ML16257A142

From kanterella
Jump to navigation Jump to search
09 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.1-1 Through 15A.1-4
ML16257A142
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A142 (4)


Text

STEAM VOIDING IN RCS ANALYSIS 1250 loo0 0 300 600 900 1200 1500 1800 TIME. SECONDS TUBE RUPTURE WITH A LOUISIANA POWER LIGHT CO.

3 I Waterford Steam CONCURR Electric Station Figure LOSS OF NORMAL AC POWER

VOIDING IN RCS ANALYSIS 1960 I

1560 a

1160 TOP OF 760 360 TOPOFFUELASSEMBLY I

I I

I 0

400 800 1200 1600 2000 TIME IN SECONDS LOUISIANA Figure POWER LIGHT CO.

STEAM GENERATOR TUBE RUPTURE WITH LOP Waterford Steam REACTOR VESSEL LIQUID VOLUME TIME Electric Station

2400 0

I 0

100 200 300 400 500 TIME, SECONDS LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station FULL POWER STEAMLINE BREAK, IC, LOP, PUMP FAILURE, STUCK CEA, AUTOMATIC ACTUATION OF AFW REACTOR COOLANT SYSTEM PRESSURE vs TIME Figure 15A. 1-3

1960 800 TOP OF HOT LEG 0

100 200 300 400 500 TIME, SECONDS LOUISIANA I

POWER LIGHT CO.

FUL L t

Waterford Steam

FAILURE, Electric Station