CommoAalth Edison Dresden Nuclear Power Station R.R. #1 Morris, Illinois 60'\\50 Telephone 815/942-2920 BBS Lt;r. /179-311 April 6,.1979 James G. Keppler, Regional Director Directdrate of Regulatory Operations - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen-Ellyn, IL 60137
- Reportable Occurrence Report #79-16/0lT-0, Docket # 050-237 is hereby submitted to your office in accordance with Dresden Nuclear Power Station Technical Specification 6.6.B.1.(C),
abnormal degradation discovered in fuel cladding, reactor coolant pressure boundary, or.primary containment.
BBS/kmh Enclosure en Station Superintendent
_Dresden Nuclear Power Station CC:
Director of Inspection & Enforcement Director of Management Information & Program Control File/NRC REGUU\\10RY DOCl\\ET FIL£ COPY, 7904160 \\/O
ATTACHMENT TO LICENSEE EVENT REPORT 79-016/0lT-0.
COMMONWEALTH EDISON COHPANY (CWE)
DRESDEN UNIT 2 * (ILDRS-2)
DOCKET II 050-237 During the current refueling outage, workers discovered water dripping from an elbow on a drain line from the bottom of LPCI testable check valve 2-1501-25.
All leakage was contained inside the drywell and directed to the Drywell Floor Drain System.
Upon further investigation the leakage was determined to be coming from a crack in.the weld on the elbow.
The weld was cracked 360° around the pipe..
,.... _._ *~*:*:. :;:
Calculations showed that a complete severance of a l" line such as this*
would be well within the capabilities of ECCS systems.
The defective weld was ground out, repaired and dy.e. penetrant tested following approved procedures; The weld failure was apparently* due to an improper pipe fitup prior to welding* the. pipe originally i.e., pipe bottomed out in the socket..
'l 9 0416 0 \\"71**
-: :,.t
.. ~.....
.:~r-1:.::_-._.;,;.: *~*~: *
,:**-*~.-,*** **
-****r..
0
.... ~=::,.*,
.::~~*.*,,,:'~.-.:;
_-~'. :* :::~;~;;~~~"f-~~.;;;~;.~~=::::~;*:*.<'.: ~-*.. :~;~~::;,t~-~!* ~;~~ :;~~:~:_;.~_-;_ ::: ~:*.. :--;~:.;_~ ;;_ 2.-~: ~j~ ~- :.:: * ~~;~~~;:,; *:: ;!.;~ ~.';~;;~::<~:;*;;;;.:~r.;::--:::~:::::;~~.~~~{~;;;;;:r::-~;~~~;:~~;~~
17-77)
J LICENSEE EVENT.REPORT
- C'.JNTROL BLOCK:._I _ _.___.. _ _.__..___._ _ _,IQ (PLEASE PRINT OH TYPE ALL REQUIRED INFORMATION) 1 6
] 0:2] I rl LI Dj RI sl 2 IG)I o I 6 I - I o Io Io Io Io I - Io Io 101 41 ll ll ll ll(j)I I 10
~
7 8
9 LICENSEE CODE 14
\\5 LICENSE NUMBER 25.
26 LICENSE TYPE
- JO 57 CAT 58 i-------
-~-CON'T
8 l
i ITTIJ 1
I
- ~~~~ ~01 o 1 s 10 10 p I 2 I 3 I 7 101 o I 3 I 2 I 6 I 7 I 9 I© I o I 4 I o I 6 I
- 7 I 9 I G) 60 61 DOCKET NUMBER 68 69 EVENT DATE
- 74 75 REPORT DATE BO EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
!During refueling, water was discovered to be dripp.ing from an elbow in the drain line 1 [2JI] ion a LPCI check valve.
This event was of minimal safety significance because all leak-J J j CQ:0 !age was contained in the Drywell Floor Drain System and the potential leakage, con-i []J:IJ 1sidering a complete severance of the l" line is well within the capabilities of the
Previous occurrence reported as R.O. #50-237/1977-10
~+- LillJ.. r*.
7 8 9
~-.,.. __,. -.~ *:..**... **-
.~--....
~...:.-*.. I.~'""'~;,~.
80 SYSTEM CODE le IE I@
9 10
(;:;\\
LEA/RO LVENTYEAR
~
REPORT I 7 I 9 I
. NUMBER 21 22
CAUSE
CAUSE
. CODE SUBCODE COMPONENT CODE lLJ@ w@ IP Ir IP IE Ix Ix I@
11 12
OCCUR REN CE REPORT NO.
CODE I I Io 11 I 6 I
24 26.
. 2 7 2B 29 COMP.
SUB CODE lAJ@
19 REPORT TYPE LU 30 VALVE SUBCODE w@
20 L=J 31
RE;VISION NO. w 32 COMPONENT
.ACTION FUTURE EFFECT SHUTDOWN
ATTACHMENT.
NPRD-4 TAKEN ACTION ON PLANT
'METHOD HOURS ~ SUBMITTED
W@W@ w@.W lo lo lo lo I. lx.J@ ULJ SUPP LI ER
- w MANUFACTURE.A 33 34 35 36 37 40 41 42 Ix I 9 I 9 I 9 I@
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
43
~
47 IJI9:J.!Cause of leak was failure of weld due to improper pipe fitup prior to welding, i*. e.
- 1.
IT:.IIJ jpipe was apparently bottomed out in socket.
Defective weld was ground out, repaired IJ))] 1and dye-penetrant tested in accordance with approved procedures.
- i.* ITITJ [III] I--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~--'
J 7
8 F!c1uTY l
STATUS
% POWER OTHER STATUS I [QI] L!!J@ I -0 I 0 I 0 l@...... I _N/_A ___
B 9
10 12 11 ACTIVITY CONTENT
~
j '
RELEASED OF RELEASE AMOUNT OF ACTIVITY i ~LU@ W@I
8 9
10 11 80 METHOD OF DISCOVERY DISCOVERY DESCRIPTION
~@I Operator Observation 44 45 46 80
N/A 44 45 80 P.ERSONNEL EXPOSURES r:;;:;,.
NUMBER
~TYPE
DESCRIPTION
~
I ol o I olL.Ll@.___ __
--"-'-'N""'"A,,__ ___________________
7
11
- 12.
13 PERSONNEL INJURIES
(.;";\\.
NUMBER DESCRIPTION~
~lo lo lo IQ NA*
7
. 8 9
ll~~l2------=~~---------------------------------B-'0 LOSS OF OR DAMAGE TO FACILITY G TYPE*
' DESCRIPTION
~
~@
N/A 80
~
9 10 PUBLICITY
{.;:..
7
. B BO NRC USE ONLY IS~VEDr,;:\\ DESCRIPTION IT@~~.
N/A
. 7
. 8 9
10 NAME OF PREPARER __
J.;;...;;.,. _;::,F..:.*__::Dc.::u.:.:n.:.:b::..:a:;.;r=-------------
I I I I I I I I I I I I 1
68 69 80* o:*.
PHON E: _ __..X.._-...,2...,6....,5..__ ______ _
- 0. :*
- 0.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000237/LER-1979-001-03, /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | | | 05000237/LER-1979-001, Forwards LER 79-001/03X-1 | Forwards LER 79-001/03X-1 | | | 05000010/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000010/LER-1979-001-03, /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | | | 05000010/LER-1979-002-03, /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | | | 05000010/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000237/LER-1979-002, Forwards LER 79-002/01X-1 | Forwards LER 79-002/01X-1 | | | 05000237/LER-1979-002-01, /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | | | 05000237/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000237/LER-1979-003-03, /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | | | 05000237/LER-1979-004-03, /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | | | 05000237/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000237/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000237/LER-1979-005-03, /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | | | 05000237/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000237/LER-1979-008-03, /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | | | 05000237/LER-1979-009-03, /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | | | 05000237/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000237/LER-1979-010-01, /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | | | 05000237/LER-1979-010, Forwards LER 79-010/01T-0 | Forwards LER 79-010/01T-0 | | | 05000237/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000237/LER-1979-013-03, /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | | | 05000237/LER-1979-014-03, /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | | | 05000237/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000237/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | | | 05000237/LER-1979-016, Forwards LER 79-016/01T-0 | Forwards LER 79-016/01T-0 | | | 05000237/LER-1979-017-01, X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Saf | X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Safety Feature Sys | | | 05000237/LER-1979-017, Forwards LER 79-017/01T-0 | Forwards LER 79-017/01T-0 | | | 05000237/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000237/LER-1979-020-03, /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | | | 05000249/LER-1979-021-03, /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | | | 05000237/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000237/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000237/LER-1979-023-03, /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | | | 05000249/LER-1979-023-03, /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | | | 05000237/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | | | 05000237/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000249/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000237/LER-1979-027-03, /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | | | 05000237/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000249/LER-1979-027-03, /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | | | 05000237/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | | | 05000237/LER-1979-028-03, /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | | | 05000237/LER-1979-029-03, /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | | | 05000237/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | | | 05000249/LER-1979-030-03, During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | | | 05000249/LER-1979-030, /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | | | 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | | | 05000237/LER-1979-031, Forwards LER 79-031/03L-0 | Forwards LER 79-031/03L-0 | | | 05000237/LER-1979-032, Forwards LER 79-032/03L-0 | Forwards LER 79-032/03L-0 | |
|