ML16257A142
| ML16257A142 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16257A142 (4) | |
Text
STEAM VOIDING IN RCS ANALYSIS 1250 loo0 0 300 600 900 1200 1500 1800 TIME. SECONDS TUBE RUPTURE WITH A LOUISIANA POWER LIGHT CO.
3 I Waterford Steam CONCURR Electric Station Figure LOSS OF NORMAL AC POWER
VOIDING IN RCS ANALYSIS 1960 I
1560 a
1160 TOP OF 760 360 TOPOFFUELASSEMBLY I
I I
I 0
400 800 1200 1600 2000 TIME IN SECONDS LOUISIANA Figure POWER LIGHT CO.
STEAM GENERATOR TUBE RUPTURE WITH LOP Waterford Steam REACTOR VESSEL LIQUID VOLUME TIME Electric Station
2400 0
I 0
100 200 300 400 500 TIME, SECONDS LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station FULL POWER STEAMLINE BREAK, IC, LOP, PUMP FAILURE, STUCK CEA, AUTOMATIC ACTUATION OF AFW REACTOR COOLANT SYSTEM PRESSURE vs TIME Figure 15A. 1-3
1960 800 TOP OF HOT LEG 0
100 200 300 400 500 TIME, SECONDS LOUISIANA I
POWER LIGHT CO.
FUL L t
Waterford Steam
- FAILURE, Electric Station