NRC-042 - Florida Power & Light Company, Turkey Point Units 3 and 4: License Amendment; Issuance, Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene, 79 Fed. Reg. 47,689 (August 14, 2014)
ML15314A575
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/14/2014
From:
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28499
Download: ML15314A575 (5)


Text

NRC-042 Submitted Nov. 10, 2015 Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices 47689 confirmatory survey to confirm the January 30, 2014. The State had III. Finding of No Significant Impact licensees survey results. Therefore, questions and comments on the On the basis of the EA, the NRC has Radioactive Waste Site RW-06 can be radioactive contaminants as they relate concluded that there are no significant released by the licensee for unrestricted to the release of Site RW-06 for environmental impacts from the use. unrestricted use based on dose. The proposed amendment and has The State of New Mexico was offered Department of the Air Force responded determined not to prepare an an opportunity to review and comment to the States comments by environmental impact statement.

on the draft EA, FONSI, and Technical Memorandum dated April 8, 2014. The Evaluation Report used to support the State had no further comments on this IV. Availability of Documents licensing action. The State provided the EA and FONSI. The ADAMS accession numbers for NRC with comments by letter dated the documents related to this notice are:

ADAMS Document accession No.

U.S. Nuclear Regulatory Commission, NUREG-1575, Revision 1, Multi-Agency Radiation Survey and Site Investigation Manual ML082310759 (MARSSIM), August 2000.

U.S. Nuclear Regulatory Commission, NUREG-1757, Volume 1, Revision 2, Consolidated Decommissioning Guidance, Sep- ML063000243 tember 2006.

U.S. Nuclear Regulatory Commission, NRC Inspection Report 030-28641/11-002, June 29, 2011 ................................................ ML111801367 Department of the Air Force, Final Status Survey Report, Site RW-06, Kirtland Air Force Base, Albuquerque, New Mexico, No- ML11363A116 vember 3, 2011.

U.S. Nuclear Regulatory Commission, Request for Additional Information About the Department of Air Forces Final Status Sur- ML12208A175 vey Report for Site RW-06 at Kirtland Air Force Base, July 26, 2012.

Department of the Air Force, Additional Information to Support Final Status Survey for Site RW-06, Kirtland Air Force Base, ML13186A161 New Mexico, October 11, 2012.

New Mexico Environment Department, Request for Comment on Draft Environmental Assessment for Decommissioning at ML14064A359 Kirtland Air Force Base, January 30, 2014.

Department of the Air Force, Response to Request for Comments on Draft Environmental Assessment for Decommissioning ML14120A421 Kirtland Air Force Base, April 8, 2014.

Dated at Arlington, Texas this 01st day of Specifications (TSs) from 100 to 104 http://www.nrc.gov/reading-rm/

August 2014. degrees Fahrenheit (°F) and revise adams.html. To begin the search, select For the Nuclear Regulatory Commission. surveillance requirements for ADAMS Public Documents and then Ray L. Kellar, monitoring the UHS temperature and select Begin Web-based ADAMS Chief, Repository and Spent Fuel Safety component cooling water (CCW) heat Search. For problems with ADAMS, Branch, Division of Nuclear Materials Safety, exchangers. The amendments also made please contact the NRCs Public Region IV. editorial changes to the TSs. The Staff Document Room (PDR) reference staff at

[FR Doc. 2014-19280 Filed 8-13-14; 8:45 am] finds that the application for the license 1-800-397-4209, 301-415-4737, or by BILLING CODE 7590-01-P amendments complies with the email to pdr.resource@nrc.gov. For the requirements of the Atomic Energy Act convenience of the reader, the ADAMS of 1954, as amended, and the NRCs accession numbers for each document NUCLEAR REGULATORY regulations. referenced in this document (if that COMMISSION document is available in ADAMS) are DATES: A requests for a hearing or

[Docket Nos. 50-250 and 50-251; NRC- petition for leave to intervene must be provided in a table in the Availability 2014-0176] filed by October 14, 2014. of Documents section of this document.

ADDRESSES: Please refer to Docket ID Florida Power & Light Company;

  • NRCs PDR: You may examine and NRC-2014-0176 when contacting the Turkey Point Nuclear Generating Units purchase copies of public documents at NRC about the availability of 3 and 4 the NRCs PDR, Room O1-F21, One information regarding this document.

White Flint North, 11555 Rockville AGENCY: Nuclear Regulatory You may obtain publicly-available Pike, Rockville, Maryland 20852.

Commission. information related to this document using any of the following methods: FOR FURTHER INFORMATION CONTACT:

ACTION: License amendment; issuance,

  • Federal Rulemaking Web site: Go to Audrey Klett, Office of Nuclear Reactor opportunity to request a hearing, and http://www.regulations.gov and search Regulation, U.S. Nuclear Regulatory petition for leave to intervene.

for Docket ID NRC-2014-0176. Address Commission, Washington DC 20555-

SUMMARY

The U.S. Nuclear Regulatory questions about NRC dockets to Carol 0001; telephone: 301-415-0489, email:

Commission (NRC) approved a request Gallagher; telephone: 301-287-3422; Audrey.Klett@nrc.gov.

by Florida Power & Light Company (the email: Carol.Gallagher@nrc.gov. For SUPPLEMENTARY INFORMATION:

licensee) for amendments to Renewed technical questions, contact the I. Introduction Facility Operating License Nos. DPR-31 individual listed in the FOR FURTHER tkelley on DSK3SPTVN1PROD with NOTICES and DPR-41, issued to the licensee for INFORMATION CONTACT section of this The NRC issued amendments to operation of Turkey Point Nuclear document. Renewed Facility Operating License Generating Units 3 and 4 (Turkey Point),

  • NRCs Agencywide Documents Nos. DPR-31 and DPR-41, issued to located in Miami-Dade County, Florida. Access and Management System Florida Power & Light Company, for The amendments revise the ultimate (ADAMS): You may obtain publicly operation of the Turkey Point Nuclear heat sink (UHS) water temperature limit available documents online in the Generating Units 3 and 4, located in in the Turkey Point Technical ADAMS Public Documents collection at Miami-Dade County, Florida. The VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

47690 Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices amendments revise the UHS water significant hazards consideration As required by 10 CFR 2.309, a temperature limit in the Turkey Point published in the Federal Register on request for hearing or petition for leave TSs from 100 to 104 °F and revise July 30, 2014. Therefore, after to intervene must set forth with surveillance requirements for considering the continued exigent particularity the interest of the monitoring the UHS temperature and circumstances related to the dry petitioner in the proceeding and how CCW heat exchangers. The amendments weather, UHS temperature, algae that interest may be affected by the also made editorial changes to the TSs. concentration, and grid reliability, and results of the proceeding. A request for The Staff finds that the application for pursuant to 10 CFR 50.91(a)(6)(i)(B), the hearing or petition for leave to intervene the license amendments complies with Staff used local media to provide must state: (1) The name, address, and the requirements of the Atomic Energy reasonable notice to the public in the telephone number of the requestor or Act of 1954, as amended, and the NRCs area surrounding the licensees facility petitioner; (2) the nature of the regulations. Copies of the Staffs of the amendment request and the requestors/petitioners right under the evaluation may be obtained and proposed determination that no Act to be made a party to the examined at ADAMS Accession No. significant hazards consideration is proceeding; (3) the nature and extent of ML14199A107. involved, and provided a shortened the requestors/petitioners property, In its letters dated July 10, and July comment period. The licensees financial, or other interest in the 17, 2014, the licensee stated that the supplement dated August 4, 2014, proceeding; and (4) the possible effect of UHS temperature has approached the provided additional information that any decision or order which may be current TS limit of 100 °F. The licensee clarified the application, did not expand entered in the proceeding on the stated that the UHS temperature has the scope of the application as noticed requestors/petitioners interest.

been trending higher than historical in the newspapers, and did not change For each contention, the requestor/

averages in part because of reduced the NRC staffs revised proposed no petitioner must provide a specific water levels caused by unseasonably dry significant hazards consideration statement of the issue of law or fact to weather and because of reduced cooling determination as published in the be raised or controverted, as well as a efficiency caused by an algae bloom of newspapers local to the Turkey Point brief explanation of the basis for the concentrations higher than previously site. No comments have been received. contention. Additionally, the requestor/

observed. The licensee requested a Because of the unpredictable nature of petitioner must demonstrate that the timely review of its application to avoid the dry weather, the UHS temperature, issue raised by each contention is a dual unit shutdown that could affect algae concentration, and grid reliability, within the scope of the proceeding and grid reliability. Therefore, the licensee the NRC determined that the exigent is material to the findings that the NRC requested that the NRC process the circumstances remain. Therefore, the must make to support the granting of a license amendment requests under NRC is issuing the amendments prior to license amendment in response to the emergency circumstances in accordance the expiration of the superseded 14-day application. The hearing request or with § 50.91(a)(5) of Title 10 of the Code comment period published in the initial petition must also include a concise of Federal Regulations (10 CFR). The Federal Register notice (FRN) (79 FR statement of the alleged facts or expert Staff considered the circumstances (i.e. 44214, July 30, 2014). No request for a opinion that support the contention and the dry weather, UHS temperature, algae hearing or petition for leave to intervene on which the requestor/petitioner concentration, and grid reliability) and was filed based on the superseded FRN. intends to rely at the hearing, together found exigent circumstances exist, in To prevent any confusion about the time with references to those specific sources that a licensee and the Commission to request a hearing, which may have and documents. The hearing request or must act quickly and that time does not been caused by the original petition must provide sufficient permit the Commission to publish a (superseded) FRN, the NRC is now information to show that a genuine Federal Register notice allowing 30 resetting the period to request a hearing dispute exists with the applicant on a days for prior public comment. The or petition for leave to intervene. material issue of law or fact, including Staff also determined that the references to specific portions of the II. Opportunity To Request a Hearing amendment involves no significant application for amendment that the and Petition for Leave To Intervene hazards considerations. Accordingly, petitioner disputes and the supporting pursuant to 10 CFR 50.91(a)(6)(i)(A), the Within 60 days after the date of reasons for each dispute. If the Commission published a notice of an publication of this Federal Register requestor/petitioner believes that the opportunity for hearing and notice for notice, any person whose interest may application for amendment fails to prior public comment on its proposed be affected by this proceeding and who contain information on a relevant matter determination that no significant desires to participate as a party in the as required by law, the requestor/

hazards consideration is involved; the proceeding must file a written request petitioner must identify each failure and notice was published in the Federal for hearing or a petition for leave to the supporting reasons for the Register on July 30, 2014 (79 FR 44214). intervene specifying the contentions requestors/petitioners belief. Each The licensees supplements dated July which the person seeks to have litigated contention must be one which, if 22, July 24, July 26, and July 28, 2014, in the hearing with respect to the proven, would entitle the requestor/

provided additional information that license amendment request. Requests petitioner to relief. A requestor/

clarified the application, did not expand for hearing and petitions for leave to petitioner who does not satisfy these the scope of the application as originally intervene shall be filed in accordance requirements for at least one contention noticed, and did not change the NRC with the NRCs Agency Rules of will not be permitted to participate as a staffs original proposed no significant Practice and Procedure in 10 CFR part party.

tkelley on DSK3SPTVN1PROD with NOTICES hazards consideration determination as 2. Interested person(s) should consult a Those permitted to intervene become published in the Federal Register on current copy of 10 CFR 2.309, which is parties to the proceeding, subject to any July 30, 2014. However, on July 29, available at the NRCs PDR. The NRCs limitations in the order granting leave to 2014, the licensee supplemented its regulations are accessible electronically intervene, and have the opportunity to amendment request with a proposed from the NRC Library on the NRCs Web participate fully in the conduct of the change that did increase the scope of the site at http://www.nrc.gov/reading-rm/ hearing with respect to resolution of request and affected the proposed no doc-collections/cfr/. that persons admitted contentions, VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices 47691 including the opportunity to present Secretary has not already established an certificate before a hearing request/

evidence and to submit a cross- electronic docket. petition to intervene is filed so that they examination plan for cross-examination Information about applying for a can obtain access to the document via of witnesses, consistent with NRC digital ID certificate is available on the the E-Filing system.

regulations, policies, and procedures. NRCs public Web site at http:// A person filing electronically using The Atomic Safety and Licensing Board www.nrc.gov/site-help/e-submittals/ the NRCs adjudicatory E-Filing system will set the time and place for any getting-started.html. System may seek assistance by contacting the prehearing conferences and evidentiary requirements for accessing the E- NRC Meta System Help Desk through hearings, and the appropriate notices Submittal server are detailed in the the Contact Us link located on the will be provided. NRCs Guidance for Electronic NRCs public Web site at http://

Hearing requests or petitions for leave Submission, which is available on the www.nrc.gov/site-help/e-to intervene must be filed no later than agencys public Web site at http:// submittals.html, by email to 60 days from the date of publication of www.nrc.gov/site-help/e- MSHD.Resource@nrc.gov, or by a toll-this notice. Requests for hearing, submittals.html. Participants may free call at 1-866-672-7640. The NRC petitions for leave to intervene, and attempt to use other software not listed Meta System Help Desk is available motions for leave to file new or on the Web site, but should note that the between 8 a.m. and 8 p.m., Eastern amended contentions that are filed after NRCs E-Filing system does not support Time, Monday through Friday, the 60-day deadline will not be unlisted software, and the NRC Meta excluding government holidays.

entertained absent a determination by System Help Desk will not be able to Participants who believe that they the presiding officer that the filing offer assistance in using unlisted have a good cause for not submitting demonstrates good cause by satisfying software. documents electronically must file an If a participant is electronically exemption request, in accordance with the three factors in 10 CFR submitting a document to the NRC in 10 CFR 2.302(g), with their initial paper 2.309(c)(1)(i)-(iii).

accordance with the E-Filing rule, the filing requesting authorization to III. Electronic Submissions (E-Filing) participant must file the document continue to submit documents in paper using the NRCs online, Web-based format. Such filings must be submitted All documents filed in NRC submission form. In order to serve by: (1) First class mail addressed to the adjudicatory proceedings, including a documents through the Electronic Office of the Secretary of the request for hearing, a petition for leave Information Exchange System, users Commission, U.S. Nuclear Regulatory to intervene, any motion or other will be required to install a Web Commission, Washington, DC 20555-document filed in the proceeding prior browser plug-in from the NRCs Web 0001, Attention: Rulemaking and to the submission of a request for site. Further information on the Web- Adjudications Staff; or (2) courier, hearing or petition to intervene, and based submission form, including the express mail, or expedited delivery documents filed by interested installation of the Web browser plug-in, service to the Office of the Secretary, governmental entities participating is available on the NRCs public Web Sixteenth Floor, One White Flint North, under 10 CFR 2.315(c), must be filed in site at http://www.nrc.gov/site-help/e- 11555 Rockville Pike, Rockville, accordance with the NRCs E-Filing rule submittals.html. Maryland, 20852, Attention:

(72 FR 49139; August 28, 2007). The E- Once a participant has obtained a Rulemaking and Adjudications Staff.

Filing process requires participants to digital ID certificate and a docket has Participants filing a document in this submit and serve all adjudicatory been created, the participant can then manner are responsible for serving the documents over the internet, or in some submit a request for hearing or petition document on all other participants.

cases to mail copies on electronic for leave to intervene. Submissions Filing is considered complete by first-storage media. Participants may not should be in Portable Document Format class mail as of the time of deposit in submit paper copies of their filings (PDF) in accordance with NRC guidance the mail, or by courier, express mail, or unless they seek an exemption in available on the NRCs public Web site expedited delivery service upon accordance with the procedures at http://www.nrc.gov/site-help/e- depositing the document with the described below. submittals.html. A filing is considered provider of the service. A presiding To comply with the procedural complete at the time the documents are officer, having granted an exemption requirements of E-Filing, at least ten 10 submitted through the NRCs E-Filing request from using E-Filing, may require days prior to the filing deadline, the system. To be timely, an electronic a participant or party to use E-Filing if participant should contact the Office of filing must be submitted to the E-Filing the presiding officer subsequently the Secretary by email at system no later than 11:59 p.m. Eastern determines that the reason for granting hearing.docket@nrc.gov, or by telephone Time on the due date. Upon receipt of the exemption from use of E-Filing no at 301-415-1677, to request (1) a digital a transmission, the E-Filing system longer exists.

identification (ID) certificate, which time-stamps the document and sends Documents submitted in adjudicatory allows the participant (or its counsel or the submitter an email notice proceedings will appear in the NRCs representative) to digitally sign confirming receipt of the document. The electronic hearing docket which is documents and access the E-Submittal E-Filing system also distributes an email available to the public at http://

server for any proceeding in which it is notice that provides access to the ehd1.nrc.gov/ehd/, unless excluded participating; and (2) advise the document to the NRCs Office of the pursuant to an order of the Commission, Secretary that the participant will be General Counsel and any others who or the presiding officer. Participants are submitting a request or petition for have advised the Office of the Secretary requested not to include personal tkelley on DSK3SPTVN1PROD with NOTICES hearing (even in instances in which the that they wish to participate in the privacy information, such as social participant, or its counsel or proceeding, so that the filer need not security numbers, home addresses, or representative, already holds an NRC- serve the documents on those home phone numbers in their filings, issued digital ID certificate). Based upon participants separately. Therefore, unless an NRC regulation or other law this information, the Secretary will applicants and other participants (or requires submission of such establish an electronic docket for the their counsel or representative) must information. However, a request to hearing in this proceeding if the apply for and receive a digital ID intervene will require including VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

47692 Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices information on local residence in order participants are requested not to include related to the issuance of the to demonstrate a proximity assertion of copyrighted materials in their amendments. These documents are interest in the proceeding. With respect submission. available for public inspection online to copyrighted works, except for limited through ADAMS at http://www.nrc.gov/

IV. Availability of Documents excerpts that serve the purpose of the reading-rm/adams.html or in person at adjudicatory filings and would The following table identifies the the NRCs PDR as described previously.

constitute a Fair Use application, documents cited in this document and Adams Document accession No.

U.S. Nuclear Regulatory Commission:

Turkey Point Nuclear Plant, Units 3 and 4UHS Amendment. Dated August 8, 2014 .......................................................... ML14199A107 Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Tem- ML14196A006 perature Limit. Dated July 10, 2014.

Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature LimitRequest for Emer- ML14202A392 gency Approval. Dated July 17, 2014.

Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature LimitSupplement 1, and ML14204A367 Response to Request for Additional Information. Dated July 22, 2014.

Florida Power & Light Company:

Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise ML14204A368 Technical Specifications to Revise Ultimate Heat Sink Temperature Limit. Dated July 22, 2014.

Florida Power & Light Company:

Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Re- ML14206A853 quest No. 231, Application to Revise Ultimate Heat Temperature Limit. Dated July 24, 2014.

Florida Power & Light Company:

Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise ML14210A374 Technical Specifications to Revise Ultimate Heat Sink Temperature Limit. Dated July 26, 2014.

Florida Power & Light Company:

Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise ML14211A507 Technical Specifications to Revise Ultimate Heat Sink Temperature Limit. Dated July 28, 2014.

Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature LimitSupplement 2, and ML14211A508 Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) Dated July 29, 2014.

Florida Power & Light Company:

Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amend- ML14217A341 ment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Dated August 4, 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). [1 of 2] Dated July 18, ML14203A614 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). [2 of 2] Dated July 18, ML14203A618 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 21, 2014 ...... ML14203A620 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 22, 2014 ...... ML14204A814 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 25, 2014 ...... ML14208A010 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 26, 2014 ...... ML14208A011 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 28, 2014 ...... ML14216A072 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated August 3, 2014 .... ML14217A004 U.S. Nuclear Regulatory Commission:

Turkey Point Nuclear Generating Unit Nos. 3 and 4Individual Notice of Consideration of Issuance of Amendments to ML14204A129

  • Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity ML14199A111 **

for Hearing (Exigent Circumstances) (TAC Nos. MF4392 and MF4293). Dated July 24, 2014.

U.S. Nuclear Regulatory Commission:

Public Notice NRC Staff Proposes to Amend Renewed Facility Operating Licenses at the Turkey Point Nuclear Gener- ML14211A266 ating Unit Nos. 3 and 4. Dated July 31, 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point, Units 3 and 4, Environmental Assessment and Finding of No Significant Impact Related to the Ultimate ML14209A031

tkelley on DSK3SPTVN1PROD with NOTICES

  • Letter.
    • Enclosure.

VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices 47693 Dated at Rockville, Maryland, this 8th day (if that document is available in For the Nuclear Regulatory Commission.

of August 2014. ADAMS) is provided in the table in Thomas H. Boyce, For the Nuclear Regulatory Commission. Section iii, Availability of Chief, Regulatory Guidance and Generic Lisa M. Regner, Documents. Issues Branch, Division of Engineering, Office Acting Chief, Plant Licensing Branch II-2, of Nuclear Regulatory Research.

  • NRCs PDR: You may examine and Division of Operating Reactor Licensing, purchase copies of public documents at [FR Doc. 2014-19220 Filed 8-13-14; 8:45 am]

Office of Nuclear Reactor Regulation. BILLING CODE 7590-01-P the NRCs PDR, Room O1-F21, One

[FR Doc. 2014-19282 Filed 8-13-14; 8:45 am]

White Flint North, 11555 Rockville BILLING CODE 7590-01-P Pike, Rockville, Maryland 20852.

OFFICE OF PERSONNEL FOR FURTHER INFORMATION CONTACT: Paul MANAGEMENT NUCLEAR REGULATORY J. Rebstock, Office of Nuclear Regulatory COMMISSION Research, U.S. Nuclear Regulatory Submission for Renewal: Information

[NRC-2014-0163]

Commission, Washington, DC 20555- Collection 3206-0182; Declaration for 0001; telephone: 301-251-7488; email Federal Employment, Optional Form Setpoints for Safety-Related paul.rebstock@nrc.gov. (OF) 306 Instrumentation SUPPLEMENTARY INFORMATION: AGENCY: U.S. Office of Personnel AGENCY: Nuclear Regulatory Management.

I. Background Commission. ACTION: 60-Day Notice and request for ACTION: Draft regulatory guide, public Draft regulatory guide DG-1141 comments.

meeting. describes practices and criteria that the staff of the NRC considers acceptable for

SUMMARY

Federal Investigative Services

SUMMARY

The U.S. Nuclear Regulatory compliance with NRC requirements for (FIS), U.S. Office of Personnel Commission (NRC) plans to hold a ensuring that setpoints for safety related Management (OPM) offers the general public meeting to review draft instruments are initially within, and public and other Federal agencies the regulatory guide (DG) 1141, Setpoints should remain within, technical opportunity to comment on an expiring for Safety-Related Instrumentation. specification limits. This DG also information collection request (ICR),

This DG is proposed Revision 4 of presents practices and criteria for Office of Management and Budget Regulatory Guide (RG) 1.105, Setpoints establishing those technical (OMB) Control No. 3206-0182, for the for Safety-Related Instrumentation. specification limits and ensuring that Declaration for Federal Employment, DATES: The public meeting will be held those limits will adequately support the Optional Form (OF) 306. OPM is on August 14, 2014. See Section II, soliciting comments for this collection proper operation of the associated Public Meeting, of this document for under 44 U.S.C. 3506(c)(2). The Office systemsthat is, that establishing and more information on the meeting. of Management and Budget (OMB) is maintaining setpoints in accordance particularly interested in comments ADDRESSES: Please refer to Docket ID with those limits will provide adequate that:

NRC-2014-0163 when contacting the assurance that a plant will operate as

1. Evaluate whether the proposed NRC about the availability of described in the plant safety analyses.

collection of information is necessary information regarding this document. for the proper performance of the II. Public Meeting You may obtain publicly-available functions of the agency, including information related to this document The public meeting will be held in whether the information will have using any of the following methods: North Bethesda, Maryland, at 11601 practical utility;

  • Federal Rulemaking Web site: Go to Landsdown Street in conference room 2. Evaluate the accuracy of the http://www.regulations.gov and search 1C05 of the 3 White Flint North agencys estimate of the burden of the for Docket ID NRC-2014-0163. Address building adjacent to the White Flint proposed collection of information, questions about NRC dockets to Carol metro station. including the validity of the Gallagher; telephone: 301-287-3422; methodology and assumptions used; email: Carol.Gallagher@nrc.gov. For III. Availability of Documents
3. Enhance the quality, utility, and technical questions, contact the clarity of the information to be individual listed in the FOR FURTHER The NRC is making the documents identified in the following table collected; and INFORMATION CONTACT section of this available to interested persons through 4. Minimize the burden of the document. collection of information on those who
  • NRCs Agencywide Documents one or more of the following methods, as indicted. are to respond, including through the Access and Management System use of appropriate automated, (ADAMS): You may obtain publicly- electronic, mechanical, or other ADAMS acces-available documents online in the Document sion No. technological collection techniques or ADAMS Public Documents collection at other forms of information technology, http://www.nrc.gov/reading-rm/ Draft regulatory guide e.g., permitting electronic submissions adams.html. To begin the search, select DG-1141, Setpoints for of responses.

ADAMS Public Documents and then Safety-Related Instru-select Begin Web-based ADAMS mentation ..................... ML081630179 DATES: Comments are encouraged and will be accepted until October 14, 2014.

tkelley on DSK3SPTVN1PROD with NOTICES Search. For problems with ADAMS, Regulatory Analysis for please contact the NRCs Public DG-1141 ....................... ML101820157 This process is conducted in accordance Document Room (PDR) reference staff at Public Meeting Handout with 5 CFR 1320.8(d).

1-800-397-4209, 301-415-4737, or by for DG-1141 ................. ML14218A012 ADDRESSES: Interested persons are email to pdr.resource@nrc.gov. The invited to submit written comments on ADAMS accession number for each Dated at Rockville, Maryland, this 8th day the proposed information collection to document referenced in this document of August, 2014. the Federal Investigative Services, U.S.

VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

NRC-042 Submitted Nov. 10, 2015 Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices 47689 confirmatory survey to confirm the January 30, 2014. The State had III. Finding of No Significant Impact licensees survey results. Therefore, questions and comments on the On the basis of the EA, the NRC has Radioactive Waste Site RW-06 can be radioactive contaminants as they relate concluded that there are no significant released by the licensee for unrestricted to the release of Site RW-06 for environmental impacts from the use. unrestricted use based on dose. The proposed amendment and has The State of New Mexico was offered Department of the Air Force responded determined not to prepare an an opportunity to review and comment to the States comments by environmental impact statement.

on the draft EA, FONSI, and Technical Memorandum dated April 8, 2014. The Evaluation Report used to support the State had no further comments on this IV. Availability of Documents licensing action. The State provided the EA and FONSI. The ADAMS accession numbers for NRC with comments by letter dated the documents related to this notice are:

ADAMS Document accession No.

U.S. Nuclear Regulatory Commission, NUREG-1575, Revision 1, Multi-Agency Radiation Survey and Site Investigation Manual ML082310759 (MARSSIM), August 2000.

U.S. Nuclear Regulatory Commission, NUREG-1757, Volume 1, Revision 2, Consolidated Decommissioning Guidance, Sep- ML063000243 tember 2006.

U.S. Nuclear Regulatory Commission, NRC Inspection Report 030-28641/11-002, June 29, 2011 ................................................ ML111801367 Department of the Air Force, Final Status Survey Report, Site RW-06, Kirtland Air Force Base, Albuquerque, New Mexico, No- ML11363A116 vember 3, 2011.

U.S. Nuclear Regulatory Commission, Request for Additional Information About the Department of Air Forces Final Status Sur- ML12208A175 vey Report for Site RW-06 at Kirtland Air Force Base, July 26, 2012.

Department of the Air Force, Additional Information to Support Final Status Survey for Site RW-06, Kirtland Air Force Base, ML13186A161 New Mexico, October 11, 2012.

New Mexico Environment Department, Request for Comment on Draft Environmental Assessment for Decommissioning at ML14064A359 Kirtland Air Force Base, January 30, 2014.

Department of the Air Force, Response to Request for Comments on Draft Environmental Assessment for Decommissioning ML14120A421 Kirtland Air Force Base, April 8, 2014.

Dated at Arlington, Texas this 01st day of Specifications (TSs) from 100 to 104 http://www.nrc.gov/reading-rm/

August 2014. degrees Fahrenheit (°F) and revise adams.html. To begin the search, select For the Nuclear Regulatory Commission. surveillance requirements for ADAMS Public Documents and then Ray L. Kellar, monitoring the UHS temperature and select Begin Web-based ADAMS Chief, Repository and Spent Fuel Safety component cooling water (CCW) heat Search. For problems with ADAMS, Branch, Division of Nuclear Materials Safety, exchangers. The amendments also made please contact the NRCs Public Region IV. editorial changes to the TSs. The Staff Document Room (PDR) reference staff at

[FR Doc. 2014-19280 Filed 8-13-14; 8:45 am] finds that the application for the license 1-800-397-4209, 301-415-4737, or by BILLING CODE 7590-01-P amendments complies with the email to pdr.resource@nrc.gov. For the requirements of the Atomic Energy Act convenience of the reader, the ADAMS of 1954, as amended, and the NRCs accession numbers for each document NUCLEAR REGULATORY regulations. referenced in this document (if that COMMISSION document is available in ADAMS) are DATES: A requests for a hearing or

[Docket Nos. 50-250 and 50-251; NRC- petition for leave to intervene must be provided in a table in the Availability 2014-0176] filed by October 14, 2014. of Documents section of this document.

ADDRESSES: Please refer to Docket ID Florida Power & Light Company;

  • NRCs PDR: You may examine and NRC-2014-0176 when contacting the Turkey Point Nuclear Generating Units purchase copies of public documents at NRC about the availability of 3 and 4 the NRCs PDR, Room O1-F21, One information regarding this document.

White Flint North, 11555 Rockville AGENCY: Nuclear Regulatory You may obtain publicly-available Pike, Rockville, Maryland 20852.

Commission. information related to this document using any of the following methods: FOR FURTHER INFORMATION CONTACT:

ACTION: License amendment; issuance,

  • Federal Rulemaking Web site: Go to Audrey Klett, Office of Nuclear Reactor opportunity to request a hearing, and http://www.regulations.gov and search Regulation, U.S. Nuclear Regulatory petition for leave to intervene.

for Docket ID NRC-2014-0176. Address Commission, Washington DC 20555-

SUMMARY

The U.S. Nuclear Regulatory questions about NRC dockets to Carol 0001; telephone: 301-415-0489, email:

Commission (NRC) approved a request Gallagher; telephone: 301-287-3422; Audrey.Klett@nrc.gov.

by Florida Power & Light Company (the email: Carol.Gallagher@nrc.gov. For SUPPLEMENTARY INFORMATION:

licensee) for amendments to Renewed technical questions, contact the I. Introduction Facility Operating License Nos. DPR-31 individual listed in the FOR FURTHER tkelley on DSK3SPTVN1PROD with NOTICES and DPR-41, issued to the licensee for INFORMATION CONTACT section of this The NRC issued amendments to operation of Turkey Point Nuclear document. Renewed Facility Operating License Generating Units 3 and 4 (Turkey Point),

  • NRCs Agencywide Documents Nos. DPR-31 and DPR-41, issued to located in Miami-Dade County, Florida. Access and Management System Florida Power & Light Company, for The amendments revise the ultimate (ADAMS): You may obtain publicly operation of the Turkey Point Nuclear heat sink (UHS) water temperature limit available documents online in the Generating Units 3 and 4, located in in the Turkey Point Technical ADAMS Public Documents collection at Miami-Dade County, Florida. The VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

47690 Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices amendments revise the UHS water significant hazards consideration As required by 10 CFR 2.309, a temperature limit in the Turkey Point published in the Federal Register on request for hearing or petition for leave TSs from 100 to 104 °F and revise July 30, 2014. Therefore, after to intervene must set forth with surveillance requirements for considering the continued exigent particularity the interest of the monitoring the UHS temperature and circumstances related to the dry petitioner in the proceeding and how CCW heat exchangers. The amendments weather, UHS temperature, algae that interest may be affected by the also made editorial changes to the TSs. concentration, and grid reliability, and results of the proceeding. A request for The Staff finds that the application for pursuant to 10 CFR 50.91(a)(6)(i)(B), the hearing or petition for leave to intervene the license amendments complies with Staff used local media to provide must state: (1) The name, address, and the requirements of the Atomic Energy reasonable notice to the public in the telephone number of the requestor or Act of 1954, as amended, and the NRCs area surrounding the licensees facility petitioner; (2) the nature of the regulations. Copies of the Staffs of the amendment request and the requestors/petitioners right under the evaluation may be obtained and proposed determination that no Act to be made a party to the examined at ADAMS Accession No. significant hazards consideration is proceeding; (3) the nature and extent of ML14199A107. involved, and provided a shortened the requestors/petitioners property, In its letters dated July 10, and July comment period. The licensees financial, or other interest in the 17, 2014, the licensee stated that the supplement dated August 4, 2014, proceeding; and (4) the possible effect of UHS temperature has approached the provided additional information that any decision or order which may be current TS limit of 100 °F. The licensee clarified the application, did not expand entered in the proceeding on the stated that the UHS temperature has the scope of the application as noticed requestors/petitioners interest.

been trending higher than historical in the newspapers, and did not change For each contention, the requestor/

averages in part because of reduced the NRC staffs revised proposed no petitioner must provide a specific water levels caused by unseasonably dry significant hazards consideration statement of the issue of law or fact to weather and because of reduced cooling determination as published in the be raised or controverted, as well as a efficiency caused by an algae bloom of newspapers local to the Turkey Point brief explanation of the basis for the concentrations higher than previously site. No comments have been received. contention. Additionally, the requestor/

observed. The licensee requested a Because of the unpredictable nature of petitioner must demonstrate that the timely review of its application to avoid the dry weather, the UHS temperature, issue raised by each contention is a dual unit shutdown that could affect algae concentration, and grid reliability, within the scope of the proceeding and grid reliability. Therefore, the licensee the NRC determined that the exigent is material to the findings that the NRC requested that the NRC process the circumstances remain. Therefore, the must make to support the granting of a license amendment requests under NRC is issuing the amendments prior to license amendment in response to the emergency circumstances in accordance the expiration of the superseded 14-day application. The hearing request or with § 50.91(a)(5) of Title 10 of the Code comment period published in the initial petition must also include a concise of Federal Regulations (10 CFR). The Federal Register notice (FRN) (79 FR statement of the alleged facts or expert Staff considered the circumstances (i.e. 44214, July 30, 2014). No request for a opinion that support the contention and the dry weather, UHS temperature, algae hearing or petition for leave to intervene on which the requestor/petitioner concentration, and grid reliability) and was filed based on the superseded FRN. intends to rely at the hearing, together found exigent circumstances exist, in To prevent any confusion about the time with references to those specific sources that a licensee and the Commission to request a hearing, which may have and documents. The hearing request or must act quickly and that time does not been caused by the original petition must provide sufficient permit the Commission to publish a (superseded) FRN, the NRC is now information to show that a genuine Federal Register notice allowing 30 resetting the period to request a hearing dispute exists with the applicant on a days for prior public comment. The or petition for leave to intervene. material issue of law or fact, including Staff also determined that the references to specific portions of the II. Opportunity To Request a Hearing amendment involves no significant application for amendment that the and Petition for Leave To Intervene hazards considerations. Accordingly, petitioner disputes and the supporting pursuant to 10 CFR 50.91(a)(6)(i)(A), the Within 60 days after the date of reasons for each dispute. If the Commission published a notice of an publication of this Federal Register requestor/petitioner believes that the opportunity for hearing and notice for notice, any person whose interest may application for amendment fails to prior public comment on its proposed be affected by this proceeding and who contain information on a relevant matter determination that no significant desires to participate as a party in the as required by law, the requestor/

hazards consideration is involved; the proceeding must file a written request petitioner must identify each failure and notice was published in the Federal for hearing or a petition for leave to the supporting reasons for the Register on July 30, 2014 (79 FR 44214). intervene specifying the contentions requestors/petitioners belief. Each The licensees supplements dated July which the person seeks to have litigated contention must be one which, if 22, July 24, July 26, and July 28, 2014, in the hearing with respect to the proven, would entitle the requestor/

provided additional information that license amendment request. Requests petitioner to relief. A requestor/

clarified the application, did not expand for hearing and petitions for leave to petitioner who does not satisfy these the scope of the application as originally intervene shall be filed in accordance requirements for at least one contention noticed, and did not change the NRC with the NRCs Agency Rules of will not be permitted to participate as a staffs original proposed no significant Practice and Procedure in 10 CFR part party.

tkelley on DSK3SPTVN1PROD with NOTICES hazards consideration determination as 2. Interested person(s) should consult a Those permitted to intervene become published in the Federal Register on current copy of 10 CFR 2.309, which is parties to the proceeding, subject to any July 30, 2014. However, on July 29, available at the NRCs PDR. The NRCs limitations in the order granting leave to 2014, the licensee supplemented its regulations are accessible electronically intervene, and have the opportunity to amendment request with a proposed from the NRC Library on the NRCs Web participate fully in the conduct of the change that did increase the scope of the site at http://www.nrc.gov/reading-rm/ hearing with respect to resolution of request and affected the proposed no doc-collections/cfr/. that persons admitted contentions, VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices 47691 including the opportunity to present Secretary has not already established an certificate before a hearing request/

evidence and to submit a cross- electronic docket. petition to intervene is filed so that they examination plan for cross-examination Information about applying for a can obtain access to the document via of witnesses, consistent with NRC digital ID certificate is available on the the E-Filing system.

regulations, policies, and procedures. NRCs public Web site at http:// A person filing electronically using The Atomic Safety and Licensing Board www.nrc.gov/site-help/e-submittals/ the NRCs adjudicatory E-Filing system will set the time and place for any getting-started.html. System may seek assistance by contacting the prehearing conferences and evidentiary requirements for accessing the E- NRC Meta System Help Desk through hearings, and the appropriate notices Submittal server are detailed in the the Contact Us link located on the will be provided. NRCs Guidance for Electronic NRCs public Web site at http://

Hearing requests or petitions for leave Submission, which is available on the www.nrc.gov/site-help/e-to intervene must be filed no later than agencys public Web site at http:// submittals.html, by email to 60 days from the date of publication of www.nrc.gov/site-help/e- MSHD.Resource@nrc.gov, or by a toll-this notice. Requests for hearing, submittals.html. Participants may free call at 1-866-672-7640. The NRC petitions for leave to intervene, and attempt to use other software not listed Meta System Help Desk is available motions for leave to file new or on the Web site, but should note that the between 8 a.m. and 8 p.m., Eastern amended contentions that are filed after NRCs E-Filing system does not support Time, Monday through Friday, the 60-day deadline will not be unlisted software, and the NRC Meta excluding government holidays.

entertained absent a determination by System Help Desk will not be able to Participants who believe that they the presiding officer that the filing offer assistance in using unlisted have a good cause for not submitting demonstrates good cause by satisfying software. documents electronically must file an If a participant is electronically exemption request, in accordance with the three factors in 10 CFR submitting a document to the NRC in 10 CFR 2.302(g), with their initial paper 2.309(c)(1)(i)-(iii).

accordance with the E-Filing rule, the filing requesting authorization to III. Electronic Submissions (E-Filing) participant must file the document continue to submit documents in paper using the NRCs online, Web-based format. Such filings must be submitted All documents filed in NRC submission form. In order to serve by: (1) First class mail addressed to the adjudicatory proceedings, including a documents through the Electronic Office of the Secretary of the request for hearing, a petition for leave Information Exchange System, users Commission, U.S. Nuclear Regulatory to intervene, any motion or other will be required to install a Web Commission, Washington, DC 20555-document filed in the proceeding prior browser plug-in from the NRCs Web 0001, Attention: Rulemaking and to the submission of a request for site. Further information on the Web- Adjudications Staff; or (2) courier, hearing or petition to intervene, and based submission form, including the express mail, or expedited delivery documents filed by interested installation of the Web browser plug-in, service to the Office of the Secretary, governmental entities participating is available on the NRCs public Web Sixteenth Floor, One White Flint North, under 10 CFR 2.315(c), must be filed in site at http://www.nrc.gov/site-help/e- 11555 Rockville Pike, Rockville, accordance with the NRCs E-Filing rule submittals.html. Maryland, 20852, Attention:

(72 FR 49139; August 28, 2007). The E- Once a participant has obtained a Rulemaking and Adjudications Staff.

Filing process requires participants to digital ID certificate and a docket has Participants filing a document in this submit and serve all adjudicatory been created, the participant can then manner are responsible for serving the documents over the internet, or in some submit a request for hearing or petition document on all other participants.

cases to mail copies on electronic for leave to intervene. Submissions Filing is considered complete by first-storage media. Participants may not should be in Portable Document Format class mail as of the time of deposit in submit paper copies of their filings (PDF) in accordance with NRC guidance the mail, or by courier, express mail, or unless they seek an exemption in available on the NRCs public Web site expedited delivery service upon accordance with the procedures at http://www.nrc.gov/site-help/e- depositing the document with the described below. submittals.html. A filing is considered provider of the service. A presiding To comply with the procedural complete at the time the documents are officer, having granted an exemption requirements of E-Filing, at least ten 10 submitted through the NRCs E-Filing request from using E-Filing, may require days prior to the filing deadline, the system. To be timely, an electronic a participant or party to use E-Filing if participant should contact the Office of filing must be submitted to the E-Filing the presiding officer subsequently the Secretary by email at system no later than 11:59 p.m. Eastern determines that the reason for granting hearing.docket@nrc.gov, or by telephone Time on the due date. Upon receipt of the exemption from use of E-Filing no at 301-415-1677, to request (1) a digital a transmission, the E-Filing system longer exists.

identification (ID) certificate, which time-stamps the document and sends Documents submitted in adjudicatory allows the participant (or its counsel or the submitter an email notice proceedings will appear in the NRCs representative) to digitally sign confirming receipt of the document. The electronic hearing docket which is documents and access the E-Submittal E-Filing system also distributes an email available to the public at http://

server for any proceeding in which it is notice that provides access to the ehd1.nrc.gov/ehd/, unless excluded participating; and (2) advise the document to the NRCs Office of the pursuant to an order of the Commission, Secretary that the participant will be General Counsel and any others who or the presiding officer. Participants are submitting a request or petition for have advised the Office of the Secretary requested not to include personal tkelley on DSK3SPTVN1PROD with NOTICES hearing (even in instances in which the that they wish to participate in the privacy information, such as social participant, or its counsel or proceeding, so that the filer need not security numbers, home addresses, or representative, already holds an NRC- serve the documents on those home phone numbers in their filings, issued digital ID certificate). Based upon participants separately. Therefore, unless an NRC regulation or other law this information, the Secretary will applicants and other participants (or requires submission of such establish an electronic docket for the their counsel or representative) must information. However, a request to hearing in this proceeding if the apply for and receive a digital ID intervene will require including VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

47692 Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices information on local residence in order participants are requested not to include related to the issuance of the to demonstrate a proximity assertion of copyrighted materials in their amendments. These documents are interest in the proceeding. With respect submission. available for public inspection online to copyrighted works, except for limited through ADAMS at http://www.nrc.gov/

IV. Availability of Documents excerpts that serve the purpose of the reading-rm/adams.html or in person at adjudicatory filings and would The following table identifies the the NRCs PDR as described previously.

constitute a Fair Use application, documents cited in this document and Adams Document accession No.

U.S. Nuclear Regulatory Commission:

Turkey Point Nuclear Plant, Units 3 and 4UHS Amendment. Dated August 8, 2014 .......................................................... ML14199A107 Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Tem- ML14196A006 perature Limit. Dated July 10, 2014.

Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature LimitRequest for Emer- ML14202A392 gency Approval. Dated July 17, 2014.

Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature LimitSupplement 1, and ML14204A367 Response to Request for Additional Information. Dated July 22, 2014.

Florida Power & Light Company:

Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise ML14204A368 Technical Specifications to Revise Ultimate Heat Sink Temperature Limit. Dated July 22, 2014.

Florida Power & Light Company:

Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Re- ML14206A853 quest No. 231, Application to Revise Ultimate Heat Temperature Limit. Dated July 24, 2014.

Florida Power & Light Company:

Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise ML14210A374 Technical Specifications to Revise Ultimate Heat Sink Temperature Limit. Dated July 26, 2014.

Florida Power & Light Company:

Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise ML14211A507 Technical Specifications to Revise Ultimate Heat Sink Temperature Limit. Dated July 28, 2014.

Florida Power & Light Company:

License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature LimitSupplement 2, and ML14211A508 Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) Dated July 29, 2014.

Florida Power & Light Company:

Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amend- ML14217A341 ment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Dated August 4, 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). [1 of 2] Dated July 18, ML14203A614 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). [2 of 2] Dated July 18, ML14203A618 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 21, 2014 ...... ML14203A620 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 22, 2014 ...... ML14204A814 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 25, 2014 ...... ML14208A010 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 26, 2014 ...... ML14208A011 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated July 28, 2014 ...... ML14216A072 U.S. Nuclear Regulatory Commission:

Turkey Point 3 and 4 Request for Additional InformationLAR231 (TAC MF4392 and MF4393). Dated August 3, 2014 .... ML14217A004 U.S. Nuclear Regulatory Commission:

Turkey Point Nuclear Generating Unit Nos. 3 and 4Individual Notice of Consideration of Issuance of Amendments to ML14204A129

  • Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity ML14199A111 **

for Hearing (Exigent Circumstances) (TAC Nos. MF4392 and MF4293). Dated July 24, 2014.

U.S. Nuclear Regulatory Commission:

Public Notice NRC Staff Proposes to Amend Renewed Facility Operating Licenses at the Turkey Point Nuclear Gener- ML14211A266 ating Unit Nos. 3 and 4. Dated July 31, 2014.

U.S. Nuclear Regulatory Commission:

Turkey Point, Units 3 and 4, Environmental Assessment and Finding of No Significant Impact Related to the Ultimate ML14209A031

tkelley on DSK3SPTVN1PROD with NOTICES

  • Letter.
    • Enclosure.

VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1

Federal Register / Vol. 79, No. 157 / Thursday, August 14, 2014 / Notices 47693 Dated at Rockville, Maryland, this 8th day (if that document is available in For the Nuclear Regulatory Commission.

of August 2014. ADAMS) is provided in the table in Thomas H. Boyce, For the Nuclear Regulatory Commission. Section iii, Availability of Chief, Regulatory Guidance and Generic Lisa M. Regner, Documents. Issues Branch, Division of Engineering, Office Acting Chief, Plant Licensing Branch II-2, of Nuclear Regulatory Research.

  • NRCs PDR: You may examine and Division of Operating Reactor Licensing, purchase copies of public documents at [FR Doc. 2014-19220 Filed 8-13-14; 8:45 am]

Office of Nuclear Reactor Regulation. BILLING CODE 7590-01-P the NRCs PDR, Room O1-F21, One

[FR Doc. 2014-19282 Filed 8-13-14; 8:45 am]

White Flint North, 11555 Rockville BILLING CODE 7590-01-P Pike, Rockville, Maryland 20852.

OFFICE OF PERSONNEL FOR FURTHER INFORMATION CONTACT: Paul MANAGEMENT NUCLEAR REGULATORY J. Rebstock, Office of Nuclear Regulatory COMMISSION Research, U.S. Nuclear Regulatory Submission for Renewal: Information

[NRC-2014-0163]

Commission, Washington, DC 20555- Collection 3206-0182; Declaration for 0001; telephone: 301-251-7488; email Federal Employment, Optional Form Setpoints for Safety-Related paul.rebstock@nrc.gov. (OF) 306 Instrumentation SUPPLEMENTARY INFORMATION: AGENCY: U.S. Office of Personnel AGENCY: Nuclear Regulatory Management.

I. Background Commission. ACTION: 60-Day Notice and request for ACTION: Draft regulatory guide, public Draft regulatory guide DG-1141 comments.

meeting. describes practices and criteria that the staff of the NRC considers acceptable for

SUMMARY

Federal Investigative Services

SUMMARY

The U.S. Nuclear Regulatory compliance with NRC requirements for (FIS), U.S. Office of Personnel Commission (NRC) plans to hold a ensuring that setpoints for safety related Management (OPM) offers the general public meeting to review draft instruments are initially within, and public and other Federal agencies the regulatory guide (DG) 1141, Setpoints should remain within, technical opportunity to comment on an expiring for Safety-Related Instrumentation. specification limits. This DG also information collection request (ICR),

This DG is proposed Revision 4 of presents practices and criteria for Office of Management and Budget Regulatory Guide (RG) 1.105, Setpoints establishing those technical (OMB) Control No. 3206-0182, for the for Safety-Related Instrumentation. specification limits and ensuring that Declaration for Federal Employment, DATES: The public meeting will be held those limits will adequately support the Optional Form (OF) 306. OPM is on August 14, 2014. See Section II, soliciting comments for this collection proper operation of the associated Public Meeting, of this document for under 44 U.S.C. 3506(c)(2). The Office systemsthat is, that establishing and more information on the meeting. of Management and Budget (OMB) is maintaining setpoints in accordance particularly interested in comments ADDRESSES: Please refer to Docket ID with those limits will provide adequate that:

NRC-2014-0163 when contacting the assurance that a plant will operate as

1. Evaluate whether the proposed NRC about the availability of described in the plant safety analyses.

collection of information is necessary information regarding this document. for the proper performance of the II. Public Meeting You may obtain publicly-available functions of the agency, including information related to this document The public meeting will be held in whether the information will have using any of the following methods: North Bethesda, Maryland, at 11601 practical utility;

  • Federal Rulemaking Web site: Go to Landsdown Street in conference room 2. Evaluate the accuracy of the http://www.regulations.gov and search 1C05 of the 3 White Flint North agencys estimate of the burden of the for Docket ID NRC-2014-0163. Address building adjacent to the White Flint proposed collection of information, questions about NRC dockets to Carol metro station. including the validity of the Gallagher; telephone: 301-287-3422; methodology and assumptions used; email: Carol.Gallagher@nrc.gov. For III. Availability of Documents
3. Enhance the quality, utility, and technical questions, contact the clarity of the information to be individual listed in the FOR FURTHER The NRC is making the documents identified in the following table collected; and INFORMATION CONTACT section of this available to interested persons through 4. Minimize the burden of the document. collection of information on those who
  • NRCs Agencywide Documents one or more of the following methods, as indicted. are to respond, including through the Access and Management System use of appropriate automated, (ADAMS): You may obtain publicly- electronic, mechanical, or other ADAMS acces-available documents online in the Document sion No. technological collection techniques or ADAMS Public Documents collection at other forms of information technology, http://www.nrc.gov/reading-rm/ Draft regulatory guide e.g., permitting electronic submissions adams.html. To begin the search, select DG-1141, Setpoints for of responses.

ADAMS Public Documents and then Safety-Related Instru-select Begin Web-based ADAMS mentation ..................... ML081630179 DATES: Comments are encouraged and will be accepted until October 14, 2014.

tkelley on DSK3SPTVN1PROD with NOTICES Search. For problems with ADAMS, Regulatory Analysis for please contact the NRCs Public DG-1141 ....................... ML101820157 This process is conducted in accordance Document Room (PDR) reference staff at Public Meeting Handout with 5 CFR 1320.8(d).

1-800-397-4209, 301-415-4737, or by for DG-1141 ................. ML14218A012 ADDRESSES: Interested persons are email to pdr.resource@nrc.gov. The invited to submit written comments on ADAMS accession number for each Dated at Rockville, Maryland, this 8th day the proposed information collection to document referenced in this document of August, 2014. the Federal Investigative Services, U.S.

VerDate Mar<15>2010 16:42 Aug 13, 2014 Jkt 232001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\14AUN1.SGM 14AUN1