NL-12-032, Official Exhibit - ENT000381-00-BD01 - NL-12-032, Letter from F. Dacimo, Entergy, to NRC, Correction to Previous Response Regarding Unit 1 Buried Piping (Jan. 30 2012)

From kanterella
(Redirected from NL-12-032)
Jump to navigation Jump to search
Official Exhibit - ENT000381-00-BD01 - NL-12-032, Letter from F. Dacimo, Entergy, to NRC, Correction to Previous Response Regarding Unit 1 Buried Piping (Jan. 30 2012)
ML12339A466
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/30/2012
From:
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
SECY RAS
References
RAS 22150, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, NL-12-032
Download: ML12339A466 (2)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000381-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn: ENT000381 Rejected: Stricken: Submitted : March 30, 2012 Other:

Entergy Nuclear Northeast Indian Point Energy Center

~Entergy:

450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 Fred Dacimo Vice President Operations License Renewal NL-12-032 January 30, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos.50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64

REFERENCE:

1. NRC Letter dated December 30,2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application - Miscellaneous Items"
2. Entergy letter (NL-09-018)," Reply to Request for Additional Information - Miscellaneous Items," dated January 27,2009
3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application - Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event"
4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009

Dear Sir or Madam:

Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and Attachment 2, to the response provided by references 2 and 4 for license renewal apl)iicatic)n 1-IP2. discovered an omission the response to for Inf,... rl"l'l~tlnn 3.4.2-1, and 3.4.2-2. This condition was recorded in Corrective Action Prr\"'I'"<:trYI Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event. Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added to the new LRA Table 3.4.2-5-11-IP2. The table identified outdoor air as the external for the In accordance with this

is buried and line items of piping and bolting with 3.4.2-5-11-IP2. Appendix B.1.6 of the license rer water system in the list of systems containing con Tanks Inspection Program. The buried piping in 1 management review had been included and reme established in response to the industry initiative 0 If you have any questions, or require additional in at 914-254-6710.

I declare under penalty of perjury that the foregoil

rc..~\.tt\.,,'n 3Q ) 2d 1 'l-