MONTHYEARML13310A7421982-08-0101 August 1982 To Offsite Dose Calculation Manual.One Oversize Map & One Oversize P&ID Encl.Aperture Cards Are Available in PDR Project stage: Other ML13310B1121983-12-12012 December 1983 Forwards Application for Amend to License DPR-13,consisting of Rev 1 to Proposed Change 83 to Tech Specs,Incorporating Limiting Conditions for Operation & Surveillance Requirements for Radioactive Liquid Monitoring Project stage: Request ML20127B7021984-04-18018 April 1984 Visual Insp Criteria for Structural Steel & Miscellaneous Metal Welding to Meet Design Requirements Project stage: Request ML13310B6161984-06-13013 June 1984 Rev 1 to Offsite Dose Calculation Manual, Consisting of Corrected Pages,Per NRC 840418 Request to Support Review of Radiological Effluent Tech Specs Project stage: Other ML13310B6131984-08-0101 August 1984 Forwards Rev 1 to Offsite Dose Calculation Manual & Response to NRC 840418 Comments Project stage: Other ML13324A4491984-09-20020 September 1984 Rev 2 to Offsite Dose Calculation Manual Project stage: Other ML13324A4471984-10-15015 October 1984 Forwards Rev 2 to Offsite Dose Calculation Manual, Per Util 840914 Commitment.Rev Corrects Calculation for Total Body Liquid Dose & Removes Refs to Equations from Units 2 & 3 Offsite Dose Calculation Manual Project stage: Other ML14094A2611985-06-18018 June 1985 Rev 17 to Offsite Dose Calculation Manual,Nuclear Generation Site,Units 2 & 3 Project stage: Other ML13322A1151985-06-18018 June 1985 Rev 2 to Offsite Dose Calculation Manual,Nuclear Generation Site,Unit 1 Project stage: Other ML13324A7001985-08-12012 August 1985 Special Rept:Preliminary Land Use Census Received on 850712 Confirms New Residences & Work Locations.New Locations Will Result in Minimal Dose Impact.Offsite Dose Calculation Manual Will Be Revised to Indicate New Locations Project stage: Other ML14094A2621985-08-30030 August 1985 Safety Evaluation Re Offsite Dose Calculation Manual. Offsite Dose Calculation Manual Approved for Use W/Tech Spec 6.17 Project stage: Approval ML13324A7061985-08-30030 August 1985 Forwards Safety Evaluation Re Offsite Dose Calculation Manual.Offsite Dose Calculation Manual Approved for Use as Ref W/Tech Spec 6.17 Project stage: Approval ML20198B8551985-09-17017 September 1985 Forwards Rev 2 to Offsite Dose Calculation Manual,Nuclear Generation Site Unit 1 & Rev 17 to Offsite Dose Calculation Manual,Nuclear Generation Site Units 2 & 3 Project stage: Other ML13324A7421985-10-25025 October 1985 Special Rept:On 850927,final Land Use Census Results Identified Locations Yielding Calculated Dose or Dose Commitment Greater than Values Being Calculated in Tech Specs 4.6.3 & 4.11.2.3 Project stage: Other ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept Project stage: Other 1984-09-20
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SOUTHERN CALIFORNIA EDISON COMPANY SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 DOCKET NO. 50-206 OFFSITE DOSE CALCULATION MANUAL
1.0 INTRODUCTION
On August 27, 1984, the staff issued Amendment No. 79 to the Provisional Operating License (DPR-13) for the San Onofre Nuclear Generating Station, Unit No. 1. The amendment incorporated the Radiological Effluent Technical Specifications (RETS) into the San Onofre 1 Technical Specifications (TSs). Section 6.17 of the TSs referenced an Offsite Dose Calculation Manual (ODCM) and prescribed the methods for changing it.
2.0 EVALUATION By letter dated December 12, 1983 and modified by submittals dated August 1, 1984 and October 15, 1984, Southern California Edison Company provided copies of the ODCM.
The staff has reviewed the ODCM as modified through Revision 2 dated September 20, 1984 (submitted by letter dated October 15, 1984) and found that it uses documented and approved methods that are consistent with current NRC guidelines (issued January 1982). Thus, the ODCM is found to be acceptable.
3.0 CONCLUSION
S The San Onofre 1 ODCM is approved for use with San Onofre 1 Technical Specification 6.17.
4.0 ACKNOWLEDGMENT W. Meinke prepared this Safety Evaluation Dated: