Request for Withdrawal of Document Pages from the NRC Agencywide Documents Access and Management System (ADAMS)
ML15244B183
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 08/24/2015
From: Mark D. Sartain
Dominion, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-397
Download: ML15244B183 (3)


Text

Innsbrook Technical Center"_Z 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 August 24, 2015 U. S. Nuclear Regulatory Commission Serial No.: 15-397 Attention: Document Control Desk NL&OS/DEA: RO Washington, DC 20555-0001 Docket Nos.: 50-338/339 50-280/281 5 0-3 36/42 3 License Nos.: NPF-4/7 DPR-32/37 DPR-65/NPF-49 VIRGINIA ELECTRIC AND POWER COMPANY DOMINION NUCLEAR CONNECTICUT. INC.

NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS I AND 2 MILLSTONE POWER STATION UNITS 2 AND 3 REQUEST FOR WITHDRAWAL OF DOCUMENT PAGES FROM THE NUCLEAR REGULATORY COMMISSION (NRC) AGENCYWlDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)

By letters dated February 26, 2003 (Serial No.03-051) (ADAMS Accession No. ML030690373) and February 27, 2007 (Serial No. 07-0089) (ADAMS Accession No. ML071140441) Dominion submitted the results of steam generator tube inspections performed at North Anna Power Station.

By letters dated February 26, 2003 (Serial No.03-072) (ADAMS Accession No. ML030690393), February 28, 2006 (Serial No.06-174) (ADAMS Accession No. ML060600281), and March 1, 2007 (Serial No. 07-0099) (ADAMS Accession No. ML070650263), Virginia Electric and Power Company (Dominion) submitted steam generator tube inspection reports for Surry Power Station.

By letters dated April 11, 2008 (Serial No. 07-0743) (ADAMS Accession No.

ML081140138), October 24, 2008 (Serial No. 08-0627) (ADAMS Accession No.

ML083090396), March 13, 2009 (Serial No.09-125) (ADAMS Accession No.

ML090850344), October 28, 2010 (Serial No.10-632) (ADAMS Accession No.

ML103130038), October 17, 2011 (Serial No.11-533) (ADAMS Accession No.

ML11291A044), April 6, 2012 (Serial No.12-123) (ADAMS Accession No.

ML12109A044), October 2, 2013 (Serial No.13-500) (ADAMS Accession No.

ML13284A065), June 26, 2014 (Serial No.14-265) (ADAMS Accession No.

ML14188B190), and February 9, 2015 (Serial No.15-005) (ADAMS Accession No.

ML15050A041), Dominion Nuclear Connecticut, Inc. submitted steam generator tube inspection reports for Millstone Power Station.

Serial No.15-397 Docket Nos.: 50-338/339 50-280/281 50-336/423 Page 2 of 3 The above reports satisfied the requirements of Technical Specification 5.6.7.b for North Anna Power Station Units I and 2, Technical Specification 4.19.F.b for Surry Power Station Units 1 and 2, Technical Specification 6.9.1.9 for Millstone Power Station Unit 2, and Technical Specification 6.9.1.7 for Millstone Power Station Unit 3, which required submittal of an Annual Steam Generator Inservice Inspection Summary Report to the NRC.

Dominion requests that the NRC withdraw the following pages from ADAMS since they contain a Westinghouse Proprietary Class 2 schematic of a steam generator or a portion thereof:

  • Page 22 of the February 26, 2003 letter (Serial No.03-072)
  • Page 15 of the February 26, 2003 letter (Serial No.03-051)
  • Page 23 of the February 28, 2006 letter (Serial No.06-174)
  • Pages 15 and 31 of the February 27, 2007 letter (Serial No. 07-0089)
  • Pages 31 and 59 of the March 1, 2007 letter (Serial No. 07-0099)
  • Page 33 of the March 13, 2009 letter (Serial No. 09-1 25)
  • Page 27 of the October 28, 2010 letter (Serial No.10-632)
  • Page 16 of the October 7, 2011 letter (Serial No.11-533)
  • Page 23 of the April 6, 2012 letter (Serial No.12-123)
  • Page 16 of the October 2, 2013 letter (Serial No.13-500)
  • Page 14 of the June 26, 2014 letter (Serial No.14-265)
  • Page 20 of the February 9, 2015 letter (Serial No.15-005)

Upon removal of the indicated pages, public availability of the above letters will be acceptable.

Should you have any questions or require additional information, please contact Ms. Diane E. Aitken at (804) 273-2694.

Respectfully, Mark D. Sartain Vice President - Nuclear Engineering Virginia Electric and Power Company Dominion Nuclear Connecticut, Inc.

Commitments contained in this letter: None

Serial No.15-397 Docket Nos.: 50-338/339 50-280/281 50-336/423 Page 3 of 3 cc: U. S. Nuclear Regulatory Commission, Region I Regional Administrator 2100 Renaissance Blvd.

Suite 100 King of Prussia, PA 19406-2713 U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Ms. Karen Cotton Gross NRC Project Manager - Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas NRC Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Mr. R. Guzman NRC Senior Project Manager Millstone Units 2 and 3 U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Millstone Power Station