Letter Sequence Request |
---|
TAC:MF6478, Generic Letter 2008-01, Managing Gas Accumulation (Approved, Closed) |
|
|
|
---|
Category:Letter type:SBK
MONTHYEARSBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22042, 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 72022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic 2024-04-12
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements2022-12-0909 December 2022 License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating ML20120A0472020-04-29029 April 2020 Correction to Amendment No. 162 Issued November 18, 2019, Revisions to Technical Specifications Associated with Movable Control Rods SBK-L-20001, License Amendment Request 19-03, Application to Revise Degraded Voltage Time Delay Setpoint2020-01-24024 January 2020 License Amendment Request 19-03, Application to Revise Degraded Voltage Time Delay Setpoint SBK-L-18089, License Amendment Request 17-06, Change to the Technical Specification Requirements for Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation to Implement WCAP-14333 and WCAP-153762019-11-0101 November 2019 License Amendment Request 17-06, Change to the Technical Specification Requirements for Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation to Implement WCAP-14333 and WCAP-15376 SBK-L-19104, License Amendment Request 19-02, One-Time Change to the Seabrook Technical Specifications Onsite Power Distribution Requirements2019-10-0303 October 2019 License Amendment Request 19-02, One-Time Change to the Seabrook Technical Specifications Onsite Power Distribution Requirements SBK-L-19049, License Amendment Request 19-01, Application to Revise the Technical Specifications Associated with Emergency Core Cooling System Accumulators2019-06-0404 June 2019 License Amendment Request 19-01, Application to Revise the Technical Specifications Associated with Emergency Core Cooling System Accumulators SBK-L-18151, Supplement 61 - Additional Changes to the NextEra Energy Seabrook License Renewal Application2018-08-29029 August 2018 Supplement 61 - Additional Changes to the NextEra Energy Seabrook License Renewal Application L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-18075, Eighth Annual Update to License Renewal Application2018-05-0101 May 2018 Eighth Annual Update to License Renewal Application SBK-L-18013, Nextera Energy Seabrook - License Amendment Request 18-01, Application to Revise Frequencies in the Control Room Habitability Program2018-03-16016 March 2018 Nextera Energy Seabrook - License Amendment Request 18-01, Application to Revise Frequencies in the Control Room Habitability Program SBK-L-18006, Additional Change to Seventh Annual Update to the NextEra Energy Seabrook License Renewal Application2018-01-23023 January 2018 Additional Change to Seventh Annual Update to the NextEra Energy Seabrook License Renewal Application SBK-L-17185, License Amendment Request 17-04: Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications2017-12-0101 December 2017 License Amendment Request 17-04: Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications SBK-L-17163, Supplement 57 - Revision to License Renewal Application 10 CFR 50 Appendix J Program2017-10-0606 October 2017 Supplement 57 - Revision to License Renewal Application 10 CFR 50 Appendix J Program SBK-L-17081, License Amendment Request 17-02, Change to the Technical Specifications Requirement for DC Batteries2017-07-28028 July 2017 License Amendment Request 17-02, Change to the Technical Specifications Requirement for DC Batteries SBK-L-17108, Supplement 56 - Revision to License Renewal ASME Section XI, Subsection Iwl, Program Operating Experience2017-07-20020 July 2017 Supplement 56 - Revision to License Renewal ASME Section XI, Subsection Iwl, Program Operating Experience L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency SBK-L-16181, License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program2016-12-23023 December 2016 License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program SBK-L-16146, Sixth Annual Update to the Renewal Application2016-10-0707 October 2016 Sixth Annual Update to the Renewal Application SBK-L-16013, License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program2016-08-0909 August 2016 License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 ML15310A1022015-11-19019 November 2015 License Renewal Application Online Reference Portal SBK-L-15187, Supplement 43 - Responses to Request for Additional Information Related to the Review of the License Renewal Application - Set 242015-10-0909 October 2015 Supplement 43 - Responses to Request for Additional Information Related to the Review of the License Renewal Application - Set 24 SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 SBK-L-14155, License Amendment Request 14-06 - Change to the Technical Specifications to Remove the Cold Leg Injection Permissive (P-15)2014-09-24024 September 2014 License Amendment Request 14-06 - Change to the Technical Specifications to Remove the Cold Leg Injection Permissive (P-15) SBK-L-14126, Station,Proposed Change to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement2014-07-24024 July 2014 Station,Proposed Change to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement SBK-L-14080, Changes to Technical Specification 3.3.3.1. Radiation Monitoring for Plant Operations2014-07-24024 July 2014 Changes to Technical Specification 3.3.3.1. Radiation Monitoring for Plant Operations ML14167A4302014-06-12012 June 2014 Supplement to License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology SBK-L-14086, Nextera Energy Seabrook - Letter Regarding Response to Requests for Additional Information for the Review of the License Renewal Application Set 20 Relating to the Alkali-Silica Reaction (ASR) Monitoring Program2014-05-15015 May 2014 Nextera Energy Seabrook - Letter Regarding Response to Requests for Additional Information for the Review of the License Renewal Application Set 20 Relating to the Alkali-Silica Reaction (ASR) Monitoring Program SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-13121, License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology2013-09-10010 September 2013 License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology SBK-L-13030, LAR 13-02 - Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-03-27027 March 2013 LAR 13-02 - Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process SBK-L-13028, License Amendment Request 13-01 Application for Administrative Change and Corrections to the Technical Specifications2013-03-0101 March 2013 License Amendment Request 13-01 Application for Administrative Change and Corrections to the Technical Specifications SBK-L-12235, License Amendment Request 12-06, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process2012-12-20020 December 2012 License Amendment Request 12-06, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process SBK-L-12186, Second Annual Update to the NextEra Energy Seabrook License Renewal Application2012-09-18018 September 2012 Second Annual Update to the NextEra Energy Seabrook License Renewal Application SBK-L-12105, License Amendment Request 12-03, Cyber Security Plan Implementation Schedule Milestone Change2012-06-20020 June 2012 License Amendment Request 12-03, Cyber Security Plan Implementation Schedule Milestone Change 2024-09-25
[Table view] Category:Technical Specification
MONTHYEARL-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-19129, Submittal of Changes to the Seabrook Station Technical Specification Bases2019-12-31031 December 2019 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-18195, Submittal of Changes to the Seabrook Station Technical Specification Bases2018-12-18018 December 2018 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-17208, Submittal of Changes to the Seabrook Station Technical Specification Bases2017-12-14014 December 2017 Submittal of Changes to the Seabrook Station Technical Specification Bases L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process SBK-L-16206, Submittal of Changes to Technical Specification Bases Dated 12/21/20162016-12-21021 December 2016 Submittal of Changes to Technical Specification Bases Dated 12/21/2016 SBK-L-15228, Submittal of Changes to the Technical Specification Bases2016-01-0505 January 2016 Submittal of Changes to the Technical Specification Bases SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 SBK-L-14231, Submittal of Changes to Technical Specification Bases2014-12-18018 December 2014 Submittal of Changes to Technical Specification Bases ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-12265, Submittal of Changes to the Technical Specification Bases2012-12-19019 December 2012 Submittal of Changes to the Technical Specification Bases SBK-L-12052, Submittal of Changes to Technical Specification Bases2012-02-16016 February 2012 Submittal of Changes to Technical Specification Bases SBK-L-11066, License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation2011-04-21021 April 2011 License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation SBK-L-10236, Submittal of Changes to the Technical Specification Bases2010-12-30030 December 2010 Submittal of Changes to the Technical Specification Bases SBK-L-09269, Submittal of Changes to Technical Specification Bases2009-12-30030 December 2009 Submittal of Changes to Technical Specification Bases SBK-L-09211, Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria2009-09-25025 September 2009 Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria SBK-L-09002, License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 262009-02-18018 February 2009 License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 26 SBK-L-08216, Submittal of Changes to Technical Specification Bases2008-12-16016 December 2008 Submittal of Changes to Technical Specification Bases SBK-L-08007, Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidat2008-02-19019 February 2008 Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated. SBK-L-06244, Submittal of Changes to Seabrook Station Technical Specification Bases2007-01-0303 January 2007 Submittal of Changes to Seabrook Station Technical Specification Bases SBK-L-06214, Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process.2006-11-28028 November 2006 Clarification of Response to RAI Regarding LAR 06-02, Application for Technical Specification Improvement Regarding Steam Generator Integrity Using Consolidated Line Item Improvement Process. SBK-L-06171, Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time.2006-10-0101 October 2006 Response to Request for Additional Information Regarding License Amendment Request 05-11, Changes to Technical Specification 3.8.3.1 Onsite Power Distribution, for Vital Inverter Allowed Outage Time. ML0605302202006-02-17017 February 2006 Technical Specification Pages Re Removal of Requirement to Perform End-of-Life Moderator Temperature Coefficient Measurement ML0512900672005-05-0606 May 2005 Technical Specifications, Containment Systems, Bases. Amendment No. BC 04-12 ML0511500472005-04-21021 April 2005 Technical Specifications, Containment Building Penetrations Surveillance Requirements (Tac. MC3753) ML0506002522005-02-24024 February 2005 Technical Specification Page Re Alternative Source Term ML0430102922004-10-25025 October 2004 Technical Specification Pages, Change to Emergency Diesel Generator Technical Specification Surveillance Requirement 4.8.1.1.2A5 Footnote ML0428902812004-10-12012 October 2004 Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate ML0426700362004-09-21021 September 2004 License Amendment, Issuance of Amendment Re Change to Emergency Power Systems SBK-L-04050, Submittal of Changes to the Plant Technical Specification Bases2004-09-0202 September 2004 Submittal of Changes to the Plant Technical Specification Bases ML0408603072004-03-17017 March 2004 License Amendment Request 04-03, Application for Stretch Power Uprate ML0407106782004-03-0303 March 2004 Submittal of Changes to the Technical Specification Bases ML0404404322004-02-0404 February 2004 License Amendment Request 03-03, Miscellaneous Changes to the Technical Specifications. ML0404204042004-02-0303 February 2004 License Amendment Request 03-04, Change to Technical Specification SR 4.8.1.1.2a.5. ML0229400242002-10-11011 October 2002 License Amendment Request 02-04, Revision to TS Associated with Pressure/Temperature Curves & Low Temperature Overpressure Protection Limits ML0225301992002-09-0505 September 2002 Technical Specifications Re Index - Limiting Conditions for Operation and Surveillance Requirements ML0212601482002-05-0202 May 2002 TS Pages Amendment 83 2024-08-12
[Table view] Category:Amendment
MONTHYEARL-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material SBK-L-09211, Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria2009-09-25025 September 2009 Correction to Proposed Change in License Amendment Request to Revise Technical Specification Section 6.7.6.k, Steam Generator Program, and TS 6.8.1.7, Steam Generator Tube Inspection Report, for One-Time Alternate Repair Criteria SBK-L-09002, License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 262009-02-18018 February 2009 License Amendment Request for Adoption of TSTF-5 11, Rev. 0, to Eliminate Working Hour Restrictions from Technical Specification 6.2.2 to Support Compliance with 10 CFR Part 26 SBK-L-08007, Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidat2008-02-19019 February 2008 Response to Request for Additional Information Re License Amendment Request (LAR) 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated. ML0605302202006-02-17017 February 2006 Technical Specification Pages Re Removal of Requirement to Perform End-of-Life Moderator Temperature Coefficient Measurement ML0512900672005-05-0606 May 2005 Technical Specifications, Containment Systems, Bases. Amendment No. BC 04-12 ML0511500472005-04-21021 April 2005 Technical Specifications, Containment Building Penetrations Surveillance Requirements (Tac. MC3753) ML0506002522005-02-24024 February 2005 Technical Specification Page Re Alternative Source Term ML0430102922004-10-25025 October 2004 Technical Specification Pages, Change to Emergency Diesel Generator Technical Specification Surveillance Requirement 4.8.1.1.2A5 Footnote ML0428902812004-10-12012 October 2004 Response to Request for Additional Information Regarding License Amendment Request 04-03, Application for Stretch Power Uprate ML0426700362004-09-21021 September 2004 License Amendment, Issuance of Amendment Re Change to Emergency Power Systems ML0408603072004-03-17017 March 2004 License Amendment Request 04-03, Application for Stretch Power Uprate ML0404204042004-02-0303 February 2004 License Amendment Request 03-04, Change to Technical Specification SR 4.8.1.1.2a.5. ML0229400242002-10-11011 October 2002 License Amendment Request 02-04, Revision to TS Associated with Pressure/Temperature Curves & Low Temperature Overpressure Protection Limits ML0225301992002-09-0505 September 2002 Technical Specifications Re Index - Limiting Conditions for Operation and Surveillance Requirements ML0212601482002-05-0202 May 2002 TS Pages Amendment 83 2024-08-12
[Table view] |
Text
ENERGY July 13, 2015 SBK-L- 15093 10 CFR 50.90 Docket No. 50-443 Facility Operating License No. NPF-86 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Seabrook Station License Amendment Request (LAR) 15-01 Application to Add a Note to Technical Specification TS 4.4.1.3.4 References
- 1. NextEra Energy Seabrook, LLC License Amendment Request (LAR,) 14-01, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)
Traveler -523, "'Generic Letter 2008-0 1, Managing Gas Accumulation," Using the Consolidated Line Item Improvement Process, dated June 24, 2014 (ML14177A503)
- 2. NextEra Energy Seabrook, LLC letter, Supplement to NextEra Energy Seabrook, LLC's LAR, 13-05, LAR, 14-01, LAR 14-02 and LAR 14-03 in Response to Issuance of Amendment 141, Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to the Seabrook Surveillance Frequency Control Program (SFCP), dated December 11, 2014 (ML14349A646)
- 3. NRC letter, "Issuance of Amendment Regarding Technical Specifications Task Force (TSTF) Traveler-523, "Generic Letter 2008-01, Managing Gas Accumulation" Using the Consolidated Line Item Improvement Process" (TAC NO. MF43 07), dated February 6, 2015 (ML14345A288)
Pursuant to 10 CFR 50.90, NextEra Energy Seabrook, LLC (NextEra) is submitting a request for amendment to the Technical Specifications (TS) for Seabrook Station (Seabrook), Unit 1.
In Reference 1, NextEra submitted License Amendment Request (LAR) 14-0 1 to modify TS requirements to address NRC Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," as described in TSTF-523, Revision 2 "Generic Letter 2008-01, Managing Gas Accumulation."
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
U. S. Nuclear Regulatory Commission SBK-L-15093/Page 2 of 3 In Reference 2, NextEra submitted revised, marked-up TS pages for LAR 13-05, LAR 14-0 1, and LAR 14-02 to reflect changes to those pages made by License Amendment (LA) 141. The revised, marked-up pages for LAR 14-0 1 inadvertently omitted a note from Surveillance Requirement (SR) 4.4. 1.3.4 which was being added as part of LAR 14-0 1.
In Reference 3, the NRC issued LA 144, which did not include the note related to SR 4.4.1.3.4. provides a description and assessment of the proposed change. Attachment 2 provides the existing TS pages marked up to show the proposed change. Attachment 3 provides existing TS Bases pages marked up to show the proposed change to the bases. The change to the existing TS Bases, consistent with the technical and regulatory analyses, will be implemented under the Technical Specification Bases Control Program. It is provided in Attachment 3 for information only. New TS pages with the proposed change incorporated will be provided when requested by the NRC Project Manager.
Approval of the proposed amendment is requested by September 30, 2015. Once approved, the amendment will be implemented within 30 days.
The Station Operation Review Committee has reviewed this LAR. A copy of this LAR has been forwarded to the New Hampshire State Liaison Officer pursuant to 10 CFR 50.9 1(b).
This letter makes no new commitments or changes to any existing commitments.
If you have any questions or require additional information, please contact Mr. Michael Ossing at 603-773-7512.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on July 9_2_ 2015.
Sincerely, NextEra Energy Seabrook, LLC Ralph A. Dodds, III Plant General Manager
U. S. Nuclear Regulatory Commission SBK-L- 15093/Page 3 of 3 Attachments: 1. Description and Assessment
- 2. Proposed TS Change (marked-up page)
- 3. Proposed TS Bases Change (marked-up page) - For information only cc: USNRC Regional Administrator, Region I J. G. Lamb, USNRC Project Manager, Project Directorate I-2 USNRC Senior Resident Inspector, Seabrook Station Mr. Perry Plummer, Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 John (ijarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA, 01702-5399
SBK-L- 15093 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 Attachment 1 Seabrook Station Description and Assessment 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHTNICAL EVALUATION 4.0 REGULATORY SAFETY ANALYSIS 4.1 Applicable Regulatory Requirements/Criteria 4.2 No Significant Hazards Consideration Determination 4.2 Conclusions 5.0 ENVIRONMENTAL EVALUATION
6.0 REFERENCES
Page 1 of 5
SBK-L- 15093 ATTACHMENT 1 DESCRIPTION AND ASSESSMENT 1.0
SUMMARY
DESCRIPTION The proposed change adds the following Note to Surveillance Requirement (SR) 4.4.1.3.4 which requires verification that Residual Heat Removal (RLFHR) ioop locations susceptible to gas accumulation are sufficiently filled with water in accordance with the Surveillance Frequency Control Program:
"*kNot requiredto be performed until]2 hours after entering MODE 4."
2.0 DETAILED DESCRIPTION The proposed change adds a Note to SR 4.4.1.3.4 which requires verification that RITR loop locations susceptible to gas accumulation are sufficiently filled with water in accordance with the Surveillance Frequency Control Program.
In Reference 1, NextEra Energy Seabrook, LLC (NextEra) submitted License Amendment Request (LAR) 14-01 to modify Technical Specification (TS) requirements to address NRC Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," as described in TSTF-523, Revision 2, "Generic Letter 2008-01, Managing Gas Accumulation."
In Reference 2, NextEra submitted revised, marked-up TS pages for LAR 13-05, LAR 14-01, and LAR 14-02 to reflect changes to those pages made by License Amendment (LA) 141 which implemented the Surveillance Frequency Control Program. The revised marked-up pages for LAiR 14-0 1 inadvertently omitted a note from SR 4.4.1.3.4, which was added to the TS as part of LA 144 (Reference 3).
The proposed change adds the note back in to SR 4.4.1.3.4.
3.0 TECHNICAL EVALUATION
SR 4.4.1.3.4 verifies RHR loop locations susceptible to gas accumulation are sufficiently filled with water in accordance with the Surveillance Frequency Control Program. The Note is added to the gas accumulation SR for the RUR system Limiting Condition for Operations (LCOs) that are initially applicable during a plant shutdown. The Note states that the SR does not have to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering the Applicability of the LCO (MODE 4). Surveillances are normally performed prior to entering the Applicability. During a rapid shutdown, there may be insufficient time to verify all susceptible tocations in the RHR System before entering the Applicability. The Note provides a limited time to perform the Surveillance after entering the Applicability of the LCO; however, under the Improved Standard Technical Specifications Page 2 of 5
SBK-L- 15093 (ISTS) usage rules, (ISTS Section 1.4), the requirement to manage gas accumulation is not affected. Licensees must have confidence that the SR can be met or the LCO must be declared not met. The proposed change is consistent with TSTF-523 (Reference 4), Section 3.1.
4.0 REGULATORY SAFETY ANALYSIS 4.1 Applicable Regulatory Requirements/Criteria The following regulatory requirements/criteria are applicable:
- 10 CFR 50.36, "Technical Specifications," establishes the requirements for the items that must be included in the TS. Paragraph 50.3 6(c)(3), states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met."
- General Design Criteria (GDC) 1, 34, 35, 36, 37, 38, 39, and 40 in 10 CFR Part 50, Appendix A, and the Quality Assurance (QA) Criteria III, V, XI, XVI, and XVII in 10 CFR 50, Appendix B, address aspects of ensuring that systems are not impaired by entrained gas.
4.2 No Significant Hazards Consideration Determination The proposed change adds a Note to SR 4.4.1.3.4 that states that the SR does not have to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering the Applicability of the LCO (MODE 4). Surveillances are normally performed prior to entering the Applicability. During a rapid shutdown, there may be insufficient time to verify all susceptible locations in the RHR System before entering the Applicability. SR 4.4.1.3.4 verifies RHR loop locations susceptible to gas accumulation are sufficiently filled with water in accordance with the Surveillance Frequency Control Program.
NextEra has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the Proposed Change Involve a Significant Increase in the Probability or Consequences of an Accident Previously Evaluated?
Response: No SR 4.4.1.3.4 verifies RHR loop locations susceptible to gas accumulation are sufficiently filled with water in accordance with the Surveillance Frequency Control Program. The proposed change adds a note to allow SR 4.4.1.3.4 to be performed 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering the Mode of Applicability. Gas accumulation in the subject system is not an initiator of any accident previously evaluated. As a result, the probability of any accident previously evaluated is not significantly increased. The proposed note does not change SR 4.4.1.3.4 Page 3 of 5
SBK-L- 15093 Attachment 1 which ensures that the subject system continues to be capable of performing its assumed safety function and is not rendered inoperable due to gas accumulation.
Thus, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the Proposed Change Create the Possibility of a New or Different Kind of Accident from any Accident Previously Evaluated?
Response: No The proposed change does not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. In addition, the proposed change does not impose any new or different requirements that could initiate an accident. The proposed change does not alter assumptions made in the safety analysis and is consistent with the safety analysis assumptions.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the Proposed Change Involve a Significant Reduction in a Margin of Safety?
Response: No The proposed change does not adversely affect any current plant safety margins or the reliability of the equipment assumed in the safety analysis. Therefore, there are no changes being made to any safety analysis assumptions, safety limits, or limiting safety system settings that would adversely affect plant safety as a result of the proposed change.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, NextEra concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.3 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.
Page 4 of 5
SBK-L- 15093 5.0 ENVIRONMENTAL EVALUATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
6.0 REFERENCES
- 1. NextEra Energy Seabrook, LLC License Amendment Request (LAIR) 14-0 1, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)
Traveler -523, "Generic Letter 2008-0 1, Managing Gas Accumulation," Using the Consolidated Line Item Improvement Process, dated June 24, 2014 (ML14177A503)
- 2. NextEra Energy Seabrook, LLC letter, Supplement to NextEra Energy Seabrook, LLC's LAIR 13-05, LAR 14-01, LAR 14-02 and LAR 14-03 in Response to Issuance of Amendment 141, Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to the Seabrook Surveillance Frequency Control Program (SFCP), dated December 11, 2014 (ML14349A646)
- 3. NRC letter, "Issuance of Amendment Regarding Technical Specifications Task Force (TSTF) Traveler-523, "Generic Letter 2008-01, Managing Gas Accumulation" Using the Consolidated Line Item Improvement Process," dated February 6, 2015 (TAC NO.
MF4307) (ML14345A288)
- 4. TSTF-523, Revision 2, "Generic Letter 2008-0 1, Managing Gas Accumulation." -
Page 5 of 5
SBK-L-1 5093 License Amendment Request (LAR) 15-01 Application to Add a Note to Technical Specification TS 4.4.1.3.4 Attachment 2 Seabrook Station Technical Specifications Changes Marked Up Pages This coversheet plus 1 page
REACTOR COOLANT SYSTEM REACTOR COOLANT LOOPS AND COOLANT CIRCULATION HOT SHUTDOWN SURVEILLANCE REQUIREMENTS 4.4.1.3.1 The required reactor coolant pump(s), if not in operation, shall be determined OPERABLE in accordance with the Surveillance Frequency Control Program by verifying correct breaker alignments and indicated power availability.
4.4.1.3.2 The required steam generator(s) shall be determined OPERABLE by verifying secondary-side water level to be greater than or equal to 14% in accordance with the Surveillance Frequency Control Program.
4.4.1.3.3 At least one reactor coolant or RHR loop shall be verified in operation and circulating reactor coolant in accordance with the Surveillance Frequency Control Program.
4.4.1.3.4 Verify required RHR loop locations susceptible to gas accumulation are ./
sufficiently filled with water in accordance with the Surveillance Frequency Control Program.*1
- Not required to be PerfOrmed until 12 hOurs after entering MODE 4.
SEABROOK- UNIT 1 3/4 4-5 SEABOOK-UIT I3/44-5Amendment No. 44-1-, +4-
SBK-L-1 5093 License Amendment Request (LAR) 15-01 Application to Add a Note to Technical Specification TS 4.4.1.3.4 Attachment 3 Seabrook Station Technical Specifications Bases Changes Marked Up Pages For Information Only This coversheet plus 1 page Seabrook Station
3/4.4 REACTOR COOLANT SYSTEM BASES 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION (Continued)
RHR System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative subset of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, plant configuration, or personnel safety. For these locations, alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location.
Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.
The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.
j', In a rapid shutdown, there may be insufficient time to verify all susceptible locations to entering MODE 4.
This SR is modified by a NOTE that states the SR is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 4.
SEABROOK - UNIT 1 / 4-1b B 3/4 -bBC50,150 BC*,