NRR E-mail Capture - Acceptance Review for the Seabrook LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6
ML16097A216
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/28/2016
From: Robert Gladney
Plant Licensing Branch 1
To: Ossing M
Florida Power & Light Co
References
MF7439
Download: ML16097A216 (2)


Text

NRR-PMDAPEm Resource From: Gladney, Robert Sent: Monday, March 28, 2016 7:54 AM To: Michael Ossing (michael.ossing@fpl.com); Michael Ossing - NextEra Energy Seabrook, LLC (Michael.ossing@nexteraenergy.com)

Cc: Lamb, John; RidsNrrPMSeabrook Resource; Broaddus, Doug; Hoffman, Raymond; RidsNRRLIC109 Resource; Norris, Michael

Subject:

Acceptance Review for the Seabrook LAR to Adopt EAL Schemes pursuant to NEI 99-01, Revision 6 (CAC No. MF7439)

Importance: High

Dear Mr. Michael Ossing:

By letter dated February 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16068A130), NextEra Energy Seabrook, LLC submitted a license amendment request (LAR) to adopt the emergency action level (EAL) schemes pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors, at Seabrook Station, Unit 1 (Seabrook).

The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1022 or via e-mail at Robert.Gladney@nrc.gov.

Regards, Robert L. Gladney Project Manager NRC/NRR/DORL Robert.Gladney@nrc.gov (301) 415-1022 Mail: OWFN 08B1A 1

Hearing Identifier: NRR_PMDA Email Number: 2757 Mail Envelope Properties (Robert.Gladney@nrc.gov20160328075300)

Subject:

Acceptance Review for the Seabrook LAR to Adopt EAL Schemes pursuant to NEI 99-01, Revision 6 (CAC No. MF7439)

Sent Date: 3/28/2016 7:53:59 AM Received Date: 3/28/2016 7:53:00 AM From: Gladney, Robert Created By: Robert.Gladney@nrc.gov Recipients:

"Lamb, John" <John.Lamb@nrc.gov>

Tracking Status: None "RidsNrrPMSeabrook Resource" <RidsNrrPMSeabrook.Resource@nrc.gov>

Tracking Status: None "Broaddus, Doug" <Doug.Broaddus@nrc.gov>

Tracking Status: None "Hoffman, Raymond" <Raymond.Hoffman@nrc.gov>

Tracking Status: None "RidsNRRLIC109 Resource" <RidsNRRLIC109.Resource@nrc.gov>

Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov>

Tracking Status: None "Michael Ossing (michael.ossing@fpl.com)" <michael.ossing@fpl.com>

Tracking Status: None "Michael Ossing - NextEra Energy Seabrook, LLC (Michael.ossing@nexteraenergy.com)"

<Michael.ossing@nexteraenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2652 3/28/2016 7:53:00 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Gladney, Robert Sent: Monday, March 28, 2016 7:54 AM To: Michael Ossing (michael.ossing@fpl.com); Michael Ossing - NextEra Energy Seabrook, LLC (Michael.ossing@nexteraenergy.com)

Cc: Lamb, John; RidsNrrPMSeabrook Resource; Broaddus, Doug; Hoffman, Raymond; RidsNRRLIC109 Resource; Norris, Michael

Subject:

Acceptance Review for the Seabrook LAR to Adopt EAL Schemes pursuant to NEI 99-01, Revision 6 (CAC No. MF7439)

Importance: High

Dear Mr. Michael Ossing:

By letter dated February 27, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16068A130), NextEra Energy Seabrook, LLC submitted a license amendment request (LAR) to adopt the emergency action level (EAL) schemes pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors, at Seabrook Station, Unit 1 (Seabrook).

The purpose of this correspondence is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-1022 or via e-mail at Robert.Gladney@nrc.gov.

Regards, Robert L. Gladney Project Manager NRC/NRR/DORL Robert.Gladney@nrc.gov (301) 415-1022 Mail: OWFN 08B1A 1

Hearing Identifier: NRR_PMDA Email Number: 2757 Mail Envelope Properties (Robert.Gladney@nrc.gov20160328075300)

Subject:

Acceptance Review for the Seabrook LAR to Adopt EAL Schemes pursuant to NEI 99-01, Revision 6 (CAC No. MF7439)

Sent Date: 3/28/2016 7:53:59 AM Received Date: 3/28/2016 7:53:00 AM From: Gladney, Robert Created By: Robert.Gladney@nrc.gov Recipients:

"Lamb, John" <John.Lamb@nrc.gov>

Tracking Status: None "RidsNrrPMSeabrook Resource" <RidsNrrPMSeabrook.Resource@nrc.gov>

Tracking Status: None "Broaddus, Doug" <Doug.Broaddus@nrc.gov>

Tracking Status: None "Hoffman, Raymond" <Raymond.Hoffman@nrc.gov>

Tracking Status: None "RidsNRRLIC109 Resource" <RidsNRRLIC109.Resource@nrc.gov>

Tracking Status: None "Norris, Michael" <Michael.Norris@nrc.gov>

Tracking Status: None "Michael Ossing (michael.ossing@fpl.com)" <michael.ossing@fpl.com>

Tracking Status: None "Michael Ossing - NextEra Energy Seabrook, LLC (Michael.ossing@nexteraenergy.com)"

<Michael.ossing@nexteraenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2652 3/28/2016 7:53:00 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: