ML14008A048

From kanterella
Jump to navigation Jump to search
Senior Reactor and Reactor Operator Initial License Examination - Oyster Creek Nuclear Generating Station
ML14008A048
Person / Time
Site: Oyster Creek
Issue date: 01/02/2014
From: Diane Jackson
Division of Reactor Safety I
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Jackson D
Shared Package
ML13333A261 List:
References
Download: ML14008A048 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 January 2, 2014 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - OYSTER CREEK NUCLEAR GENERATING STATION

Dear Mr. Pacilio:

In a telephone conversation on December 19, 2013, between Mr. J. Ridosh, Lead Exam Author, and Mr. T. Fish, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at Oyster Creek Nuclear Generating Station during the week of May 19, 2014.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 10, 2014. The written examinations, operating tests, and the supporting reference materials will be due by April 4, 2014. Pursuant to Title 10, Section 55.40(b) (3), of the Code of Federal Regulations (10 CFR 55.40(b) (3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and marked appropriately. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

M. Pacilio 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The OMB, under approval number 3150-0018, approved these information collections. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018),

Office of Management and Budget, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams/web-based.html.

M. Pacilio 3 Thank you for your cooperation in this matter. Mr. Ridosh has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-219 License No.: DPR-16 cc w/encl: Distribution via ListServ

M. Pacilio 3 Thank you for your cooperation in this matter. Mr. Ridosh has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Fish at (610) 337-5369, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-219 License No. DPR-16 cc w/encl: Distribution via ListServ Distribution w/encl:

W. Dean, RA (R1ORAMAIL Resource) G. Hunegs, DRP D. Lew, DRA (R1ORAMAIL Resource) A. Dugandzic, DRP M. Scott, DRP (R1DRPMAIL Resource) B. Bickett, DRP E. Benner, DRP (R1DRPMail Resource) G. Stock, DRP R. Lorson, DRS (R1DRSMail Resource) J. Kulp, DRP, SRI J. Trapp, DRS (R1DRSMail Resource) Amar Patel, DRP, RI B. Rini, RI OEDO J. DeVries, DRP, AA RidsNrrPMOysterCreek Resource D. Jackson, DRS RidsNrrDorlLpl1-2 Resource T. Fish, DRS DRS Master Exam File (C. Bixler) (w/concurrences)

SUNSI Review Complete: TF (Reviewers Initials)

ADAMS PKG: ML13333A261 ADAMS Document No.: ML14008A048 DOCUMENT NAME: G:\DRS\Operations Branch\FISH\OC-120dayexamltr.docx X Non-Sensitive X Publicly Available X SUNSI Review OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME TFish/ TF CBixler/ CB DJackson/DJ DATE 01/ 02 /2014 01/02 /2014 01/02 /2014 OFFICIAL RECORD COPY