MONTHYEARCNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) Project stage: Request CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report2015-04-0707 April 2015 Guarantee of Payment of Deferred Premiums - 2014 Annual Report Project stage: Request CNL-15-077, Correction to Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03)2015-04-28028 April 2015 Correction to Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) Project stage: Request CNL-15-079, Reply to Notice of Violation (EA-14-179)2015-05-0101 May 2015 Reply to Notice of Violation (EA-14-179) Project stage: Other ML15121A8262015-05-0101 May 2015 Annual Radioactive Effluent Release Report - 2014 Project stage: Request ML15127A2502015-05-14014 May 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Application to Increase Tritium Production Absorbing Rods Project stage: Acceptance Review CNL-15-092, Response to NRC Request to Supplement the Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03)2015-05-27027 May 2015 Response to NRC Request to Supplement the Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) Project stage: Supplement CNL-15-093, Response to NRC Request to Supplement Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Radiological Protection and Radiological Consequences2015-06-15015 June 2015 Response to NRC Request to Supplement Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Radiological Protection and Radiological Consequences Project stage: Supplement CNL-15-104, Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan2015-06-15015 June 2015 Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan Project stage: Request ML15173A0972015-06-26026 June 2015 Acceptance Review Results for Requested License Amendment to Increase Tpbar Production Project stage: Acceptance Review ML15173A1142015-06-26026 June 2015 Letter for Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML15173A1162015-06-26026 June 2015 FRN for Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML15225A3772015-08-12012 August 2015 Tennessee Valley Authority Presentation to NRC on Tpbar LAR 8-12-15 Project stage: Other ML15226A4662015-08-14014 August 2015 NRR E-mail Capture - Request for Additional Information Regarding Tritium Production License Amendment Project stage: RAI ML15236A3152015-08-24024 August 2015 NRR E-mail Capture - Watts Bar Unit 1- Draft RAIs- Tpbars Amendment MF6050 Project stage: Draft Other ML15238A5782015-08-25025 August 2015 NRR E-mail Capture - Watts Bar 1- Final Rad Protection RAIs for MF6050 Project stage: RAI CNL-15-172, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Response to NRC Request for Additional Information - Reactor Systems Branch2015-09-14014 September 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Response to NRC Request for Additional Information - Reactor Systems Branch Project stage: Response to RAI ML15225A3752015-09-17017 September 2015 August 12, 2015 - Summary of Public Meeting Regarding Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Increase Tritium Production Project stage: Meeting CNL-15-192, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch2015-09-25025 September 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch Project stage: Response to RAI ML15278A0482015-10-0202 October 2015 NRR E-mail Capture - Tpbar RAIs Part 3b- Arcb Project stage: RAI ML15286A0012015-10-0909 October 2015 NRR E-mail Capture - Regulatory Audit Plan - TVA License Amendment Request Regarding Tritium Producing Burnable Absorber Rods - CAC No. MF6050 Project stage: Other CNL-15-232, Attachment 1, CE-15-588-NP-Attachment, Rev. 1 and Attachment 3, CE-15-611-NP-Attachment Regarding Proposed Response to NRC RAIs Nos. 1, 2, 3, and 4 Regarding LAR for Increasing the Maximum Number of Tpbars in Watts Bar, Unit 1. (Non-Propr2015-11-30030 November 2015 Attachment 1, CE-15-588-NP-Attachment, Rev. 1 and Attachment 3, CE-15-611-NP-Attachment Regarding Proposed Response to NRC RAIs Nos. 1, 2, 3, and 4 Regarding LAR for Increasing the Maximum Number of Tpbars in Watts Bar, Unit 1. (Non-Proprie Project stage: Response to RAI CNL-15-216, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) (TAC No. MF6050) - Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch2015-12-22022 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) (TAC No. MF6050) - Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch Project stage: Response to RAI ML15345A4242015-12-23023 December 2015 Audit Report Related to License Amendment Request to Revise Technical Specification 4.2.1, Fuel Assemblies Project stage: Other CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory Project stage: Supplement CNL-16-030, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) (TAC No. MF6050) - Supplement to Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch2016-02-22022 February 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) (TAC No. MF6050) - Supplement to Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch Project stage: Supplement ML16063A0362016-03-21021 March 2016 Summary of Public Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Increase Tritium Production Project stage: Meeting CNL-16-038, Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information2016-03-31031 March 2016 Application to Revise Technical Specification 4.2.1, Fuel Assemblies and Radioactive Waste System Design Basis Source Term Supplement to Response to NRC Request for Additional Information Project stage: Supplement ML16084A7932016-04-15015 April 2016 License Amendment Application; Opportunity for a Hearing and to Petition for Leave; Correction Project stage: Other ML16084A7702016-04-15015 April 2016 Correction of Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML16138A0202016-06-23023 June 2016 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Technical Specification 4.2.1, Fuel Assemblies Project stage: Other ML16214A1342016-07-29029 July 2016 Individual Notice of Issuance of Amendment to Facility Operating License Project stage: Approval ML16159A0712016-07-29029 July 2016 Cover Letter for Individual Notice Project stage: Other ML16159A0572016-07-29029 July 2016 Issuance of Amendment Regarding Revised Technical Specification 4.2.1 Fuel Assemblies to Increase the Maximum Number of Tritium Producing Burnable Absorber Rods Project stage: Approval 2015-06-26
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
George, Andrea Sent:
Friday, October 09, 2015 9:59 AM To:
cwszabo@tva.gov Cc:
'garent@tva.gov'; tahess@tva.gov; Dion, Jeanne
Subject:
Regulatory Audit Plan - TVA License Amendment Request Regarding Tritium Producing Burnable Absorber Rods - CAC No. MF6050 Attachments:
WBN1Audit_MF6050.docx Good morning, By letter dated March 31, 2015, as supplemented by letter dated September 14, 2015, Tennessee Valley Authority (TVA, the licensee), requested an amendment to the Technical Specifications (TSs) to increase the maximum number of Tritium Producing Burnable Absorber Rods (TPBARs) that can be irradiated per cycle.
The proposed change increases the maximum number of TPBARs given in TS 4.2.1 that can be loaded for a single cycle from 704 to 1,792. This amendment would also revise Surveillance Requirements 3.5.1.4 and 3.5.4.3 to delete outdated information.
Based on the information submitted by the licensee, certain assumptions related to lithium leaching during post-Loss of Coolant Accident (LOCA) scenarios are based on a series of tests performed at the Pacific Northwest National Laboratory. Since the amount of lithium available for neutron capture in the reactor core is a significant input to the post-LOCA subcriticality assessment, the staff has requested an audit of the test facilities and documentation. A proposed audit plan is attached.
If you have any questions, please contact the NRC Project Manager, Jeanne Dion, at 301-415-1349 or Jeanne.Dion@nrc.gov.
Thank you, Andrea George Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing andrea.george@nrc.gov 301-415-1081
Hearing Identifier:
NRR_PMDA Email Number:
2442 Mail Envelope Properties (Andrea.George@nrc.gov20151009095900)
Subject:
Regulatory Audit Plan - TVA License Amendment Request Regarding Tritium Producing Burnable Absorber Rods - CAC No. MF6050 Sent Date:
10/9/2015 9:59:20 AM Received Date:
10/9/2015 9:59:00 AM From:
George, Andrea Created By:
Andrea.George@nrc.gov Recipients:
"'garent@tva.gov'" <garent@tva.gov>
Tracking Status: None "tahess@tva.gov" <tahess@tva.gov>
Tracking Status: None "Dion, Jeanne" <Jeanne.Dion@nrc.gov>
Tracking Status: None "cwszabo@tva.gov" <cwszabo@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1481 10/9/2015 9:59:00 AM WBN1Audit_MF6050.docx 23382 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
ENCLOSURE AUDIT PLAN FOR TRITIUM PRODUCING BURNABLE ABSORBER RODS (TPBARS)
LICENSE AMENDMENT REQUEST WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-0390 CAC NO. MF6050 BACKGROUND AND AUDIT BASES By letter dated March 31, 2015, Tennessee Valley Authority (TVA) submitted a license amendment request (LAR) for Watts Bar Nuclear Plant, Unit 1 (Agencywide Documents Access and Management System Accession No. ML15098A446) to the Nuclear Regulatory Commission (NRC).
The proposed LAR would revise Technical Specification (TS) 4.2.1, "Fuel Assemblies;" TS 3.5.1 "Accumulators;" Surveillance Requirement (SR) 3.5.1.4; TS 3.5.4, "Refueling Water Storage Tank;"
and SR 3.5.4.3, to increase the maximum number of tritium producing burnable absorber rods (TPBARs) and to delete outdated information related to the tritium production program.
On August 14, 2015, the NRC staff requested additional information needed to complete its review (ADAMS Accession No. ML15226A466). TVA submitted the response to the RAIs by letter dated September 14, 2015 (ADAMS Accession No. ML15258A204). In RAI item 2, the staff requested more information regarding revised lithium leaching assumptions used in the post-Loss of Coolant Accident (LOCA) subcriticality assessment referenced in the March 31, 2015 LAR. The licensee stated that the assumptions were based on a series of tests performed at the Pacific Northwest National Laboratory (PNNL).
The NRC staff will use the following requirements and guidance to conduct the regulatory audit:
Title 10 of the Code of Federal Regulations (10 CFR), Section 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.
Appendix A to 10 CFR 50, General Design Criteria for Nuclear Power Plants.
NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition, dated March 2007.
AUDIT SCOPE The onsite regulatory audit will be performed per Office Instruction LIC-111, Regulatory Audits, to support the staffs safety review of TVAs discussion of the use of TPBAR leaching tests to support analysis assumptions in the subject LAR. The purpose of the regulatory audit is to obtain and review information regarding how TVA resolved item 2 in the staffs RAI dated August 14, 2015, regarding the leach rate tests.
NRC AUDIT TEAM S. Krepel, DSS J. Dion, DORL PM OBSERVERS Two sign language interpreters (TBD)
LOGISTICS The regulatory audit will be conducted at the Pacific Northwest National Laboratories on November 3 and 4, 2015. Entrance and exit briefings will be held with the licensee at the beginning and end of the audit, respectively, as well as daily briefings of team activities.
Additional details will be addressed over the phone.
The NRC audit team would like the opportunity to view the testing equipment used to conduct the leaching tests and TPBAR bursting tests referenced by TVA in their LAR and RAI response.
A staff member with knowledge of the testing configuration is requested to be available to address questions that the NRC audit team may have while inspecting the testing equipment.
Once the tour of the testing facilities is complete, a private conference room is requested for NRC audit team use with access to audit documentation upon arrival and as needed.
DELIVERABLES An audit summary or safety evaluation will be issued to the licensee within 45 days from the end of the audit.
INFORMATION NEEDS The NRC audit team would like access to all test documentation, including test specifications, deviations from procedure, observations, test results, and any analysis performed on the raw data. The scope of this audit is expected to include all lithium leaching tests and TPBAR bursting tests.
In addition, PNNL and TVA staff with familiarity of the tests and how the results are being applied to the post-LOCA reactor core environment should be available to provide clarification or respond to questions as necessary.