MONTHYEARML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) IR 05000387/20220052022-08-31031 August 2022 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2022005 and 05000388/2022005) IR 05000387/20210062022-03-0202 March 2022 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2021006 and 05000388/2021006) ML22041A1562022-02-10010 February 2022 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000387/2022013 and 05000388/2022013 ML21236A2662021-11-0808 November 2021 Ti 2515/194 Inspection Documentation Request ML21312A1012021-11-0808 November 2021 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000387/2022011 IR 05000387/20210052021-09-0101 September 2021 Updated Inspection Plan for the Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2021005 and 05000388/2021005) ML21210A2232021-07-29029 July 2021 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000387/2021010 and 05000388/2021010 IR 05000387/20200062021-03-0303 March 2021 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2020006 and 05000388/2020006) IR 05000387/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Reports 05000387/2020005 and 05000388/2020005) ML20149K4492020-05-28028 May 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000387/20190062020-03-0303 March 2020 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2019006 and 05000388/2019006) ML20056E4392020-02-21021 February 2020 Ti 2515/194 Inspection Documentation Request IR 05000387/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000387/2019005 and 05000388/2019005) ML19191A0652019-07-10010 July 2019 Information Request for Triennial Baseline Design Bases Assurance Inspection (Team); Notification to Perform Inspection 05000387/2019011 and 05000388/2019011 IR 05000387/20180062019-03-0404 March 2019 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2018006 and 05000388/2018006) IR 05000387/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000387/2018005 and 05000388/2018005) IR 05000387/20170062018-02-28028 February 2018 Annual Assessment Letter for Susquehanna Units 1 and 2 (Report 05000387-2017006 and 05000388-2017006 Report 05000387-2017402 and 05000388-2017402 Report 05000387-2017501 and 05000388-2017501) IR 05000387/20170052017-08-28028 August 2017 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 Letter with Report 22 (Report 05000387/2017005 and 05000388/2017005) IR 05000387/20160062017-03-0101 March 2017 Annual Assessment Letter for Susquehanna Units 1 and 2 Report Nos. 05000387/2016006 and 05000388/2016006 IR 05000387/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2, (Report 05000387/2016005 and 05000388/2016005) IR 05000387/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Inspection Report 05000387/2015006 and 05000388/2015006) IR 05000387/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2015005 and 05000388/2015005) IR 05000387/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2014001 and 05000388/2014001) IR 05000387/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000387-14-006 and 0500388-14-006 IR 05000387/20130012014-03-0404 March 2014 ROP-14 2013 Susquehanna Steam Electric Station, Units 1 & 2, Annual Assessment Letter for Report 05000387/2013001 and 05000388/2013001 and Inspection Plan IR 05000387/20130062013-09-0303 September 2013 Mid-cycle Performance Review and Inspection Plan Report 05000387-13-006 and 05000388-13-006 IR 05000387/20120012013-03-0404 March 2013 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2012001 and 05000388-12-001) IR 05000387/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2012006 and 05000388/2012006) IR 05000387/20110012012-03-0101 March 2012 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2011001 and 05000388/2011001) ML1124304692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Susquehanna Steam Electric Station, Units 1 and 2 IR 05000387/20100012011-03-0404 March 2011 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2, EOC-11 (Report 05000387/2010001 and 05000388/2010001) ML1024404622010-09-0101 September 2010 IR 05000387-10-001 and 05000388-10-001 on 08/11/2010 for Susquehanna Steam Electric Station, Units 1 & 2, Mid-Cycle Assessment Letter 2010 ML1006210392010-03-0303 March 2010 Annual Assessment Letter - Susquehanna Steam Electric Station, Units 1 and 2 (05000387-10-001 and 05000388-10-001) ML0924402702009-09-0101 September 2009 Mid-Cycle Performance Assessment Letter - Susquehanna Steam Electric Station IR 05000387/20090012009-03-0404 March 2009 Annual Assessment Letter - Susquehanna Steam Electric Station (05000387-09-001 and 05000388-09-001) ML0824704642008-09-0202 September 2008 2008 Mid-Cycle Performance Assessment Letter - Susquehanna ML0734707322007-12-13013 December 2007 ROP 8 - Susquehanna - Change to Inspection Plan, 12/13/07 ML0724306552007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000387/20070012007-03-0202 March 2007 Annual Assessment Letter - Susquehanna Steam Electric Station (Report 05000387/2007001 and 05000388/2007001) ML0624305252006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Susquehanna Steam Electric Station ML0606204502006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Susquehanna Steam Electric Station (Report 05-387/2006001 and 05-388/2006001) ML0524207002005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Susquehanna ML0718301432005-03-14014 March 2005 CH-ER-314, Rev 1, SSES Environmental Inspection Plan Procedure. IR 05000387/20050012005-03-0202 March 2005 Annual Assessment Letter for 05000387-05-001 and 05000388-05-001 ML0424404422004-08-30030 August 2004 2004 Susquehanna Mid Cycle Performance Review and Inspection Plan IR 05000387/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Susquehanna Steam Electric Station (Report 50-387/03-01, 50-388/03-01) ML0223804822002-08-26026 August 2002 2002 Susquehanna Mid-Cycle Performance Review and Inspection Plan 2023-08-31
[Table view] Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (REPORT 05000387/2014001 AND 05000388/2014001)
Dear Mr. Rausch:
On February 9, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Susquehanna Steam Electric Station (Susquehanna)
Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs)
in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Susquehanna Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP)
Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).
Additionally, the NRC determined the performance at Susquehanna Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs ROP Action Matrix because we satisfactorily completed Inspection Procedure (IP) 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, on July 31, 2014, in which we reviewed your identified root causes and corrective actions for the Unplanned Scrams with Complications and the Unplanned Scrams per 7000 Critical Hours PIs. We also conducted a public performance assessment meeting on September 3, 2014, to report the results of this inspection and issued an assessment follow-up letter on September 12, 2014, in which we described Unit 2s transition to the Licensee Response Column of the NRCs Action Matrix (Report 05000388/2014008, ML14255A250). Therefore, because all Unit 1 and Unit 2 findings and PIs that input into the Action Matrix are Green, we plan to perform NRC baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to ROP baseline inspections, the NRC plans to perform Inspection Procedure (IP) 92702, Follow-up on Corrective Actions for Violations and Deviations, once you notify the NRC of your readiness for this inspection. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Daniel H. Dorman Regional Administrator Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 Enclosure: Susquehanna Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML15062A232 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA NAME SBarber/GSB * FBower/ FLB * HNieh/ HKN * DDorman/ DHD DATE 02/19/15 02/19/15 02/25/15 03/02/15
Page 1 of 2 Susquehanna 01/26/2015 09:42:19 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 1/19EXAM - SUSQUEHANNA RETAKE EXAM 2 1 01/19/2015 01/23/2015 U01933 FY15-SUSQUEHANNA INITIAL OPERATOR LICENSING RETAKE EXAM 7111107T - TRIENNIAL HEAT SINK 1 1, 2 02/23/2015 02/27/2015 IP 7111107T Heat Sink Performance 8/17EXAM - INITIAL OL EXAM 3 1 07/20/2015 07/24/2015 U01916 FY15-SUSQUEHANNA INITIAL OPERATOR LICENSING EXAM 1 08/17/2015 08/28/2015 U01916 FY15-SUSQUEHANNA INITIAL OPERATOR LICENSING EXAM 7111108G - U2 INSERVICE INSPECTION 1 2 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR 71124 - RAD SAFETY INSPECTION 1 1, 2 04/27/2015 05/01/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/27/2015 05/01/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/27/2015 05/01/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/27/2015 05/01/2015 IP 71124.04 Occupational Dose Assessment 1, 2 04/27/2015 05/01/2015 IP 71151 Performance Indicator Verification 71124.07 - RAD SAFETY INSPECTION 1 1, 2 06/15/2015 06/19/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/15/2015 06/19/2015 IP 71151 Performance Indicator Verification 71124 - RAD SAFETY INSPECTION 1 1, 2 08/17/2015 08/21/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 08/17/2015 08/21/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 08/17/2015 08/21/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/17/2015 08/21/2015 IP 71124.04 Occupational Dose Assessment MODS - PERMANENT PLANT MODIFICATIONS 3 1, 2 08/31/2015 09/04/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 09/14/2015 09/18/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111111B - REQUAL INSP W/ P/F RESULTS 2 1, 2 10/26/2015 10/30/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RAD SAFETY INSP 1 1, 2 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/05/2015 10/09/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/05/2015 10/09/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/05/2015 10/09/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Susquehanna 01/26/2015 09:42:19 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 1 1, 2 10/26/2015 10/30/2015 IP 7111402 Alert and Notification System Testing 1, 2 10/26/2015 10/30/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 10/26/2015 10/30/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies ISI - U1 INSERVICE INSPECTION 1 1 03/21/2016 03/25/2016 IP 7111108G Inservice Inspection Activities - BWR RS1234PI - HP OUTAGE INSPECTION 1 1, 2 03/28/2016 04/01/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/28/2016 04/01/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/28/2016 04/01/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/28/2016 04/01/2016 IP 71124.04 Occupational Dose Assessment RS6PI - EFFLUENTS PUBLIC PI 1 1, 2 06/13/2016 06/17/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/13/2016 06/17/2016 IP 71151-PR01 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.