ML15314A619

From kanterella
Jump to navigation Jump to search
FPL-020 - Figure Excerpted from 2014 Uprate Monitoring Program Showing Biscayne Aquifer Salinity
ML15314A619
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/31/2014
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28500
Download: ML15314A619 (1)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-52 Figure 2.1-18. Average and Standard Deviation of Salinity (PSS-78) for Groundwater Stations.

FPL-020

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-52 Figure 2.1-18. Average and Standard Deviation of Salinity (PSS-78) for Groundwater Stations.

FPL-020