURE 9.9-17 Deleted N/A 9.9-18 FIGURE 9.9-18 Main Exhaust Fan Performance Curve N/A 9.9-19 FIGURE 9.9-19 Control Room Air Conditioning Fan Performance Curve N/A 9.9-20 FIGURE 9.9-20 Air Cooled Condenser Fan Performance Curve N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 33 of 49 9.9-21 FIGURE 9.9-21 Control Room Exhaust Fan Performance Curve N/A 9.9-22 FIGURE 9.9-22 Control Room Filtration System Fan Performance Curve N/A 9.9-23 FIGURE 9.9-23 Diesel Generator Room Supply Fan Performance Curve N/A 9.9-24 FIGURE 9.9-24 Diesel Generator Fan Performance Curve N/A 9.9-25 FIGURE 9.9-25 Turbine Building Supply Fan Performance Curve N/A 9.9-26 FIGURE 9.9-26 Turbine Building Exhaust Fan Performance Curve N/A 9.9-27 FIGURE 9.9-27 Electrical Room Supply Fan Performance Curve N/A 9.9-28 FIGURE 9.9-28 Access Control Area Air Conditioning Fan Performance Curve N/A 9.9-29 FIGURE 9.9-29 Deleted N/A 9.9-30 FIGURE 9.9-30 Deleted N/A 9.9-31 FIGURE 9.9-31 P&ID Turbine Building, Intake Structure, Warehouse and Diesel Generator Room Chilled Water System 25203-26027 (a) Sheet 2 9.10-1 FIGURE 9.10-1 Deleted N/A 9.10-2 FIGURE 9.10-2 P&ID Domestic Water (Sheet 1) 25203-26011 (a) Sheet 1 of 7 9.10-2 FIGURE 9.10-2 P&ID Domestic Water (Sheet 2) 25203-26011 (a) Sheet 2 of 7 9.11-1 FIGURE 9.11-1 P&ID Instrument Air System Compressors F-3E and F-3F 25203-26009 (a) Sheet 1 9.11-2 FIGURE 9.11-2 P&ID Instrument Air System Compressors F-3D 25203-26009 (a) Sheet 9 of 10 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 34 of 49 9.12-1 FIGURE 9.12-1 P&ID Diagram Water Treatment System 25203-26030 (a) Sheet 1 of 1 9.13-1 FIGURE 9.13-1 P&ID Auxiliary Steam and Condensate (Sheet 1) 25203-26026 (a) Sheet 1 of 5 9.13-1 FIGURE 9.13-1 P&ID Auxiliary Steam and Condensate (Sheet 2) 25203-26026 (a) Sheet 2 of 5 9.13-1 FIGURE 9.13-1 P&ID Auxiliary Steam and Condensate (Sheet 3) 25203-26026 (a) Sheet 3 of 5 9.13-1 FIGURE 9.13-1 P&ID Auxiliary Steam and Condensate (Sheet 4) 25203-26026 (a) Sheet 4 of 5 10.1-1 FIGURE 10.1-1 Deleted by FSARCR 03-MP2-007]
N/A 10.1-2 FIGURE 10.1-2 Deleted by FSARCR 03-MP2-007 N/A 10.3-1 FIGURE 10.3-1 P&ID Main Steam from Generators (25203-26002 Sheet 1) 25203-26002 (a) Sheet 1 of 5 10.3-1 FIGURE 10.3-1 P&ID Main Steam Generator Blowdown System (25203-26002 Sheet 2) 25203-26002 (a) Sheet 2 of 5 10.3-1 FIGURE 10.3-1 P&ID Main Steam Turbine and Reheater 1A (25203-26002 Sheet 3) 25203-26002 (a) Sheet 3 of 5 10.3-1 FIGURE 10.3-1 P&ID Main Steam Turbine (25203-26002 Sheet 4) 25203-26002 (a) Sheet 4 of 5 10.4-1 FIGURE 10.4-1 P&ID Condenser Air Removal Water Box Priming and Turbine Building Sump (25203-26012) 25203-26012 (a) 10.4-2 FIGURE 10.4-2 P&ID Condensate System (25203-26005 Sheet 2) 25203-26005 (a) Sheet 1 of 4 10.4-2 FIGURE 10.4-2 P&ID Condensate Storage and Auxiliary Feed (25203-26005 Sheet 3) 25203-26005 (a) Sheet 2 of 4 10.4-2 FIGURE 10.4-2 P&ID Condensate Storage and Auxiliary Feed (25203-26005 Sheet 4) 25203-26005 (a) Sheet 3 of 4 10.4-2 FIGURE 10.4-2 P&ID Condensate System (25203-26005 Sheet 1) 25203-26005 (a) Sheet 4 of 4 LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 35 of 49 11.1-1 FIGURE 11.1-1 P&ID Clean Liquid Radwaste System 25203-26020 (a) Sheet 1 of 5 11.1-2 FIGURE 11.1-2 P&ID Clean Liquid Radwaste System 25203-26020 (a) Sheet 2 of 5 11.1-3 FIGURE 11.1-3 P&ID Drains (Containment & Auxiliary Building and Auxiliary Yard Sump) (Sheet 1) 25203-26024 (a) Sheet 1 11.1-3 FIGURE 11.1-3 P&ID Drains (Containment & Auxiliary Building and Auxiliary Yard Sump) (Sheet 2) 25203-26024 (a) Sheet 2 11.1-3 FIGURE 11.1-3 P&ID Drains (Containment & Auxiliary Building and Auxiliary Yard Sump) (Sheet 3) 25203-26024 (a) Sheet 3 11.1-4 FIGURE 11.1-4 P&ID Aerated Liquid Radwaste System 25203-26021 (a) Sheet 1 of 3 11.1-5 FIGURE 11.1-5 P&ID Diagram Gaseous Radwaste System 25203-26021 (a) Sheet 2 of 3 11.1-6 FIGURE 11.1-6 Degasifier Performance Curve N/A 11.1-7 FIGURE 11.1-7 P&ID Spent Resin Radwaste System 25203-26021 (a) Sheet 3 of 3 11.2-1 FIGURE 11.2-1 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment and Auxiliary Building -
Elevation (-) 45 Feet 6 Inches 25203-17001 (a) 11.2-2 FIGURE 11.2-2 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment and Auxiliary Building -
Elevation (-) 29 Feet 6 Inches 25203-17002 (a) 11.2-3 FIGURE 11.2-3 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment and Auxiliary Building -
Elevation (-) 5 Feet 0 Inches 25203-17003 (a) 11.2-4 FIGURE 11.2-4 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment Building - Elevation 14 Feet 6 Inches and 38 Feet 6 Inches 25203-17004 (a) 11.2-5 FIGURE 11.2-5 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Auxiliary Building - Elevation 14 Feet 6 Inches and 25 Feet 6 Inches 25203-17005 (a) 11.2-6 FIGURE 11.2-6 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Turbine Building - Elevation 14 Feet 6 Inches 25203-17006 (a) 11.2-7 FIGURE 11.2-7 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Auxiliary Building - Elevation 36 Feet 6 Inches 25203-17007 (a)
LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 36 of 49 11.2-8 FIGURE 11.2-8 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment and Auxiliary Building -
Section A-A 25203-17008 (a) 11.2-9 FIGURE 11.2-9 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment and Auxiliary Building -
Section B-B 25203-17009 (a) 11.2-10 FIGURE 11.2-10 P&ID, Radiation Zones and Access Control Normal Operation With 1.0% Failed Fuel Containment and Auxiliary 25203-17010 (a) 11.2-11 FIGURE 11.2-11 Neutron Shield Segment N/A 11.2-12 FIGURE 11.2-12 Neutron Shielding - Sectional View N/A 11.2-13 FIGURE 11.2-13 Not Used N/A 11.2-14 FIGURE 11.2-14 Not Used N/A 11.2-15 FIGURE 11.2-15 Neutron Shield - Thermal Loadings (Typical Annular Section)
N/A 11.2-16 FIGURE 11.2-16 Neutron Shield - Thermal Loadings (Plug Shield Section)
N/A 11.B-1 FIGURE 11.B-1 NUREG-0017 Gale Code Input Diagram - Liquid Waste System N/A 11.B-2 FIGURE 11.B-2 NUREG-0017 Gale Code Input Diagram - Airborne N/A 13.2-1 FIGURE 13.2-1 Millstone Nuclear Power Station Organization Diagram During Initial Startup N/A 13.2-2 FIGURE 13.2-2 Startup Group Organization N/A 14.0.4-1 FIGURE 14.0.4-1 RCS Cold Leg Temperature as a Function of Power N/A 14.0.4-2 FIGURE 14.0.4-2 Not Used N/A 14.0.4-3 FIGURE 14.0.4-3 Not Used N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 37 of 49 14.0.4-4 FIGURE 14.0.4-4 Not Used N/A 14.0.4-5 FIGURE 14.0.4-5 Not Used N/A 14.0.4-6 FIGURE 14.0.4-6 Not Used N/A 14.0.4-7 FIGURE 14.0.4-7 Linear Heat Rate Limiting Condition for Operation used in Local Power Density Limiting Condition for Operation Verification N/A 14.0.7-1 FIGURE 14.0.7-1 Verification of Local Power Density Limiting Safety System Setting N/A 14.0.7-2 FIGURE 14.0.7-2 Thermal Margin/Low Pressure Trip Function A1 N/A 14.0.7-3 FIGURE 14.0.7-3 Thermal Margin/Low Pressure Trip Function QR1 N/A 14.0.7-4 FIGURE 14.0.7-4 Not Used N/A 14.0.7-5 FIGURE 14.0.7-5 Verification of the Departure from Nucleate Boiling Limiting Condition for Operation N/A 14.0.7-6 FIGURE 14.0.7-6 Verification of Local Power Density Limiting Condition for Operation N/A 14.0.7-7 FIGURE 14.0.7-7 Linear Heat Rate Limiting Condition of Operation Used in Local Power Density Limiting Condition of Operation Verification N/A 14.1.3-1 FIGURE 14.1.3-1 Normalized Power and Heat Flux for the Increase in Steam Flow Event N/A 14.1.3-2 FIGURE 14.1.3-2 Reactivity Feedback for the Increase in Steam Flow Event N/A 14.1.3-3 FIGURE 14.1.3-3 Reactor Coolant Temperatures for Increase in Steam Flow Event N/A 14.1.3-4 FIGURE 14.1.3-4 Core Inlet Mass Flow Rate for the Increase in Steam Flow Event N/A 14.1.3-5 FIGURE 14.1.3-5 Pressurizer Pressure for the Increase in Steam Flow Event N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 38 of 49 14.1.3-6 FIGURE 14.1.3-6 Steam Generator Pressures for the Increase in Steam Flow Event N/A 14.1.3-7 FIGURE 14.1.3-7 Steam Mass Flow Rates for the Increase in Steam Flow Event N/A 14.1.3-8 FIGURE 14.1.3-8 Main Feedwater Flow for the Increase in Steam Flow Event N/A 14.1.3-9 FIGURE 14.1.3-9 Main Feedwater Temperature for the Increase in Steam Flow Event N/A 14.1.5.1-1 FIGURE 14.1.5.1-1 Normalized Core Power (0.20 ft2 Asymmetric Break Inside Containment)
N/A 14.1.5.1-2 FIGURE 14.1.5.1-2 Core Inlet Temperatures (0.20 ft2 Asymmetric Break Inside Containment)
N/A 14.1.5.1-3 FIGURE 14.1.5.1-3 Reactivity Feedback (0.20 ft2 Asymmetric Break Inside Containment)
N/A 14.1.5.1-4 FIGURE 14.1.5.1-4 Pressurizer Pressure (0.20 ft2 Asymmetric Break Inside Containment)
N/A 14.1.5.1-5 FIGURE 14.1.5.1-5 Steam Generator Pressures (0.20 ft2 Asymmetric Break Inside Containment)
N/A 14.1.5.1-6 FIGURE 14.1.5.1-6 Steam Mass Flow Rates (0.20 ft2 Asymmetric Break Inside Containment)
N/A 14.1.5.1-7 FIGURE 14.1.5.1-7 Normalized Power and Heat Flux (Asymmetric 3.51 ft2 Break Inside Containment with Loss of Offsite Power)
N/A 14.1.5.1-8 FIGURE 14.1.5.1-8 Reactor Coolant Temperatures (Asymmetric 3.51 ft2 Break Inside Containment with Loss of Offsite Power)
N/A 14.1.5.1-9 FIGURE 14.1.5.1-9 Normalized Reactor Coolant System Flow Rate (Asymmetric 3.51 ft2 Break Inside Containment with Loss of Offsite Power)
N/A 14.1.5.1-10 FIGURE 14.1.5.1-10 Pressurizer Pressure (Asymmetric 3.51 ft2 Break Inside Containment with Loss of Offsite Power)
N/A 14.1.5.1-11 FIGURE 14.1.5.1-11 Steam Generator Pressures (Asymmetric 3.51 ft2 Break Inside Containment with Loss of Offsite Power)
N/A 14.1.5.2-1 FIGURE 14.1.5.2-1 One Pump High Pressure Safety Injection System Delivery vs. Primary Pressure (Post-Scram Steam Line Break)
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 39 of 49 14.1.5.2-2 FIGURE 14.1.5.2-2 Steam Generator Break Flow (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-3 FIGURE 14.1.5.2-3 Steam Generators' Secondary Pressures (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-4 FIGURE 14.1.5.2-4 Core Inlet Temperatures (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-5 FIGURE 14.1.5.2-5 Pressurizer Pressure (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-6 FIGURE 14.1.5.2-6 Pressurizer Level (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-7 FIGURE 14.1.5.2-7 Steam Generators' Secondary Mass (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-8 FIGURE 14.1.5.2-8 Reactivity Components (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-9 FIGURE 14.1.5.2-9 Reactor Power (HZP Post-Scram Steam Line Outside Containment Break with Offsite Power Available)
N/A 14.1.5.2-10 FIGURE 14.1.5.2-10 Steam Generator Break Flow (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.1.5.2-11 FIGURE 14.1.5.2-11 Steam Generators' Secondary Pressures (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.1.5.2-12 FIGURE 14.1.5.2-12 Core Inlet Temperatures (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.1.5.2-13 FIGURE 14.1.5.2-13 Pressurizer Pressure (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.1.5.2-14 FIGURE 14.1.5.2-14 Pressurizer Level (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.1.5.2-15 FIGURE 14.1.5.2-15 Reactivity Components (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.1.5.2-16 FIGURE 14.1.5.2-16 Reactor Power (HZP Post-Scram Steam Line Outside Containment Break with Loss of Offsite Power)
N/A 14.2.1-1 FIGURE 14.2.1-1 Reactor Power Level for Loss of External Load (Primary Overpressurization Case)
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 40 of 49 14.2.1-2 FIGURE 14.2.1-2 Core Average Heat Flux for Loss of External Load (Primary Overpressurization Case)
N/A 14.2.1-3 FIGURE 14.2.1-3 Reactor Coolant System Temperatures for Loss of External Load (Primary Overpressurization Case)
N/A 14.2.1-4 FIGURE 14.2.1-4 Primary System Pressures for Loss of External Load (Primary Overpressurization Case)
N/A 14.2.1-5 FIGURE 14.2.1-5 Total Reactivity for Loss of External Load (Primary Overpressurization Case)
N/A 14.2.1-6 FIGURE 14.2.1-6 Reactor Power Level for Loss of External Load (Secondary Overpressurization Case)
N/A 14.2.1-7 FIGURE 14.2.1-7 Core Average Hot Flux for Loss of External Load (Secondary Overpressurization Case)
N/A 14.2.1-8 FIGURE 14.2.1-8 Reactor Coolant System Temperatures for Loss of External Load (Secondary Overpressurization Case)
N/A 14.2.1-9 FIGURE 14.2.1-9 Pressurizer Pressure for Loss of External Load (Secondary Overpressurization Case)
N/A 14.2.1-10 FIGURE 14.2.1-10 Total Reactivity for Loss of External Load (Secondary Overpressurization Case)
N/A 14.2.1-11 FIGURE 14.2.1-11 Maximum Secondary System Pressures for Loss of External Load (Secondary Overpressurization Case)
N/A 14.2.1-12 FIGURE 14.2.1-12 Reactor Power Level for Loss of External Load (MDNBR Case)
N/A 14.2.1-13 FIGURE 14.2.1-13 Normalized Heat Flux for Loss of External Load (MDNBR Case)
N/A 14.2.1-14 FIGURE 14.2.1-14 Reactor Coolant System Temperature for Loss of External Load (MDNBR Case)
N/A 14.2.1-15 FIGURE 14.2.1-15 Pressurizer Pressure for Loss of External Load (MDNBR Case)
N/A 14.2.1-16 FIGURE 14.2.1-16 Total Reactivity for Loss of External Load (MDNBR Case)
N/A 14.2.1-17 FIGURE 14.2.1-17 Maximum Secondary System Pressure for Loss of External Load (MDNBR Case)
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 41 of 49 14.2.4-1 FIGURE 14.2.4-1 Reactor Power Level for MSIV Closure (Lower Steam Flow Case)
N/A 14.2.4-2 FIGURE 14.2.4-2 Reactor Coolant System Temperatures for MSIV Closure (Lower Steam Flow Case)
N/A 14.2.4-3 FIGURE 14.2.4-3 Pressurizer Pressure for MSIV Closure (Lower Steam Flow Case)
N/A 14.2.4-4 FIGURE 14.2.4-4 Isolated Steam Generator Pressure at Bottom of Boiler Region for MSIV Closure (Lower Steam Flow Case)
N/A 14.2.4-5 FIGURE 14.2.4-5 Open MSIV Steam Generator Steam Dome Pressure for MSIV Closure (Lower Steam Flow Case)
N/A 14.2.7-1 FIGURE 14.2.7-1 Reactor Coolant System Loop Temperatures for Minimum Steam Generator Inventory Case: Offsite Power Available, B Motor-Driven AFW Pump Fails to Start N/A 14.2.7-2 FIGURE 14.2.7-2 Steam Generator Dome Pressure for Minimum Steam Generator Inventory Case: Offsite Power Available, B Motor-Driven AFW Pump Fails to Start N/A 14.2.7-3 FIGURE 14.2.7-3 Pressurizer Level for Minimum Steam Generator Inventory Case: Offsite Power Available, B Motor-Driven AFW Pump Fails to Start N/A 14.2.7-4 FIGURE 14.2.7-4 Steam Generator for Liquid Mass Inventory for Minimum Steam Generator Inventory Case: Offsite to Power Available, B Motor-Driven AFW Pump Fails to Start N/A 14.2.7-5 FIGURE 14.2.7-5 Steam Generator Collapsed Liquid Level for Minimum Steam Generator Inventory Case: Offsite to Power Available, B Motor-Driven AFW Pump Fails to Start N/A 14.2.7-6 FIGURE 14.2.7-6 Reactor Coolant System Loop Temperatures for Maximum Pressurizer Level Case: Loss of Offsite Power, One Motor-Driven AFW Pump Fails to Start N/A 14.2.7-7 FIGURE 14.2.7-7 Steam Generator Dome Pressure for Maximum Pressurizer Level Case: Loss of Offsite Power, One Motor-Driven AFW Pump Fails to Start N/A 14.2.7-8 FIGURE 14.2.7-8 Pressurizer Level for Maximum Pressurizer Level Case: Loss of Offsite Power, One Motor-Driven AFW Pump Fails to Start N/A 14.2.7-9 FIGURE 14.2.7-9 Steam Generator Liquid Mass Inventory for Maximum Pressurizer Level Case: Loss of Offsite Power, One Motor-Driven AFW Pump Fails to Start N/A 14.2.7-10 FIGURE 14.2.7-10 Steam Generator Collapsed Liquid Level for Maximum Pressurizer Level Case: Loss of Offsite Power, One Motor-Driven AFW Pump Fails to Start N/A 14.3.1-1 FIGURE 14.3.1-1 Reactor Power Level for Loss of Forced Reactor Coolant Flow N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 42 of 49 14.3.1-2 FIGURE 14.3.1-2 Core Average Heat Flux for Loss of Forced Reactor Coolant Flow N/A 14.3.1-3 FIGURE 14.3.1-3 Reactor Coolant System Temperature for Loss of Forced Reactor Coolant Flow N/A 14.3.1-4 FIGURE 14.3.1-4 Pressurizer Pressure for Loss of Forced Reactor Coolant Flow N/A 14.3.1-5 FIGURE 14.3.1-5 Reactivities for Loss of Forced Reactor Coolant Flow N/A 14.3.1-6 FIGURE 14.3.1-6 Primary Coolant Flow Rate for Loss of Forced Reactor Coolant Flow N/A 14.3.1-7 FIGURE 14.3.1-7 Secondary Pressure for Loss of Forced Reactor Coolant Flow N/A 14.3.3-1 FIGURE 14.3.3-1 Reactor Power Level for Reactor Coolant Pump Rotor Seizure N/A 14.3.3-2 FIGURE 14.3.3-2 Core Average Heat Flux for Reactor Coolant Pump Rotor Seizure N/A 14.3.3-3 FIGURE 14.3.3-3 Reactor Coolant System Temperatures for Reactor Coolant Pump Rotor Seizure N/A 14.3.3-4 FIGURE 14.3.3-4 Pressurizer Pressure for Reactor Coolant Pump Rotor Seizure N/A 14.3.3-5 FIGURE 14.3.3-5 Reactivities for Reactor Coolant Pump Rotor Seizure N/A 14.3.3-6 FIGURE 14.3.3-6 Primary Coolant Flow Rate for Reactor Coolant Pump Rotor Seizure N/A 14.3.3-7 FIGURE 14.3.3-7 Secondary Pressure for Reactor Coolant Pump Rotor Seizure N/A 14.4.1-1 FIGURE 14.4.1-1 Reactor Power Level for Low Power Bank Withdrawal N/A 14.4.1-2 FIGURE 14.4.1-2 Core Average Heat Flux for Low Power Bank Withdrawal N/A 14.4.1-3 FIGURE 14.4.1-3 Reactor Coolant Temperatures for Low Power Bank Withdrawal N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 43 of 49 14.4.1-4 FIGURE 14.4.1-4 Pressurizer Pressure for Low Power Bank Withdrawal N/A 14.4.1-5 FIGURE 14.4.1-5 Reactivities for Low Power Bank Withdrawal N/A 14.4.2-1 FIGURE 14.4.2-1 Reactor Core Power for an Uncontrolled Bank Withdrawal at Power N/A 14.4.2-2 FIGURE 14.4.2-2 Core Average Heat Flux for an Uncontrolled Bank Withdrawal at Power N/A 14.4.2-3 FIGURE 14.4.2-3 Reactor Coolant System Temperatures for an Uncontrolled Bank Withdrawal at Power N/A 14.4.2-4 FIGURE 14.4.2-4 Pressurizer Pressure for an Uncontrolled Bank Withdrawal at Power N/A 14.4.2-5 FIGURE 14.4.2-5 Reactivities for an Uncontrolled Bank Withdrawal at Power N/A 14.4.2-6 FIGURE 14.4.2-6 Secondary Pressure for an Uncontrolled Bank Withdrawal at Power N/A 14.4.3.1-1 FIGURE 14.4.3.1-1 Reactor Power Level for the Limiting Dropped Control Rod/Bank Case N/A 14.4.3.1-2 FIGURE 14.4.3.1-2 Reactor Coolant System Temperatures for the Limiting Dropped Control Rod/Bank Case N/A 14.4.3.1-3 FIGURE 14.4.3.1-3 Pressurizer Pressure for the Limiting Dropped Control Rod/Bank Case N/A 14.4.3.1-4 FIGURE 14.4.3.1-4 Secondary Pressure for the Limiting Dropped Control Rod/Bank Case N/A 14.4.8-1 FIGURE 14.4.8-1 Core Power for a CEA Ejection (Minimum Departure for Nucleate Boiling Ratio Case)
N/A 14.4.8-2 FIGURE 14.4.8-2 Core Average Heat Flux for a CEA Ejection (Minimum Departure for Nucleate Boiling Ratio Case)
N/A 14.4.8-3 FIGURE 14.4.8-3 Reactor Coolant System Temperatures for a CEA Ejection (Minimum Departure for Nucleate Boiling Ratio Case)
N/A 14.4.8-4 FIGURE 14.4.8-4 Pressurizer Pressure for a CEA Ejection (Minimum Departure for Nucleate Boiling Ratio Case)
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 44 of 49 14.4.8-5 FIGURE 14.4.8-5 Reactivities for a CEA Ejection (Minimum Departure for Nucleate Boiling Ratio Case)
N/A 14.4.8-6 FIGURE 14.4.8-6 Secondary Pressure for a CEA Ejection (Minimum Departure for Nucleate Boiling Ratio Case)
N/A 14.4.8-7 FIGURE 14.4.8-7 Core Power for a CEA Ejection (Overpressure)
N/A 14.4.8-8 FIGURE 14.4.8-8 Core Average Heat Flux for a CEA Ejection (Overpressure)
N/A 14.4.8-9 FIGURE 14.4.8-9 Primary System Temperatures for a CEA Ejection (Overpressure)
N/A 14.4.8-10 FIGURE 14.4.8-10 Pressurizer Pressure for a CEA Ejection (Overpressure)
N/A 14.4.8-11 FIGURE 14.4.8-11 Reactivities for a CEA Ejection (Overpressure)
N/A 14.4.8-12 FIGURE 14.4.8-12 Secondary Pressure for a CEA Ejection (Overpressure)
N/A 14.6.1-1 FIGURE 14.6.1-1 Reactor Power Level for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve (Rated Power)
N/A 14.6.1-2 FIGURE 14.6.1-2 Core Average Heat Flux for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve (Rated Power)
N/A 14.6.1-3 FIGURE 14.6.1-3 Reactor Coolant System Temperatures for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve (Rated Power)
N/A 14.6.1-4 FIGURE 14.6.1-4 Pressurizer Pressure for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve (Rated Power)
N/A 14.6.1-5 FIGURE 14.6.1-5 Reactivities for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve (Rated Power)
N/A 14.6.1-6 FIGURE 14.6.1-6 Secondary Pressure for an Inadvertent Opening of a Pressurized Water Reactor Pressurizer Pressure Relief Valve (Rated Power)
N/A 14.6.3-1 FIGURE 14.6.3-1 Steam Generator Tube Rupture with the Loss of Offsite Power RCS Temperature Versus Time N/A 14.6.3-2 FIGURE 14.6.3-2 Steam Generator Tube Rupture with the Loss of Offsite Power Pressurizer Level Versus Time N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 45 of 49 14.6.3-3 FIGURE 14.6.3-3 Steam Generator Tube Rupture with the Loss of Offsite Power Pressurizer Pressure Versus Time N/A 14.6.3-4 FIGURE 14.6.3-4 Steam Generator Tube Rupture with the Loss of Offsite Power Steam Generator Pressure Versus Time N/A 14.6.3-5 FIGURE 14.6.3-5 Steam Generator Tube Rupture with the Loss of Offsite Power Total Break Flow Rate Versus Time N/A 14.6.3-6 FIGURE 14.6.3-6 Steam Generator Tube Rupture with the Loss of Offsite Power Flashed Break Flow Rate Versus Time N/A 14.6.3-7 FIGURE 14.6.3-7 Steam Generator Tube Rupture with the Loss of Offsite Power Atmospheric Dump Valve Flow Rate per Steam Generator Versus Time N/A 14.6.3-8 FIGURE 14.6.3-8 Steam Generator Tube Rupture with the Loss of Offsite Power Main Steam Safety Valve Flow Rates per Steam Generator Versus Time N/A 14.6.3-9 FIGURE 14.6.3-9 Steam Generator Tube Rupture with the Loss of Offsite Power Auxiliary Feedwater Flow Versus Time N/A 14.6.5.1-1 FIGURE 14.6.5.1-1 Normalized Power (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-2 FIGURE 14.6.5.1-2 Safety Injection Tank (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-3 FIGURE 14.6.5.1-3 High Pressure Safety Injection Flow Rates (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-4 FIGURE 14.6.5.1-4 Low Pressure Safety Injection Flow Rates (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-5 FIGURE 14.6.5.1-5 Upper Plenum Pressure During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-6 FIGURE 14.6.5.1-6 Total Break Flow Rate During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-7 FIGURE 14.6.5.1-7 Average Core Inlet Flow Rate During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-8 FIGURE 14.6.5.1-8 Hot Channel Inlet Flow Rate During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-9 FIGURE 14.6.5.1-9 Peak Cladding Temperature Node Fluid Quality During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 46 of 49 14.6.5.1-10 FIGURE 14.6.5.1-10 Peak Cladding Temperature Node Fuel (Average), Cladding and Fluid Temperatures During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-11 FIGURE 14.6.5.1-11 Peak Cladding Temperature Node Heat Transfer Coefficient During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-12 FIGURE 14.6.5.1-12 Peak Cladding Temperature Node Heat Flux During Blowdown (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-13 FIGURE 14.6.5.1-13 Containment Pressure (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-14 FIGURE 14.6.5.1-14 Upper Plenum Pressure (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-15 FIGURE 14.6.5.1-15 Downcomer Mixture Level (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-16 FIGURE 14.6.5.1-16 Core Effective Flooding Rate (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-17 FIGURE 14.6.5.1-17 Core Mixture Level (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-18 FIGURE 14.6.5.1-18 Core Quench Level (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.1-19 FIGURE 14.6.5.1-19 Peak Cladding Temperature Node and Ruptured Node Cladding Temperatures (1.0 DECLG EOC Loss-of-Diesel)
N/A 14.6.5.2-1 FIGURE 14.6.5.2-1 Peak Cladding Temperature Versus Break Size (SBLOCA Break Spectrum)
N/A 14.6.5.2-2 FIGURE 14.6.5.2-2 Reactor Power - 3.78-Inch Break N/A 14.6.5.2-3 FIGURE 14.6.5.2-3 Primary and Secondary System Pressures - 3.78-Inch Break N/A 14.6.5.2-4 FIGURE 14.6.5.2-4 Break Mass Flow Rate - 3.78-Inch Break N/A 14.6.5.2-5 FIGURE 14.6.5.2-5 Break Vapor Void Fraction - 3.78-Inch Break N/A 14.6.5.2-6 FIGURE 14.6.5.2-6 Loop Seal Void Fraction - 3.78-Inch Break N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 47 of 49 14.6.5.2-7 FIGURE 14.6.5.2-7 Total Core Inlet Mass Flow Rate - 3.78-Inch Break N/A 14.6.5.2-8 FIGURE 14.6.5.2-8 Downcomer Collapsed Liquid Level - 3.78-Inch Break N/A 14.6.5.2-9 FIGURE 14.6.5.2-9 Inner and Outer Core Collapsed Liquid Level - 3.78-Inch Break N/A 14.6.5.2-10 FIGURE 14.6.5.2-10 Reactor Vessel Mass - 3.78-Inch Break N/A 14.6.5.2-11 FIGURE 14.6.5.2-11 RCS Loop Mass Flow Rates - 3.78-Inch Break N/A 14.6.5.2-12 FIGURE 14.6.5.2-12 Steam Generator Main Feedwater Mass Flow Rates - 3.78-Inch Break N/A 14.6.5.2-13 FIGURE 14.6.5.2-13 Steam Generator Auxiliary Feedwater Mass Flow Rates - 3.78-Inch Break N/A 14.6.5.2-14 FIGURE 14.6.5.2-14 Steam Generator Total Mass - 3.78-Inch Break N/A 14.6.5.2-15 FIGURE 14.6.5.2-15 (Steam Generator Narrow Range Level % - 3.78-Inch Break N/A 14.6.5.2-16 FIGURE 14.6.5.2-16 (High Pressure Safety Injection Mass Flow Rates - 3.78-Inch Break N/A 14.6.5.2-17 FIGURE 14.6.5.2-17 (Low Pressure Safety Injection Mass Flow Rates - 3.78-Inch Break N/A 14.6.5.2-18 FIGURE 14.6.5.2-18 (Safety Injection Tank Mass Flow Rates - 3.78-Inch Break N/A 14.6.5.2-19 FIGURE 14.6.5.2-19 (Integrated Break Flow And Eccs Flow - 3.78-Inch Break N/A 14.6.5.2-20 FIGURE 14.6.5.2-20 (Hot Assembly Collapsed Liquid Level - 3.78-Inch Break N/A 14.6.5.2-21 FIGURE 14.6.5.2-21 (Hot Assembly Mixture Level - 3.78-Inch Break N/A 14.6.5.2-22 FIGURE 14.6.5.2-22 (Peak Cladding Temperature At Pct Location (11.02 Ft) - 3.78-Inch Break N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 48 of 49 14.6.5.2-23 FIGURE 14.6.5.2-23 (DELETED by FSARCR 00-MP2-023)
N/A 14.6.5.2-24 FIGURE 14.6.5.2-24 (DELETED by FSARCR 00-MP2-023)
N/A 14.6.5.3-1 FIGURE 14.6.5.3-1 Long Term Cooling Plan N/A 14.6.5.3-2 FIGURE 14.6.5.3-2 Reactor Coolant System Refill Time vs. Break Area N/A 14.6.5.3-3 FIGURE 14.6.5.3-3 Core Flush by Hot Side Injection for a Double-Ended Guillotine Cold Leg Break N/A 14.6.5.3-4 FIGURE 14.6.5.3-4 Inner Vessel Boric Acid Concentration vs. Time for a Double-Ended Guillotine Cold Leg Break N/A 14.8.2-1 FIGURE 14.8.2-1 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Containment Pressure vs. Time N/A 14.8.2-2 FIGURE 14.8.2-2 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Containment Temperature vs. Time N/A 14.8.2-3 FIGURE 14.8.2-3 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Mass Flow Rate vs. Time N/A 14.8.2-4 FIGURE 14.8.2-4 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Energy Release Rate vs. Time N/A 14.8.2-5 FIGURE 14.8.2-5 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Integrated Mass Flow vs. Time N/A 14.8.2-6 FIGURE 14.8.2-6 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Integrated Energy Release vs. Time N/A 14.8.2-7 FIGURE 14.8.2-7 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Affected Steam Generator Pressure vs. Time N/A 14.8.2-8 FIGURE 14.8.2-8 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Unaffected Steam Generator Pressure vs. Time N/A 14.8.2-9 FIGURE 14.8.2-9 Main Steam Line Break Analysis - 102% Power with Loss of Offsite Power and Failure of Vital Bus Cabinet VA-10 or VA Affected Steam Generator Liquid Mass vs. Time N/A 14.8.3-1 FIGURE 14.8.3-1 Deleted by FSARCR 04-MP2-018.
N/A LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET
MPS2 UFSAR LOEF 49 of 49 14.8.3-2 FIGURE 14.8.3-2 Deleted by FSARCR 04-MP2-018.
N/A 14.8.3-3 FIGURE 14.8.3-3 Deleted by FSARCR 04-MP2-018.
N/A 14.8.3-4 FIGURE 14.8.3-4 Deleted by FSARCR 04-MP2-018.
N/A 14.8.3-5 FIGURE 14.8.3-5 Deleted by FSARCR 04-MP2-018.
N/A 14.8.3-6 FIGURE 14.8.3-6 Deleted by FSARCR 04-MP2-018.
N/A a.
Incorporated by reference this engineering controlled drawing is, coincidentally, an MPS-2 FSAR figure. Refer to the controlled plant drawing for the latest revision.
LIST OF EFFECTIVE FIGURES Figure Number Figure Label Title Drawing Number SHEET