MONTHYEARML13310A7421982-08-0101 August 1982 To Offsite Dose Calculation Manual.One Oversize Map & One Oversize P&ID Encl.Aperture Cards Are Available in PDR Project stage: Other ML13310B1121983-12-12012 December 1983 Forwards Application for Amend to License DPR-13,consisting of Rev 1 to Proposed Change 83 to Tech Specs,Incorporating Limiting Conditions for Operation & Surveillance Requirements for Radioactive Liquid Monitoring Project stage: Request ML20127B7021984-04-18018 April 1984 Visual Insp Criteria for Structural Steel & Miscellaneous Metal Welding to Meet Design Requirements Project stage: Request ML13310B6161984-06-13013 June 1984 Rev 1 to Offsite Dose Calculation Manual, Consisting of Corrected Pages,Per NRC 840418 Request to Support Review of Radiological Effluent Tech Specs Project stage: Other ML13310B6131984-08-0101 August 1984 Forwards Rev 1 to Offsite Dose Calculation Manual & Response to NRC 840418 Comments Project stage: Other ML13324A4491984-09-20020 September 1984 Rev 2 to Offsite Dose Calculation Manual Project stage: Other ML13324A4471984-10-15015 October 1984 Forwards Rev 2 to Offsite Dose Calculation Manual, Per Util 840914 Commitment.Rev Corrects Calculation for Total Body Liquid Dose & Removes Refs to Equations from Units 2 & 3 Offsite Dose Calculation Manual Project stage: Other ML14094A2611985-06-18018 June 1985 Rev 17 to Offsite Dose Calculation Manual,Nuclear Generation Site,Units 2 & 3 Project stage: Other ML13322A1151985-06-18018 June 1985 Rev 2 to Offsite Dose Calculation Manual,Nuclear Generation Site,Unit 1 Project stage: Other ML13324A7001985-08-12012 August 1985 Special Rept:Preliminary Land Use Census Received on 850712 Confirms New Residences & Work Locations.New Locations Will Result in Minimal Dose Impact.Offsite Dose Calculation Manual Will Be Revised to Indicate New Locations Project stage: Other ML14094A2621985-08-30030 August 1985 Safety Evaluation Re Offsite Dose Calculation Manual. Offsite Dose Calculation Manual Approved for Use W/Tech Spec 6.17 Project stage: Approval ML13324A7061985-08-30030 August 1985 Forwards Safety Evaluation Re Offsite Dose Calculation Manual.Offsite Dose Calculation Manual Approved for Use as Ref W/Tech Spec 6.17 Project stage: Approval ML20198B8551985-09-17017 September 1985 Forwards Rev 2 to Offsite Dose Calculation Manual,Nuclear Generation Site Unit 1 & Rev 17 to Offsite Dose Calculation Manual,Nuclear Generation Site Units 2 & 3 Project stage: Other ML13324A7421985-10-25025 October 1985 Special Rept:On 850927,final Land Use Census Results Identified Locations Yielding Calculated Dose or Dose Commitment Greater than Values Being Calculated in Tech Specs 4.6.3 & 4.11.2.3 Project stage: Other ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept Project stage: Other 1984-09-20
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 M.O.MEDFORD TELEPHO MANAGER, NUCLEAR LICENSING (818) 302'1749 October 25, 1985 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. J. B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket Nos. 50-206, 50-361, and 50-362 Special Report San Onofre Nuclear Generating Station Units 1, 2, and 3 Pursuant to Section 3.18.2, Action Statement B.1, of Appendix A, Technical Specifications, to Provisional Operating License No. DPR-13 for San Onofre Unit 1 and Section 3.12.2, Action Statement 'a' of Appendix A, Technical Specifications to Facility Operating License Nos. NPF-10 and NPF-15 for San Onofre Units 2 and 3, this submittal provides the required 30-day written Special Report for conditions identified during 1985 Annual Land Use Census.
The final Land Use Census results received by SCE on September 27, 1985 identifies locations which yield a calculated dose or dose commitment greater than the values currently being calculated in Specifications 4.6.3 and 4.11.2.3, for Units 1 and 2/3 respectively. Changes in calculated dose commitments are due to identification of a new occupational use of the land by State Park employees (life guards). This use, not reported to SCE in the preliminary Land Use Census report, affects the following locations:
- 1. San Onofre Surf Beach located in Sector P at 0.4 miles from Units 2/3 midpoint
- 2. San Onofre State Beach Campground located in Sector G at 0.8 miles from Units 2/3 midpoint 8511050156 851025 PDR ADOCK 05000206 S
PDR
Mr. J:
October 25, 1985 These changes will be reflected in the Offsite Dose Calculation Manuals (ODCM's). Reports of the resulting changes to the ODCM's will be submitted to the NRC in accordance with Technical Specification 6.17.2.1 for San Onofre Unit 1 and Technical Specification 6.14.2.1 for San Onofre Units 2 and 3.
Please contact me if you have any questions.
Very truly yours, cc:
Document Control Desk, NRC (18)
F. R. Huey (NRC Resident Inspector)
Richard F. Dudley (NRC)
Harry Rood (NRC)
H. T. Sipe, California Public Utilities Commission California Regional Water Quality Control Board, San Diego Region J. 0. Ward, California Department of Health Services