ML14055A275

From kanterella
Jump to navigation Jump to search
Submittal of Pre-Operational Test Instructions, 2-PTI-063-01 and 2-PTI-068-11
ML14055A275
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/18/2014
From: Hruby R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14055A278 List:
References
Download: ML14055A275 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 February 18, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-operational Test Instructions The following approved WBN Unit 2 Pre-op Test Instructions (PTIs) are enclosed:

PTI NUMBER Rev. TITLE 2-PTI-063-01 0 Safety Injection System SIS Integrated Test 2-PTI-068-11 0 Cross Calibration of RCS Temperature Sensors If you have any questions, please contact Nick Welch at (423) 365-7820.

Respectfully, Raymond A. Hruby, Jr.

General Manager, Technical Services Watts Bar Unit 2 Enclosures

U.S. Nuclear Regulatory Commission Page 2 February 18, 2014 cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381