Other: DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement, DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl, ML16341D703, ML16341D707, ML16341D962, ML17083B468, ML20198G219, ML20209D910, ML20213E341
|
MONTHYEARML13310B3371984-04-12012 April 1984 Forwards Nonproprietary & Proprietary Results of Masonry Wall Test Program, Seismic Evaluation of Reinforced Concrete Masonry Walls, Results from Testing Walls 1A,1B & 1C.Application for Withholding & Affidavit Encl Project stage: Request DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement1984-07-0202 July 1984 Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement Project stage: Other ML20209D4161984-10-0202 October 1984 Discusses Review of Facility Masonry Wall Design,Per .Outstanding Issues Identified in Working Stress Approach & Nonlinear Analysis Method.Audit of Design Calculations Suggested Project stage: Approval ML17083B4681984-11-0101 November 1984 Trip Rept of 841001-05 Site Visit W/Bnl Re Identification of Engineering Matl Needed to Conduct Audit on Adequacy of Civil/Structural Design & Analyses.List of Addl Audit Items Encl Project stage: Other ML20209D9101985-02-11011 February 1985 Forwards Sser Input Re Masonry Wall Issue.License Condition Re Applicant Use of energy-balance Technique to Qualify 42 Masonry Walls Recommended Project stage: Other ML16341D5021985-10-29029 October 1985 Notification of 851105 Meeting W/Licensee in Bethesda,Md to Discuss Status of Util Masonry Wall Analysis Project stage: Meeting ML20198G2191985-11-15015 November 1985 Requests That Task of Reviewing Justification for Use of Energy Balance Technique to Qualify Masonry Walls Be Added to Assignment 6 to Contract NRC-03-81-130 Project stage: Other DCL-85-343, Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790)1985-11-15015 November 1985 Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Draft Other ML16341D4961985-11-18018 November 1985 Summary of 851105 Meeting W/Util,Nrc Consultants & Bechtel Re Util Approach to Justify Use of energy-balance Technique to Qualify Masonry Walls.List of Attendees & Request for Addl Info Encl Project stage: RAI ML16341D5111985-11-30030 November 1985 Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests Project stage: Draft Other ML16341D5481985-12-0909 December 1985 Advises That Proprietary Version of Draft Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Tests, Submitted by Will Be Withheld,Per 10CFR2.790 Project stage: Draft Other ML16341D5671985-12-20020 December 1985 Forwards,In Support of Masonry Wall Review,Pg&E & Proprietary & Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Test. Proprietary Draft Withheld (Ref 10CFR2.790).W/o Encl Project stage: Draft Other DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl1986-03-27027 March 1986 Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl Project stage: Other ML16341D7071986-04-10010 April 1986 Forwards Nonproprietary & Proprietary Versions of Verification of Diablo Canyon Energy Balance... & to Assist in Evaluation of Masonry Walls.Proprietary Version Withheld (Ref 10CFR2.70(b)(6)).W/o Encls Project stage: Other ML16341D7031986-04-10010 April 1986 Responds to 860327 Application for Withholding Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Walls Tests .... Rept Will Be Withheld (Ref 10CFR2.790) Project stage: Other ML20213E3411986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version.Record Copy Project stage: Other ML16341D9621986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version Project stage: Other 1985-11-18
[Table View] |
Text
(',
Docket Nos.
50-275 and 50-323 Franklin Research Center The Benjamin Franklin Parkway Phil adel phia, PA 19103 Dear Dr.
Vu Con:
April 10, 1986 D
TRIBUTION oc et i
e w/o encl.
NRC PDR J. Partlow Local PDR H. Schierling PAD-3 Rdg.
C.
Vogan H. Thompson N. Chokshi OELD ACRS(10)
E. Jordan B. Grimes
REFERENCE:
NRC-03-81-130 FINAL ASSIGNMENT 6, DIABLO CANYON I AND 2 In connection with your review of masonry walls for the Diablo. Canyon Nuclear Power Plant, we are providing you with two copies of PGIlE letter DCL-86-083 from J.
D. Shiffer (PGSE) to G.
W. Knighton (NRC), dated March 27,
- 1986, including a proprietary and a non-proprietary version of a report entitled "Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Tests."
This document was submitted to the NRC by PGSE with a request that the proprietary version of the report be withheld from public disclosure pursuant to 10 CFR 2.790.
The staff has granted the request.
Therefore, we are withholding the proprietary version of the report from public disclosure in accordance with 10 CFR 2.70 (b)(6) of the Commission's regulations.
We are transmitting the report to assist you and your consultant, Dr. Hamid of Drexel University, in your evaluation of masonry walls at Diablo Canyon under the above referenced contract.
You are requested not to reproduce or further disclose this information, and to return the document to me upon completion of your review.
Please sign and return the copy of this letter in the enclosed self-addressed envelope.
Please also have Dr. Hamid sign copies of this letter and return to us.
Sincerely,
Enclosures:
Steven A. Varga, Director PWR Project Directorate ¹3 Division of PWR Licensing-A 2.
3.
4.
PGImE letter DCL-86-083, including non-proprietary version of the final
- report, (2 copies).
Proprietary version of the final report to be withheld from public disclosure (2 copies).
Copy of letter to be returned (2 copies).
Self addressed envelope (2 copies).
Agreement:
I agree not to reproduce or disclose the document transmitted with this letter, and to return the document upon completion of my review.
Signed:
PAD-3 P PAD-3 C.
Vogan K.
nston;bs H.
Sgh e
ing 04/Q/86 0 / /
04/S/86 8604220526 860410 PDR ADOCK 05000275 P
PDR oeflgs6 D PA S.
V rga 86
1
'U I
1 m
l
)
t f
I p
B I
4
)
I' a
t lt