Notification of NRC Component Design Bases Inspection 05000424/2016007 and 05000425/2016007
ML16194A015
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/11/2016
From: Bartley J
NRC/RGN-II/DRS/EB1
To: Taber B
Southern Nuclear Operating Co
References
IR 2016007
Download: ML16194A015 (7)


See also: IR 05000424/2016007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

July 11, 2016

Mr. B. Keith Taber, VP Nuclear Plant Site

Southern Nuclear Operating Co., Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: NOTIFICATION OF VOGTLE ELECTRIC GENERATING PLANT, UNITS 1

AND 2 - NRC COMPONENT DESIGN BASES INSPECTION -

INSPECTION REPORT 05000424/2016007 AND 05000425/2016007

Dear Mr. Taber:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Vogtle Electric

Generating Plant during the weeks of October 03 - 07, October 17 - 21, and October 31 -

November 04, 2016. Theodore Fanelli, a Senior Reactor Inspector from the NRCs Region II

Office, will lead the inspection team. This inspection will be conducted in accordance with the

baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection,

issued November 29, 2013.

The inspection will evaluate the capability of risk significant/low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

On July 7, 2016, Mr. Fanelli notified Mr. Walden, of your staff, arrangements for an information-

gathering site visit, and the three-week onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of August 29 - September 01, 2016
  • Onsite weeks: October 03 - 07, October 17 - 21, and October 31 - November 04,

2016

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. John Hanna, a Region II Senior Reactor

Analyst, will accompany Mr. Fanelli during the information-gathering visit to review probabilistic

risk assessment data and identify risk significant components that will be examined during the

inspection. In addition, during the onsite weeks, time will be needed on the plant-referenced

simulator in order to facilitate the development of operator action-based scenarios.

K. Taber 2

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II office by August 25, 2016. Contact

Mr. Fanelli with any questions concerning the requested information. The inspectors will try to

minimize your administrative burden by specifically identifying only those documents required

for inspection preparation.

Additional documents will be requested during the information-gathering visit. The additional

information will need to be available to the team in the Region II office on or before

September 22, 2016, to support the inspection teams preparation week. Mr. Fanelli will also

discuss the following inspection support administrative details: (1) availability of knowledgeable

plant engineering and licensing personnel to serve as points of contact during the inspection; (2)

method of tracking inspector requests during the inspection; (3) licensee computer access; (4)

working space; (5) arrangements for site access; and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

Enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Fanelli at 404-997-4433 or me at

404-997-4607.

Sincerely,

/RA/

Jonathan H. Bartley, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-424, 50-425

License Nos. NPF-68, NPF-81

Enclosure:

Information Request for Vogtle Electric Generating Plant -

Component Design Bases Inspection

cc: Distribution via Listserv

____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE TNF1 JHB1

NAME TFANELLI JBARTLEY

DATE 7/5/2016 7/11 /2016 7/ /2016 7/ /2016 7/ /2016 7/ /2016 7/ /

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES

INFORMATION REQUEST FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in searchable .pdf files, Excel, or other

searchable format on CDROM (or FTP site, SharePoint, etc.) The CDROM (or website) should

be indexed and hyperlinked to facilitate ease of use. The requested item below identified with

(*) should have a date range from January 1, 2013 until the present. The morning of the

bagman site visit, please make available items 1 through 4 and 27 through 30 below.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by Risk

Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

c. A list of the top 500 LERF contributors

2. From your most recent PSA including external events and fires:

a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,

and the other sorted by Birnbaum Importance

b. A list of the top 500 cut-sets

3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide

human reliability worksheets for these items

4. List of time-critical operator actions with a brief description of each action

5. *List of revised (significant) Emergency and Abnormal Operating Procedures with a brief

description of each revision

6. *List of components with low-design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and

associated evaluations or calculations

7. *List of station-operating experience evaluations/reviews performed and documented in the

stations corrective action program for industry events and safety-related equipment

failures/vulnerabilities (as communicated by NRC Generic Communications, Industry

Communications, 10 CFR Part 21 Notifications, etc.)

8. *List and brief description of safety-related structures, systems, or components (SSCs)

design modifications implemented

9. *List and brief description of Root Cause Evaluations performed

10. *List and brief description of common-cause component failures that have occurred

Enclosure

2

11. List and brief description of equipment currently in degraded or nonconforming status as

described in NRC Inspection Manual Chapter 0326, issued December 3, 2015

12. *List and brief description of Operability Determinations and Functionality Assessments

13. *List and reason for equipment that has been classified in maintenance rule (a)(1) status

14. *List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s) along with dates added or removed from

the issues list

15. List of current operator work arounds/burdens

16. Copy of Updated Final Safety Analysis Report

17. Copy of Technical Specification(s)

18. Copy of Technical Specifications Bases

19. Copy of Technical Requirements Manual(s)

20. Copy of the Quality Assurance Program Manual

21. Copy of systems Design Bases Documents

22. Copy of Corrective Action Program Procedure(s)

23. Copy of Operability Determination Procedure(s)

24. Copy of In-service Testing Program Procedure(s)

25. List of motor operated valves and air operated valves in the valve program, and their

associated design margin and risk ranking

26. Primary AC and DC calculations for safety-related buses

27. One-line diagram of electrical plant. (Electronic and full size - hard copy for use on the

bagman visit and to take back to the office)

28. Index and legend for electrical plant one-line diagrams

29. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic

and 1/2 size - hard copy for use on the bagman visit and to take back to the office)

30. Index and Legend for P&IDs

31. Index (procedure number, title, and current revision) of station Emergency Operating

Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures

3

32. Copies of corrective action documents generated from previous CDBI

33. Copy of any self-assessments performed in preparation for current and previous CDBI

34. List of corrective action documents generated in preparation for this inspection

35. Contact information for a person to discuss PSA information prior to and during the

information-gathering trip (Name, title, phone number, and e-mail address)

LIST OF ACRONYMS

AC Alternating Current

AOP Abnormal Operating Procedure

ARP Annunciator Response Procedure

CDBI Component Design Basis Inspection

DC Direct Current

ECCS Emergency Core Cooling System

EOP Emergency Operating Procedure

FTP File Transfer Protocol

NRC Nuclear Regulatory Commission

OE Operating Experience

P&ID Piping and Instrumentation Diagram

PRA Probabilistic Risk Assessment

PSA Probabilistic Safety Assessment

RAW Risk Achievement Worth

RIS Regulatory Issue Summary

SSC Structure, System or Component

UFSAR Updated Final Safety Analysis Report