Commonw9h Edison Dresden Nuclear Power Station R.R. #1 Morris, Illinois 60450 Telephone 815/942-2920 f.
\\
October 29, 1979 BBS LTR:
79-868 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operations - Region III U.S. Nuclear R~gulatory Commission 799\\ Roosevelt Road Glen Ellyn, Illinois 60137
..,1 Reportable Occurrence Report #79-27/03L-0, Docket #050,249, is hereby submitted to your office in accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.2. (b), conditions l,eading to operation in a degraded mode permitted by-a limiting condition for
- operation or plant* sh1:1tdown required by a limiting condition for
BBS:mt Enclosure
~te ens on Station Superintendent Dresden Nuclear Power Station cc:
Director of Inspection & Enforcement Director of Management Information & Program Control File/NRC 7c; 110 7o~4-7 DSB
iNRC FO~.
J7:111
\\.
Ll°CENSEE EVENT REPORT
.,, ; **.,.. CONT~OL BLOCK: !-I _..1.----1. _ _.___l.__""r_._--!.I 0
. *:.(PLEASE PRINT OR TYPE I REQUIRED INF_ORMATIONI 1
6
~
I I I LI DI RI s I 3 l@I o I o I - I o I o I oJ o-1 o I - I a I a 101 4 I 1 I 1 I 1 I l l©I I. I© 9
LICENSEE CODE 14 15 LICEN~~ NUMBER 25 26 LICENSE TYPE JO 57 CAT 58
- - f
. l
~
J l
>ol11 0
- ~~~! ~©I 01 s 1 o I o I o I 21 4 I 9 IG)l l f o I o I 3 I 1 I
~
60 61.
DOCKET NUMBER 68.
69 EVENT DATE 91@11 j o I 3 I o I 1 I 9 10
.. -i---
74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
t§IIJ. I During normal operation while searching for 50 vdc ground, leads to condenser pit.
J]lTI I flooding magnetrol *switches 3-4441-25A and 25B were lifted making half of_ trip. systeIIJ f o 14 I I inop. for 7 hrs.
Safety significance minimized by stationing man with radio at I *
~
I condenser pit.
First occurrence of this event.
Io Is I ITDl Io I a I
'7 8 9 SYSTEM CODE IHI Fl@
9 10 t::::\\*. LER/RO CV ENT YE.4.R
\\!:.) REPORT I 7 I 9 I NUMBER 21 22
CAUSE
CAUSE COMP.
VALVE CODE SUBCODE COMPONENT CODE SUBCODE
- SUBCODE L!.J@ L£.J@ lz lz lz IZ lz lz I@ UJ@ UJ@
11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REPORT NO:
CODE TYPE I I Io 12 I 1 I 1/1 10 J3 I L!J I I 23 24 26 27 28 29 30 31 ACTION FUTURE EFFECT SHUTDOWN r:;:::..
ATTACHMENT NPRD-4 PRIME C.OMP.
REVISION NO.
LQJ 32 COMPONENT MANUFACTURER 80
.,~*
TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED FORM :>UB.
SUPPLIER W@~ ~@ ~ 10101010' IN-I@
L!U@ W 33 34
.. 35 36 37 40 41 42 43 I z I 9 I 9 I 9 I@
CAUS.E DESCRIPTION AND CORRECTIVE ACTIONS.@
44 47 [J]I].I After reattaching leads to level switches the ground cleared.
No precise cause was ITIIJ found.
- There may have been minimal corrosion on switch terminals which was removed ITJil.1 to clear ground when leads were reattached *. DIS 4400""."l was.performed and switches rrm I operated satisfactorily.
No further action now. planned
B 9
Ft,.~fL~y
% POWER OTHER STATUS.@
,-,-1-s J L!J@ I o I 7 I o l@I..... __
N_/_A __
17 8
9 10 12 11 ACTIVITY CONTENT Q\\
I RELEASED OF RELEASE AMOUNT OF ACTiVITY
_ 1 Is I UJ @ Li@)..... l ___
N __
/ A ____
~
8 9
10 11 METHOD OF D_ISCOVERY DESCRIPTION DISCOVERY W@I Operator Observation 44
. 45 46 LOCATION OF RELEASE (§)
N/A 44
. 45 PERSONNEL EXPOSURES
~
I BO BO 80 NUMBER A
TYPE
DESCRIPTION
(I:I:2J. I 0 I 0 I 0 '~@.__ ___
N __ / A.;.._ ____________________
- 7.
8 9
11 12 13 80
. PERSONNEL INJURIES
~
(DIJ _ 10 Nl~Bro l@L.o-Es_c_R_IP-T N::..;.10!..; A:.:~_,_*. ----------------------------*-*:_*
7 8
9 11 12 80 L.OSS OF OR DAMAGE TO FACILITY '4J\\
~-
TYPE.
DESCRIPTION
".::.::J
~LU@
N/A 7
8 9
10 so PUBLICITY t:;5'
. NRC USE ONLY ISSUED DESCRIPTIO.N ~
trnJ we N/A I I I I I I I I I I I I I~
7 8
9 10
M. Korchynsky NAME OF PREPARER-~--~-------------
6B 69 X-422.
PHONE:--------~----
80* c; o*.
ll I
)
l
'I
.I
.)
' ii
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000237/LER-1979-001-03, /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | | | 05000237/LER-1979-001, Forwards LER 79-001/03X-1 | Forwards LER 79-001/03X-1 | | | 05000010/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000010/LER-1979-001-03, /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | | | 05000010/LER-1979-002-03, /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | | | 05000010/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000237/LER-1979-002, Forwards LER 79-002/01X-1 | Forwards LER 79-002/01X-1 | | | 05000237/LER-1979-002-01, /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | | | 05000237/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000237/LER-1979-003-03, /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | | | 05000237/LER-1979-004-03, /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | | | 05000237/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000237/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000237/LER-1979-005-03, /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | | | 05000237/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000237/LER-1979-008-03, /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | | | 05000237/LER-1979-009-03, /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | | | 05000237/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000237/LER-1979-010-01, /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | | | 05000237/LER-1979-010, Forwards LER 79-010/01T-0 | Forwards LER 79-010/01T-0 | | | 05000237/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000237/LER-1979-013-03, /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | | | 05000237/LER-1979-014-03, /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | | | 05000237/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000237/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | | | 05000237/LER-1979-016, Forwards LER 79-016/01T-0 | Forwards LER 79-016/01T-0 | | | 05000237/LER-1979-017-01, X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Saf | X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Safety Feature Sys | | | 05000237/LER-1979-017, Forwards LER 79-017/01T-0 | Forwards LER 79-017/01T-0 | | | 05000237/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000237/LER-1979-020-03, /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | | | 05000249/LER-1979-021-03, /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | | | 05000237/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000237/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000237/LER-1979-023-03, /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | | | 05000249/LER-1979-023-03, /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | | | 05000237/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | | | 05000237/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000249/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000237/LER-1979-027-03, /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | | | 05000237/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000249/LER-1979-027-03, /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | | | 05000237/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | | | 05000237/LER-1979-028-03, /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | | | 05000237/LER-1979-029-03, /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | | | 05000237/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | | | 05000249/LER-1979-030-03, During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | | | 05000249/LER-1979-030, /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | | | 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | | | 05000237/LER-1979-031, Forwards LER 79-031/03L-0 | Forwards LER 79-031/03L-0 | | | 05000237/LER-1979-032, Forwards LER 79-032/03L-0 | Forwards LER 79-032/03L-0 | |
|