ML17129A392

From kanterella
Jump to navigation Jump to search
TB to Soil
ML17129A392
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/08/2016
From:
ZionSolutions
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17129A311 List: ... further results
References
ZS-2016-0022
Download: ML17129A392 (1)


Text

TB to Soil Group Elevation Area open to flow (in2)

Penetration No.

DWG Line Ident No.

Pen Type Category From Building To Building End State Description Sleeve Size inches Pipe Size inches Insl Thickness in Length in Y

X Sleeve Area Below 588' in2 Pipe Area Below 588' in2 Sleeve Area Below 579' in2 Pipe Area Below 579' in2 Remarks 570 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2) 572 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2) 574 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2) 576 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2) 578 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2) 580 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2) 582 0

Hypothetical 10'x2' section of steam tunnel wall (2880 in2)

N 583.50 78.5398 M-106, M-107 Buried Aux Outside Open Sleeve Fire Protection 10 36 J

35 78.54 O

583.50 78.5398 M-106, M-107 Buried Aux Outside Open Sleeve Fire Protection 10 36 J

5 78.54 O

585.25 12.5664 M-104 4" Oil Fill Line Bld to Bld Pen Turbine Soil (N?)

Open Sleeve Diesel Oil 4

48 G

5 12.57 N

586 12.5664 M-103, M-214 1DO-001-4" Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Diesel Oil 4

48 G

35 12.57 To Diesel Gen Oil Storage Tanks and Transfer Pumps K

586 28.2743 M-104 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Primary Water 6

48 C

24 28.27 K

586.00 78.5398 M-103 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Oil Seperator Tank 10 C

23 78.54 K

586.00 50.2655 M-103 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Fibercast Makeup Demin Waste Discharge 8

C 23 50.27 L

586.00 12.5664 M-105 SH 1 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Condensate Pump Recirc 4

B 21 L

586.00 314.159 M-105 SH 1 & SH 2, M-103 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Condensate 20 B

21 L

586 28.2743 M-104 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Primary Water Storage Tank 6

B 18 28.27 M

586.00 50.2655 M-104 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Fibercast Makeup Demin Waste Discharge 8

C 17 50.27 M

586 28.2743 M-104 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Primary Water Storage Tank 6

C 17 28.27 M

586.00 452.389 M-162 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Service Water 24 C

16 K

587 78.5398 M-105 SH 1 & 2 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Fire Protection 10 C

24 78.54 M-105 and Section CC M-105 Sheet 2 shows going from TB to Crib House at 579' K

590 28.2743 M-103 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Waste Discharge (WD) from Lake Discharge Tank to Discharge Tunnel 6

48 C

24 28.27 M

590 3.14159 M-162 Pen, Bld to Soil Turbine Soil Rad Inventory, Leave Open Waste System 2

C 17 3.14