MONTHYEARML13310A7421982-08-0101 August 1982 To Offsite Dose Calculation Manual.One Oversize Map & One Oversize P&ID Encl.Aperture Cards Are Available in PDR Project stage: Other ML13310B1121983-12-12012 December 1983 Forwards Application for Amend to License DPR-13,consisting of Rev 1 to Proposed Change 83 to Tech Specs,Incorporating Limiting Conditions for Operation & Surveillance Requirements for Radioactive Liquid Monitoring Project stage: Request ML13310B2971984-03-20020 March 1984 Notification of 840328 Meeting W/Util in Bethesda,Md to Discuss Util Proposed Integrated Living Schedule Project stage: Request ML20127B7021984-04-18018 April 1984 Visual Insp Criteria for Structural Steel & Miscellaneous Metal Welding to Meet Design Requirements Project stage: Request ML13310B6161984-06-13013 June 1984 Rev 1 to Offsite Dose Calculation Manual, Consisting of Corrected Pages,Per NRC 840418 Request to Support Review of Radiological Effluent Tech Specs Project stage: Other ML13310B6131984-08-0101 August 1984 Forwards Rev 1 to Offsite Dose Calculation Manual & Response to NRC 840418 Comments Project stage: Other ML13316A6831984-08-27027 August 1984 Forwards Amend 79 to License DPR-13 & Safety Evaluation. Amend Modifies Tech Specs to Add Radiological Effluent Tech Specs Needed to Implement 10CFR50,App I Requirements Project stage: Approval ML13316A6851984-08-27027 August 1984 Amend 79 to License DPR-13,modifying Tech Specs to Add Radiological Effluent Tech Specs Needed to Implement 10CFR50,App I Requirements Project stage: Other ML13316A6861984-08-27027 August 1984 Safety Evaluation Supporting Amend 79 to License DPR-13 Project stage: Approval ML13324A4491984-09-20020 September 1984 Rev 2 to Offsite Dose Calculation Manual Project stage: Other ML13324A4411984-10-0202 October 1984 Advises That Addl Changes to Offsite Dose Calculation Manual Provided on 840801 Acceptable Project stage: Other ML13324A4471984-10-15015 October 1984 Forwards Rev 2 to Offsite Dose Calculation Manual, Per Util 840914 Commitment.Rev Corrects Calculation for Total Body Liquid Dose & Removes Refs to Equations from Units 2 & 3 Offsite Dose Calculation Manual Project stage: Other ML14094A2611985-06-18018 June 1985 Rev 17 to Offsite Dose Calculation Manual,Nuclear Generation Site,Units 2 & 3 Project stage: Other ML13322A1151985-06-18018 June 1985 Rev 2 to Offsite Dose Calculation Manual,Nuclear Generation Site,Unit 1 Project stage: Other ML13324A7001985-08-12012 August 1985 Special Rept:Preliminary Land Use Census Received on 850712 Confirms New Residences & Work Locations.New Locations Will Result in Minimal Dose Impact.Offsite Dose Calculation Manual Will Be Revised to Indicate New Locations Project stage: Other ML14094A2621985-08-30030 August 1985 Safety Evaluation Re Offsite Dose Calculation Manual. Offsite Dose Calculation Manual Approved for Use W/Tech Spec 6.17 Project stage: Approval ML13324A7061985-08-30030 August 1985 Forwards Safety Evaluation Re Offsite Dose Calculation Manual.Offsite Dose Calculation Manual Approved for Use as Ref W/Tech Spec 6.17 Project stage: Approval ML20198B8551985-09-17017 September 1985 Forwards Rev 2 to Offsite Dose Calculation Manual,Nuclear Generation Site Unit 1 & Rev 17 to Offsite Dose Calculation Manual,Nuclear Generation Site Units 2 & 3 Project stage: Other ML13324A7421985-10-25025 October 1985 Special Rept:On 850927,final Land Use Census Results Identified Locations Yielding Calculated Dose or Dose Commitment Greater than Values Being Calculated in Tech Specs 4.6.3 & 4.11.2.3 Project stage: Other ML20235L8861987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - San Onofre Nuclear Generating Station Unit 1, Informal Rept Project stage: Other 1984-08-01
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUTGROVEAVENUE ROSEMEAD. CALIFORNIA 91770 M.O. MEDFORD TELEPHONE MANAGER. NUCLEAR LICENSING December 12, 1983 (213) 572-1749 Director of Nuclear Reactor Regulation Attention:
D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 50-206 Radiological Effluent Technical Specifications San Onofre Nuclear Generating Station Unit 1 The Radiological Effluent Technical Specifications (RETS) for San Onofre Unit 1 were transmitted to the NRC as Amendment No. 84, Proposed Change No. 83, to our operating license by letter dated September 12, 1979.
The NRC staff's consultant provided us with a list of questions regarding that submittal which were transmitted to Charles A. Willis of the NRC staff by W. Serrano of EG&G by letter dated March 1, 1982.
The questions were discussed in a meeting with the NRC staff, EG&G and SCE representatives at San Onofre Unit 1 on July 7 and 8, 1982. Subsequent to the meeting, a draft copy of the RETS which incorporated the comments discussed at the meeting was sent to the NRC by letter dated October 13, 1982. Additional comments on the RETS were transmitted to us from EG&G by letter dated November 24, 1982 and on the Offsite Dose Calculation Manual (ODCM) by letter dated December 9, 1982. The additional comments were discussed and resolved by telephone on March 7, 1983 In summary, the RETS incorporates various requirements associated with effluent monitoring into the Appendix A, Technical Specifications for San Onofre Unit 1. It also relocates the radiological environmental monitoring program requirements from Appendix B, Technical Specifications to the Appendix A Technical Specifications.
Once the RETS have been approved, the Appendix B Technical Specifications will be deleted from the San Onofre Unit 1 operating license. The RETS will be scheduled to be implemented by January 1, 1985.
6312140164 831212I PDR ADOCK 05000206.
P PDR
Mr. D.
December 12, 1983 Also, our October 13, 1982 letter indicated that information regarding the calibration of the steam generator blowdown valves and the stack air fans would be provided to the NRC.
At this time it does not appear that this information is necessary; therefore, the calibration data is not provided with this enclosure.
If you have any questions regarding this matter, please let me know.
Very truly yours, Enclosure cc: J. 0. Ward