MONTHYEARML14314A8722014-07-0101 July 2014 Attachment B: FPL Turkey Point Power Plant Additional Temporary Use of Water Conditions of Certification (PA 03-45D), Sfwmd File 720202-1 Project stage: Request L-2014-216, License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-10010 July 2014 License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Request L-2014-226, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval2014-07-17017 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval Project stage: Request ML14203A6182014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML14203A6142014-07-18018 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI ML15131A5752014-07-18018 July 2014 La - Turkey Point 3 and 4 Request for Additional Information - LAR 231 Project stage: RAI L-2014-221, Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131)2014-07-21021 July 2014 Comment (9) of James M. Petro on Behalf of FPL on Draft Branch Technical Position 8-9, Open Phase Conditions in Electric Power System (Docket Id: NRC-2014-0131) Project stage: Request ML14203A6202014-07-21021 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14204A8142014-07-22022 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-232, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit2014-07-22022 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI L-2014-235, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information2014-07-22022 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information Project stage: Supplement ML14204A1292014-07-24024 July 2014 LTR - Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Sign. Hazards and Opportunity for Hearing (Exigent Circumstances) (TAC No. MF4392-4293) Project stage: Other L-2014-236, Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit2014-07-24024 July 2014 Response to Containment and Ventilation Branch Request for Additional Information, Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Temperature Limit Project stage: Request ML14199A1112014-07-24024 July 2014 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Sign. Hazards and Opportunity for Hearing (Exigent Circumstances) (TAC No. MF4392-4293) Project stage: Other ML14208A0102014-07-25025 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14206A8062014-07-25025 July 2014 Biological Assessment on the American Crocodile for Proposed License Amendment to Increase the Turkey Point Ultimate Heat Sink Temperature Limit Project stage: Other L-2014-249, Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink2014-07-25025 July 2014 Request for Revision of Enforcement Discretion Regarding Technical Specification 3/4.7.4, Ultimate Heat Sink Project stage: Request L-2014-237, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-26026 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14208A0112014-07-26026 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI NRC-2014-0181, Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393)2014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit (TAC Nos. MF4392 and MF4393) Project stage: Other L-2014-253, Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-07-28028 July 2014 Response to Request for Additional Information Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Response to RAI ML14216A0722014-07-28028 July 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI ML14209A0312014-07-28028 July 2014 Environmental Assessment and Finding of No Significant Impact Related to the Ultimate Heat Sink Temperature Limit Project stage: Other L-2014-250, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1)2014-07-29029 July 2014 License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) Project stage: Supplement ML14210A1702014-07-29029 July 2014 Letter from C. Aubrey, Fws, to D. Wrona, NRC, Concurrence with NRCs Biological Assessment Determination and Conclusion of ESA Section 7 Consultation Project stage: Request ML14217A0042014-08-0303 August 2014 NRR E-mail Capture - Turkey Point 3 and 4 Request for Additional Information - LAR 231 (TACs MF4392 and MF4393) Project stage: RAI L-2014-259, Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit2014-08-0404 August 2014 Response to Containment and Ventilation Branch Request for Additional Information (RAI-5), Regarding License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit Project stage: Request ML14199A1072014-08-0808 August 2014 Issuance of Amendments Under Exigent Circumstances Regarding Ultimate Heat Sink and Component Cooling Water Technical Specifications (Tacs MF4392 and MF4393) Project stage: Approval 2014-07-24
[Table View] |
Text
10 CFR 50.90 10 CFR 50.91 L-2014-226 July 17, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating License Nos. DPR-31 and DPR-41
Subject:
License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Request for Emergency Approval
Reference:
Florida Power & Light Company Letter L-2014-216, "License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," dated July 10, 2014 In the referenced letter, Florida Power & Light Company (FPL) requested an amendment to the Technical Specifications (TS) for the Turkey Point Nuclear Plant (Turkey Point), Units 3 and 4 pursuant to 10 CFR 50.90 and 10 CFR 50.91(a)(5). This letter clarifies that the referenced application was not requested to be processed in accordance with the emergency provisions of 10 CFR 50.91(a)(5) at the time of submission. The cited reference to 10 CFR 50.91(a)(5) was an administrative oversight. At this time, however, FPL requests the referenced application be approved on an emergency basis.
The proposed amendment would revise the ultimate heat sink (UHS) water temperature limit from 100°F to 104'F (less instrument uncertainty). The cooling canal system (CCS) temperature has been recently trending higher than historical averages in part due to unseasonably dry weather and has approached the current 1 00°F limit on a few occasions. While this request is not related to the safe operation of the plant, FPL requests a timely review of this application to avoid exceeding the current limit which would necessitate a dual unit shutdown which would impact grid reliability.
The enclosure to this letter contains information for considering the referenced application pursuant to 10 CFR 50.91 (a)(5). The enclosed information does not alter the determination of no significant hazards and the environmental considerations contained in the application.
Florida Power & Light Company 9760 SW 3 44th St., Florida City, FL 33035 4001
.&CLd
Florida Power & Light Company L-2014-226 Page 2 of 2 There are no new commitments made in this submission.
In accordance with 10 CFR 50.91 (b)(1), a copy of this letter is being forwarded to the State Designee of Florida.
If you have any questions or require additional information, please contact Mr. Robert Tomonto at 305-246-7327.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: 7// 7//4 Very truly yours, Michael Kiley Vice President Turkey Point Nuclear Plant
Enclosure:
Basis for Emergency - Application to Revise Ultimate Heat Sink Temperature Limit cc:
USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health
Florida Power & Light Company L-2014-226 Enclosure Page 1 of 2 Turkey Point Units 3 and 4 Basis for Emergency Concerning License Amendment Request No. 231 Application to Revise Ultimate Heat Sink Temperature Limit
1.0 Background
An algae bloom in the Turkey Point cooling canal system (CCS) has reached a level of cell concentration that is reducing cooling efficiency. Along with reduced water levels due to lower than normal rainfall, the CCS is experiencing cell concentrations of algae higher than previously observed, as well as, occurring earlier in the year than previous blooms.
Turkey Point Technical Specification (TS) 3/4.7.4 Limiting Condition for Operation (LCO) limits CCS (Ultimate Heat Sink) temperature to less than or equal to 100 degrees Fahrenheit (°F). CCS temperature has recently approached the limit (e.g. 99.612 'F on 6/25/14 and 99.713 'F on 6/29/14, as recorded in Plant Data System). Algae presence has the potential to increase solar radiation and thermal stratification of the CCS, which likely contributes to an increase in CCS temperature.
Florida Power & Light Company (FPL) has undertaken a comprehensive study to determine the cause of the algae bloom and CCS water changes, and to determine actions to avoid this condition.
Among the recommended actions taken, FPL has initiated a biocide treatment plan in order to reduce the algae and restore the heat transfer characteristics of the CCS water (Reference 2). This treatment plan has received approval from the Florida Department of Environmental Protection and is following a well-established protocol.
In addition, analyses were conducted to determine if the TS 3/4.7.4 temperature limit could be increased without adversely impacting safety or adjacent habitat, and as a result of the findings, a license amendment application was submitted to increase the limit to 104'F (Reference 1).
2.0 Impact of Exceeding the 100F TS Limit If the limit of l00F in TS LCO 3/4.7.4 is exceeded, the current TS requires both units to be placed in at least HOT STANDBY within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Loss of load and voltage control from the Turkey Point nuclear units during periods of high summer demand would result in impacts to grid reliability.
3.0 Reason the Emergency Cannot be Avoided The current condition of the Turkey Point CCS is a new condition that has not been experienced before. FPL has taken prompt, preventative action to address the CCS water condition as discussed above in Section 1.0, including the analyses to support increasing the ultimate heat sink temperature limit.. Furthermore, strong electric demand due to high summer temperatures and humidity are forecasted to continue. For these reasons, FPL requests the NRC staff to consider the reference application on an emergency basis.
Florida Power & Light Company Enclosure L-2014-226 Page 2 of 2 4.0 References
- 1. Florida Power & Light Company Letter L-2014-216, "License Amendment Request No. 231, Application to Revise Technical Specifications to Revise Ultimate Heat Sink Temperature Limit," dated July 10, 2014
- 2. Florida Power & Light Company Letter L-2014-223, "Approval of the Request for the use of Copper Sulfate, Hydrogen Peroxide and A Bio-Stimulant in the Treatment and Control of Blue Green Algae in the Cooling Canal System (CCS) -NRC Notification," dated July 15, 2014