TAC:60090, (Approved, Closed) | |
Initiation
Administration Results Other: DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement, DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl, ML16341D703, ML16341D707, ML16341D962, ML17083B468, ML20198G219, ML20209D910, ML20213E341 | |
MONTHYEARML13310B3371984-04-12012 April 1984
[Table View]Forwards Nonproprietary & Proprietary Results of Masonry Wall Test Program, Seismic Evaluation of Reinforced Concrete Masonry Walls, Results from Testing Walls 1A,1B & 1C.Application for Withholding & Affidavit Encl Project stage: Request DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement1984-07-0202 July 1984 Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement Project stage: Other ML20209D4161984-10-0202 October 1984 Discusses Review of Facility Masonry Wall Design,Per .Outstanding Issues Identified in Working Stress Approach & Nonlinear Analysis Method.Audit of Design Calculations Suggested Project stage: Approval ML17083B4681984-11-0101 November 1984 Trip Rept of 841001-05 Site Visit W/Bnl Re Identification of Engineering Matl Needed to Conduct Audit on Adequacy of Civil/Structural Design & Analyses.List of Addl Audit Items Encl Project stage: Other ML20209D9101985-02-11011 February 1985 Forwards Sser Input Re Masonry Wall Issue.License Condition Re Applicant Use of energy-balance Technique to Qualify 42 Masonry Walls Recommended Project stage: Other ML16341D5021985-10-29029 October 1985 Notification of 851105 Meeting W/Licensee in Bethesda,Md to Discuss Status of Util Masonry Wall Analysis Project stage: Meeting ML20198G2191985-11-15015 November 1985 Requests That Task of Reviewing Justification for Use of Energy Balance Technique to Qualify Masonry Walls Be Added to Assignment 6 to Contract NRC-03-81-130 Project stage: Other DCL-85-343, Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790)1985-11-15015 November 1985 Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Draft Other ML16341D4961985-11-18018 November 1985 Summary of 851105 Meeting W/Util,Nrc Consultants & Bechtel Re Util Approach to Justify Use of energy-balance Technique to Qualify Masonry Walls.List of Attendees & Request for Addl Info Encl Project stage: RAI ML16341D5111985-11-30030 November 1985 Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests Project stage: Draft Other ML16341D5481985-12-0909 December 1985 Advises That Proprietary Version of Draft Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Tests, Submitted by Will Be Withheld,Per 10CFR2.790 Project stage: Draft Other ML16341D5671985-12-20020 December 1985 Forwards,In Support of Masonry Wall Review,Pg&E & Proprietary & Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Test. Proprietary Draft Withheld (Ref 10CFR2.790).W/o Encl Project stage: Draft Other DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl1986-03-27027 March 1986 Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl Project stage: Other ML16341D7071986-04-10010 April 1986 Forwards Nonproprietary & Proprietary Versions of Verification of Diablo Canyon Energy Balance... & to Assist in Evaluation of Masonry Walls.Proprietary Version Withheld (Ref 10CFR2.70(b)(6)).W/o Encls Project stage: Other ML16341D7031986-04-10010 April 1986 Responds to 860327 Application for Withholding Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Walls Tests .... Rept Will Be Withheld (Ref 10CFR2.790) Project stage: Other ML20213E3411986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version.Record Copy Project stage: Other ML16341D9621986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version Project stage: Other 1985-11-18 |
| ML16341D511 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon, San Onofre, 05000000 |
| Issue date: | 11/30/1985 |
| From: | PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML16341D512 | List: |
| References | |
| 0596S, 5965, 596S, DCL-85-343, IEB-80-11, TAC-60090, NUDOCS 8511270241 | |
| Download: ML16341D511 (318) | |