Docket Nos.
50-275 and 50-323 Mr. J.
D. Shiffer, Vice President Nuclear Power Generation Nuclear Power Generation, Licensing c/o Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 D STRIBUTION oc et i
e Local PDR H. Thompson E. Jordan B. Grimes H. Schierling K. Johnston NRC PDR PAD-3 Rdg.
OELD N. Chokshi C.
Vogan ACRS t10)
Gray file
Dear Mr. Shiffer:
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By letter dated March 27,
- 1986, PG&E submitted, as Enclosure 2,
a report entitled "Diablo Canyon Power Plant, Units I and 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Walls Tests (Proprietary Version)," dated March 1986.
The letter included, as Enclosure I, an application and supporting affidavits for withholding the report from public disclosure, pursuant to 10 CFR 2.790.
The letter also included, as Enclosure 3,
a nonproprietary version of the report.
We have reviewed your application and the material contained in the report based on the requirements and criteria of 10 CFR 2.790.
On the basis of your statements we have determined that the submitted information sought to be withheld contains trade secrets or proprietary commercial information.
Therefore, the version of the submitted information enclosed as proprietary
'ill be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public disclosure shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
We may send copies of this information to our consultants (Franklin Research Center and Drexel University) who are assisting us in our evaluation.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You should also understand that the NRC may have cause to review this determination in the
- future, such as, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Sb04210389 Bb0410 PDR ADOCK 05000275 P
PDR cc:
See next page Steven A. Varga, Director PWR Project Directorate 83 Division of PWR Licensing-A
- SEE PREVIOUS PAGE FOR CONCURRENCES PAD-3*
PAD-3*
PAD-3*
OELD*
C.Vogan K. Johnston;bs H. Schierling S
V rga 04/I/86 04/8/86 04/8/86 04/9/86 04/1 6
I
)lk f
f I
Docket Nos.
50-275 and 50-323 Mr. J.
D. Shiffer, Vice President Nuclear Power Generation Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, Ca 1 ifornia 94106 DISTRIBUTION Local PDR H. Thompson E. Jordan B. Grimes H. Schierling K. Johnston NRC PDR PAD-3 Rdg.
OELD N. Chokshi C.
Vogan ACRS (10)
Gray fil
Dear Mr. Shiffer:
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUB C DISCLOSURE By letter dated March 27, 1986 PG&E submitted, as E closure 2,
a report entitled "Diablo Canyon Power Plant, Units I and
- Verification of Diablo Canyon Energy Balance Technique Using SO S-1 Masonry Walls Tests (Proprietary Version)," dated March 1986.
The etter included, as Enclosure 1,
an application and supporting affidavits for ithholding the report from public disclosure, pursuant to 10 CFR 2.79 The letter also included, as Enclosure 3,
a nonproprietary version of e report.
We have reviewed your application and e material contained in the report based on the requirements and criteri of 10 CFR 2.790.
On the basis of your statements we have determined that e submitted information sought to be withheld contains trade secrets or proprietary commercial information.
Therefore, the version of the su itted information enclosed as proprietary will be withheld from public di closure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic ergy Act of 1954, as amended.
Withholding from public disclosure shall not feet the right, if any, of persons properly and directly concerned to inspe t the documents.
We may send copies of this information to our consul nts (Franklin Research Center and Drexel University) who are assisting us in r evaluation.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.'f the basis for wi holding this information from public inspection should change in the futu e such that the information could then be made available for public inspec ion, you should promptly notify the NRC.
You should also understand that he NRC may have cause to review this determination in the
- future, such a
, if the scope of a Freedom of Information Act request includes your informat'on.
In all review situations, if the NRC makes a determination adverse to t e above, you will be notified in advance of any public disclosure.
Sincerely, cc:
See next page Steven A. Varga, Director PWR Project Directorate P3 Division of PWR Licensing-A PAD-3 P PAD-3 PAD-3
'AD-3 C.Vogan K. Johns on;bs H.
Sch ling
~
S.
Varga 04/g/86 04/g /86 04~86 04/ t/86 04/ /86
Mg
)
,gt ltt I
~ ~
I
~ 'll tt tt