ML13322B112
| ML13322B112 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/12/1990 |
| From: | Tatum J Office of Nuclear Reactor Regulation |
| To: | Cotton G, Ray H San Diego Gas & Electric Co, Southern California Edison Co |
| References | |
| GL-88-020, TAC-74463, TAC-74464, TAC-74465 NUDOCS 9003200364 | |
| Download: ML13322B112 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 12, 1990 Pocket Nos. 50-206, 50-361 and 50-362 Mr. Harold B. Ray Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Co.
Engineering and Operations Irvine Operations Center San Diego Gas & Electric Co.
23 Parker Street 101 Ash Street Irvine, California 92718 San Diego, California 92112 Gentlemen:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) (TAC NOS. 74463, 74464 AND 74465)
Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder: (1) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated November 3, 1989, submitted in response to the reporting requirements of the generic letter. We conclude that your IPE approach, methodology and schedule are acceptable. However, as we stated in Generic Letter 88-20, we expect that utilities with extensive PRA experience, such as yours, will submit their IPE results on a shorter schedule than 3 years.
We therefore encourage you to submit your IPE results on a more expeditious schedule to help avoid any possible delays between your completion of the IPE and our review process due to the expected backlog at the end of the 3-year period. In this regard, please provide us with your current projections for submitting the IPE results for each of the units. We anticipate that any pos sible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will not have any adverse effect on your schedule. However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
V11-tL/iA
Messrs Ray and Cotton
- 2 The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Pub. L.96-511.
Please contact us if you should have any questions regarding this matter.
Sincerely, J mes E. Tatum, Project Manager roject Directorate V Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
See next page
Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Units No. 1, 2, and 3 cc David R. Pigott Mr. Gary D. Cotton Orrick, Herrington & Sutcliffe Senior Vice President The Old Federal Reserve Bank Bldq.
Engineering and Operations 400 Sansome Street San Diego Gas & Electric Company San Francisco, California 94111 101 Ash Street, P.O. Box 1831 San Diego, California 92112 Mr. Robert G. Lacy Manager, Nuclear San Diego Gas & Electric Company Mr. Charles B. Brinkman P. 0. Box 1831 Combustion Engineering, Inc.
San Diego, California 92112 12300 Twinbrook Parkway, Suite 300 Rockville, Maryland 20852 Resident Inspector/San Onofre NPS U.S. NRC Alan R. Watts, Esq.
P. 0. Box 4329 Rourke & Woodruff San Clemente, California 92672 701 S. Parker St. No. 7000 Orange, California 92668-4702 Mayor City of San Clemente Mr. Sherwin Harris San Clemente, California 92672 Resource Project Manager Public Utilities Department Chairman City of Riverside Board of Supervisors 3900 Main Street County of San Diego Riverside California 92522 1600 Pacific Highway Room 335 San Diego, California 92101 Mr. Phil Johnson U.S. Nuclear Regulatory Commission Regional Administrator, Region V Region V U.S. Nuclear Reaulatory Commission 1450 Maria Lane, Suite 210 1450 Maria Lane, Suite 210 Walnut Creek, California 94589 Walnut Creek, California 94596 Mr. Richard J. Kosiba, Project Manager Mr. John Hickman, Senior Health Bechtel Power Corporation Physicist 12440 E. Imperial Highway Environmental Radioactive Mqmt. Unit Norwalk, California 90650 Environmental Management Branch State Department of Health Services Charles R. Kocher, Esq.
714 P Street, Room 616 James A. Beoletto, Esq.
Sacramento, California 95814 Southern California Edison Company Irvine Operations Center Mr. Don Womeldorf 23 Parker Chief Environmental Management Irvine, California 92718 California Department of Health 714 P Street, Room 616 Sacramento, California 95814
March 12, 1990 Messrs Ray and Cotton
- 2 The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under Pub. L.96-511.
Please contact us if you should have any questions regarding this matter.
Sincerely, original signed by James E. Tatum James E. Tatum, Project Manager Project Directorate V Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION Docket iTe P. Shea NRC & Local PDRs E. Jordan PDV Reading M. Boyle J. Zwolinski OGC C. Trammell ACRS (10)
J. Tatum J. Flack L. Kokajko
- See previous concurrence DRSP/P S /PDV RSP/PDV
/AD/PDV PShea As tum:sg Kokajko WT'ammell 3/O /90
/
/90 3?/90 3//90
[GEN LTR 74463/4/51