Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML20205Q622 | 19 April 1999 | Safety Evaluation Authorizing Proposed Alternative to Use Wire Penetrameters for ISI Radiography in Place of ASME Code Requirement | Incorporated by reference |
ML20205R037 | 16 April 1999 | SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill Piping | Safe Shutdown Fire Protection Program |
ML20203J198 | 12 February 1999 | Safety Evaluation Supporting Amends 149 & 141 to Licenses NPF-10 & NPF-15,respectively | |
ML20154B721 | 1 October 1998 | Safety Evaluation Approving Licensee Request to Implement Alternatives Contained in Code Case N-546 for Current Interval at Songs,Units 2 & 3 Until Code Case Approved by Ref in Reg Guide 1.147 | Nondestructive Examination VT-2 Incorporated by reference |
ML20203E730 | 17 February 1998 | SER Accepting 980105 Request to Use Mechanical Nozzle Seal Assembly as Alternate Repair Method,Per 10CFR50.55a(a)(3)(1) for Plant,Units 2 & 3 | Boric Acid Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Pressure Boundary Leakage |
ML20210T063 | 29 August 1997 | Safety Evaluation Approving Application Re Proposed Restructuring of Enova Corp,Parent Company of San Diego Gas & Electric Co by Establishment of Holding Company W/Pacific Enterprises | |
ML20128L723 | 3 October 1996 | Safety Evaluation Supporting Amend 158 to License DPR-13 | Offsite Dose Calculation Manual |
ML20058B124 | 19 November 1993 | Safety Evaluation Accepting Proposal to Leak Rate Test SI Tank Outlet Check Valves by Using Leak Test Method Described in OM-10,Paragraph 4.2.2.3(c) | |
ML20057G307 | 18 October 1993 | Safety Evaluation Granting Licensee 930616 Relief Request B-12 Re Hydrostatic Testing of Certain Welds in 4 Inch Line from Main Steam Header to Auxiliary Feedwater Pump | Hydrostatic |
ML20056E085 | 2 August 1993 | Safety Evaluation Accepting Licensee 890308,910301 & 911217 Responses to NRC Bulletin 88-011 Re C-E Owners Group Program for Evaluation of Pressurizer Surge Line Thermal Stratification | |
ML20056D642 | 27 July 1993 | SER Approving Licensee 930305 Relief Requests B-10,B-11 & Code Case N-496 | Incorporated by reference |
ML20128P840 | 17 February 1993 | Safety Evaluation Supporting Amend 153 to License DPR-13 | Offsite Dose Calculation Manual |
ML20125A434 | 3 December 1992 | Safety Evaluation Accepting Alternative Exam Methods Per 10CFR50.55a(a)(3)(i) & Addl Info Re Auxiliary Feedwater Sys Lube Oil Cooling,Per ISI Relief Requests B-7,B-8 & B-9 & Code Case N-481 | High Radiation Area Incorporated by reference |
ML20055E304 | 12 February 1988 | Safety Evaluation Supporting Util 871223 & 880111 Proposed Changes to Tech Specs,Including Reducing Lower Limits of Detection for Liquid Radioactive Effluents | |
ML20209H955 | 28 January 1987 | SER Re Tdi Diesel Generator Owners Group Findings & Recommendations for Operabilty/Reliabilty of Tdi Emergency Diesel Generators | Liquid penetrant |
ML20214E423 | 19 November 1986 | SER Re Reliability & Operability of Tdi Diesel Engines as Source for Emergency Power.Engines Will Continue to Provide Reliable Svc Until Next Refueling Outage | |
ML20195C826 | 16 May 1986 | Safety Evaluation Supporting Amends 47 & 36 to Licenses NPF-10 & NPF-15,respectively | Shutdown Margin Anticipated operational occurrence |
ML20207K270 | 22 November 1985 | Safety Evaluation Supporting Amends 38 & 27 to Licenses NPF-10 & NPF-15,respectively | |
ML20138B028 | 25 September 1985 | Safety Evaluation Supporting Amends 35 & 24 to Licenses NPF-10 & NPF-15,respectively | |
ML20126H078 | 30 November 1984 | Draft SER Supporting Return to Svc | Safe Shutdown Operating Basis Earthquake Functionality Assessment Earthquake |
ML20136H112 | 31 August 1982 | Sser Supporting Fire Protection | Safe Shutdown Boric Acid Fire Barrier Safe Shutdown Earthquake Emergency Lighting Fire Protection Program |
ML20136H076 | 4 February 1981 | Marked-up Sser 1 Supporting Fire Protection | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Emergency Lighting Backfit |
ML20136E078 | 19 January 1981 | Safety Evaluation Supporting Fire Protection Program, Providing Mods Are Made Before Fuel Loading | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Emergency Lighting Design basis earthquake Earthquake Fire Protection Program |
ML20136D969 | 11 November 1980 | Safety Evaluation Re Fire Protection Sys.Licensee Proposed Mods Acceptable | Fire Barrier Emergency Lighting Fire Protection Program |
ML20148C490 | 16 October 1978 | Safety Evaluation Supporting Postponement of Permanent ECCS Single Failure Fixes at Facility.Postponement of Installation of Redundant Undervoltage Relays Unacceptable |