Correction to Amendment No. 162 Issued November 18, 2019, Revisions to Technical Specifications Associated with Movable Control Rods
ML20120A047
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/29/2020
From: Justin Poole
NRC/NRR/DORL/LPL1
To: Moul D
Florida Power & Light Co, NextEra Energy Seabrook
Poole J
References
EPID L-2018-LLA-0272
Download: ML20120A047 (5)


Text

April 29, 2020 Mr. Don Moul Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company NextEra Energy Seabrook, LLC Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CORRECTION TO AMENDMENT NO 162 ISSUED NOVEMBER 18, 2019, RE: REVISIONS TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH MOVABLE CONTROL RODS (EPID L-2018-LLA-0272)

Dear Mr. Moul:

By letter dated November 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 162 to Renewed Facility Operating License No. NPF-86 for the Seabrook Station, Unit No. 1 (Seabrook). The amendment was in response to your application dated October 4, 2018, as supplemented by letter dated September 30, 2019. The amendment revised the technical specifications (TSs) to adopt changes provided in Technical Specifications Task Force (TSTF) Traveler, TSTF-234, Add Action for More than One (Digital Rod Position Indication) [D]RPI Inoperable, and TSTF-547, Clarification of Rod Position Requirements, and made various other changes to align the Seabrook TSs more closely with NUREG-1431, Standard Technical Specifications Westinghouse Plants.

Subsequent to issuance of the amendment, the licensee informed the NRC that there was a typographical error on TS page 3/4 1-16 where the word in should have been is.

Specifically, Section 3.1.3.1 d.1 stated, Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify SHUTDOWN MARGIN in within the limits specified in the COLR, and. The correct wording is Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify SHUTDOWN MARGIN is within the limits specified in the COLR, and. The corrected TS page 3/4 1-16 is enclosed. This correction does not change any of the conclusions in the safety evaluation associated with the issuance of the amendment and does not affect the associated notice to the public.

D. Moul If you have any questions, please contact me at 301-415-2048 or Justin.Poole@nrc.gov.

Sincerely,

/RA/

Justin C. Poole, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Corrected TS page 3/4 1-16 cc: Listserv

ML20120A047 OFFICE NRR/DORL/LPL1:PM NRR/DORL/LPL1:LA NRR/DORL/LPL1:BC NRR/DORL/LPL1:PM NAME JPoole LRonewicz JDanna JPoole DATE 04/29/2020 04/29/2020 04/29/2020 04/29/2020 ENCLOSURE SEABROOK STATION, UNIT NO. 1 CORRECTED TS PAGE 3/4 1-16 FOR AMENDMENT NO. 162

REACTIVITY CONTROL SYSTEMS MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPE;RATION 3.1.3.1 ACTION b.2 (Continued) c) A power distribution maP.N is obtained from the lncore Detector System and Fa(Z) and F oH are verified to be within their limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; and d) The THERMAL POWER level is reduced to less than or equal to 75% of RATED THERMAL POWER within the next hour and within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the High Neutron Flux Trip Setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER.

c. DELETED
d. With more than one rod misaligned from its group step counter demand height by more than+/- 12 steps:
1. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify SHUTDOWN MARGIN is within the limits specified in the COLR, and
2. Be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------

Surveillance Requirement 4.1.3.1.1 is not required to be performed for rods associated with inoperable digital rod position indicator or demand position indicator.

4.1.3.1.1 The position of each full-length rod shall be determined to be within the group demand limit by verifying the individual rod positions in accordance with the Surveillance Frequency Control Program.

4.1.3.1.2 Each full-length rod not fully inserted in the core shall be determined to be OPERABLE by movement of at least 10 steps in any one direction in accordance with the Surveillance Frequency Control Program.

SEABROOK - UNIT 1 3/4 1-16 Amendment No. 30, 141, 162