ML15259A410

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - LIC-109 Acceptance Review - Duane Arnold Energy Center (DAEC) LAR (TSCR-143) to Extend Containment Leakage Test Frequency - MF6619
ML15259A410
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/15/2015
From: Mahesh Chawla
Plant Licensing Branch III
To: Swenzinski L
Nebraska Public Power District (NPPD)
References
TAC MF6619
Download: ML15259A410 (2)


Text

NRR-PMDAPEm Resource From: Chawla, Mahesh Sent: Tuesday, September 15, 2015 4:04 PM To: laura.swenzinski@nexteraenergy.com; Davis, J.Michael (J.Michael.Davis@nexteraenergy.com); Cross, William (WILLIAM.CROSS@fpl.com)

Cc: West, Khadijah; Elliott, Robert; Dennig, Robert; Nold, David; Hoang, Dan; Lupold, Timothy; Rosenberg, Stacey; Reisifard, Mehdi; Bloom, Steven; Pelton, David

Subject:

LIC-109 Acceptance Review - Duane Arnold Energy Center (DAEC) LAR (TSCR-143) to Extend Containment Leakage Test Frequency - MF6619 By letter dated August 18, 2015 (ADAMS Accession No. ML15246A445), NextEra Energy Duane Arnold, LLC (NextEra Energy Duane Arnold) (the licensee) submitted a license amendment request for Duane Arnold Energy Center (DAEC). The proposed amendment revises Technical Specifications (TS) Section 5.5.12, "Primary Containment Leakage Rate Testing Program," by requiring compliance with Nuclear Energy Institute (NEI) topical report NEI 94-01, Revision 3-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," instead' of Regulatory Guide 1.163, "Performance Based Containment Leak Test Program," including exemption 1.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me @ (301) 415-8371 or Mahesh.chawla@nrc.gov Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2385 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20150915160400)

Subject:

LIC-109 Acceptance Review - Duane Arnold Energy Center (DAEC) LAR (TSCR-143) to Extend Containment Leakage Test Frequency - MF6619 Sent Date: 9/15/2015 4:04:09 PM Received Date: 9/15/2015 4:04:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:

"West, Khadijah" <Khadijah.West@nrc.gov>

Tracking Status: None "Elliott, Robert" <Robert.Elliott@nrc.gov>

Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov>

Tracking Status: None "Nold, David" <David.Nold@nrc.gov>

Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov>

Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov>

Tracking Status: None "Rosenberg, Stacey" <Stacey.Rosenberg@nrc.gov>

Tracking Status: None "Reisifard, Mehdi" <Mehdi.Reisifard@nrc.gov>

Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov>

Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>

Tracking Status: None "laura.swenzinski@nexteraenergy.com" <laura.swenzinski@nexteraenergy.com>

Tracking Status: None "Davis, J.Michael (J.Michael.Davis@nexteraenergy.com)" <J.Michael.Davis@nexteraenergy.com>

Tracking Status: None "Cross, William (WILLIAM.CROSS@fpl.com)" <WILLIAM.CROSS@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2498 9/15/2015 4:04:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: