Other: DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement, DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl, ML16341D703, ML16341D707, ML16341D962, ML17083B468, ML20198G219, ML20209D910, ML20213E341
|
MONTHYEARML13310B3371984-04-12012 April 1984 Forwards Nonproprietary & Proprietary Results of Masonry Wall Test Program, Seismic Evaluation of Reinforced Concrete Masonry Walls, Results from Testing Walls 1A,1B & 1C.Application for Withholding & Affidavit Encl Project stage: Request DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement1984-07-0202 July 1984 Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement Project stage: Other ML20209D4161984-10-0202 October 1984 Discusses Review of Facility Masonry Wall Design,Per .Outstanding Issues Identified in Working Stress Approach & Nonlinear Analysis Method.Audit of Design Calculations Suggested Project stage: Approval ML17083B4681984-11-0101 November 1984 Trip Rept of 841001-05 Site Visit W/Bnl Re Identification of Engineering Matl Needed to Conduct Audit on Adequacy of Civil/Structural Design & Analyses.List of Addl Audit Items Encl Project stage: Other ML20209D9101985-02-11011 February 1985 Forwards Sser Input Re Masonry Wall Issue.License Condition Re Applicant Use of energy-balance Technique to Qualify 42 Masonry Walls Recommended Project stage: Other ML16341D5021985-10-29029 October 1985 Notification of 851105 Meeting W/Licensee in Bethesda,Md to Discuss Status of Util Masonry Wall Analysis Project stage: Meeting ML20198G2191985-11-15015 November 1985 Requests That Task of Reviewing Justification for Use of Energy Balance Technique to Qualify Masonry Walls Be Added to Assignment 6 to Contract NRC-03-81-130 Project stage: Other DCL-85-343, Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790)1985-11-15015 November 1985 Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Draft Other ML16341D4961985-11-18018 November 1985 Summary of 851105 Meeting W/Util,Nrc Consultants & Bechtel Re Util Approach to Justify Use of energy-balance Technique to Qualify Masonry Walls.List of Attendees & Request for Addl Info Encl Project stage: RAI ML16341D5111985-11-30030 November 1985 Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests Project stage: Draft Other ML16341D5481985-12-0909 December 1985 Advises That Proprietary Version of Draft Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Tests, Submitted by Will Be Withheld,Per 10CFR2.790 Project stage: Draft Other ML16341D5671985-12-20020 December 1985 Forwards,In Support of Masonry Wall Review,Pg&E & Proprietary & Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Test. Proprietary Draft Withheld (Ref 10CFR2.790).W/o Encl Project stage: Draft Other DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl1986-03-27027 March 1986 Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl Project stage: Other ML16341D7071986-04-10010 April 1986 Forwards Nonproprietary & Proprietary Versions of Verification of Diablo Canyon Energy Balance... & to Assist in Evaluation of Masonry Walls.Proprietary Version Withheld (Ref 10CFR2.70(b)(6)).W/o Encls Project stage: Other ML16341D7031986-04-10010 April 1986 Responds to 860327 Application for Withholding Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Walls Tests .... Rept Will Be Withheld (Ref 10CFR2.790) Project stage: Other ML20213E3411986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version.Record Copy Project stage: Other ML16341D9621986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version Project stage: Other 1985-11-18
[Table View] |
Text
gal% Rt'qii~
(4 L
Q
's ~
P
+
ee C1O 4'
+a*<<+
UNITED STATES NMLEA'R REGULATORY COMMISSIO WASHINGTON, D. C. 20555 NOV 01584 MEMORANDUM FOR:
James P. Knight, Assistant Director for Components and Structures Engineering Division of Engineering THRU:
George Lear, Chief K'U
<(Pf'tructural, and Geotechnical Engineering ranch Division of Engineering FROM:
SUBJECT:
P. T. Kuo, Leader.
Structural Engineering Section B..
Structural and Geotechnical Engineering Branch Division,. of Engineering Harold Polk, Structural Engineer Structural Engineering Section B
Structural and Geotechnical Engineering Branch Di'vision of Engineering TRIP REPORT FOR MEETING - OCTOBER 1-,5,
- 1984, WITH PG&E ON DIABLO. CANYON UNIT 2. AUDIT From October 1 thru 5, 1984, P-. T. Kuo; Harold Polk, and N. Chokshi of the SGEB staff and consultants C. Miller, C. Constantino and A.
Philippacopoulos of Brookhaven National Laboratory (BNL) met with the PG&E Diablo Canyon Project staff on the evaluation. of Diablo Canyon Unit 2 design.
The purpose of the trip'was to identify the engineering material needed to conduct
- a. staff. audit on the adequacy of civil/structural design and analyses.
Items that were identified as being necessary to begin the audit process are contained in Enclosure 1.
After this material has been evaluated additional material may be required.
The staff and its consultants toured the Diablo Canyon Unit 2 facility on October 4 to become more familiar with the physical layout and construction of the unit.
The staff also reviewed the calculations for several safety related masonry block walls and inspected walls during the plant visit.
quality assurance/quality control measures were discussed with PG&E,.
A copy of the staff's position-with respect to the energy balance technique to qualify the walls was provided to PG&E during the discussions.
PG&E provided:= considerable information and several construction personnel who were present during the wall construction.
The staf projects additional audits to be conducted in the very near future.
cc:
See next page.
~ P
Knight
<<2 Additional meetings with PGSE are anticipated to be held within the next few weeks to clarify any questions the staff may have regarding the material provided.
' (
P.:T; duo, Leader Structural Engineering'ection B
Structural and Geotechnical Engineering Branch Division of Engineering cc:
R. Vollmer
'~H~SChi'erlking.-i.
P.
Kuo H. Polk N. Chokshi C. Miller C. Constantino
~'A. Philippacopoulos arold Polk, Structural Engineer Structural. Engineering Section 8
.Structural and Geotechnical Engineering Branch Division of Engineering,
ID Diablo Canyon Unit 2 NRC/BNL Civil Structural Evaluation Additional Audit Items A.
Turbine Building:
1.
The following drawings are requested for the development of a 2D Model for a typical frame
- a.
443117 plan of elevation-140'south b.
- 443118 plans of elevations
- 123, 125 and 128 443121 plan of elevation 119 south d.. 443123 plan of elevations 104 and 107 south
- 2. "The stiffness matrix reflecting the roof truss.
This is contained in calculations 64-T-275.
3.
Calculations'65-T-311 for elevation of the stresses in the buttresses.
These calcs had not. been completed during the October 1-4, 1984 audit.
B.
Containment Annulus Structure:
C.
D.-
1.
Member evaluations for one tangetial
- beam, one radial
- beam, one column.
Provide calcs for. stress evaluation for critical load combination.
In selecting the members include. those with torsion effects and specifically the members which were strengthened by T-section addition.
2.
Horizontal seismic analysis of floor at elevation 106, including all modes of the interior concrete and annulus frame up to 33 Hz used in the studies to investigate the effect of frequencies between 20 Hz'and 33 Hz.
Provide the-following:
a.
model b.
computer printout. of input and output data Buried Electrical Conduits
(
1.
Sample of design drawings. including routing plan, and sample analyses.
Electrical Raceway Supports 1.
Sample of typical calculations showing load combinations and member stress evaluations..