ML13322B059

From kanterella
Jump to navigation Jump to search

Ack Receipt of 60-day Response to Generic Ltr 88-20 Re Individual Plant Exam.Nrc Will Contact Licensee Should Plan &/Or Schedule Be Considered Unacceptable
ML13322B059
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/29/1989
From: Trammell C
Office of Nuclear Reactor Regulation
To: Ray H
Southern California Edison Co
References
GL-88-020, TAC-74463, TAC-74464, TAC-74465 NUDOCS 8912080008
Download: ML13322B059 (4)


Text

  • November 29, 1989 Docket Nos. 50-206, 50-361 DISTRIBUTION and 50-362 Docket File NRC & LPDRs CTrammell (2)

Mr. Harold B. Ray JLee Vice President OGC-White Flint Southern California Edison Company PD5 Plant File Irvine Operations Center EJordan 23 Parker ACRS (10)

Irvine, California 92718 JTatum (2)

LKokajko MBoyle

Dear Mr. Ray:

JFlack

SUBJECT:

RECEIPT OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE), SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1, 2 AND 3 (TAC NO. 74463, 74464 AND 74465)

We have received your letter dated November 3, 1989, in response to the 60 day reporting requirements of Generic Letter 88-20. The staff will review your proposed IPE plan for conformance to the requirements of the generic letter and will review all of the proposed schedules together for reasonableness and to determine the impact on licensee and staff resources.

If your proposed plan and/or schedule are not acceptable, I will contact you as soon as possible to explain the staff's position. Otherwise, the staff will document the acceptability of your plan and schedule in a letter in the near future.

Please contact us if you should have any questions regarding this matter.

Sincerely, original signed by Charles M. Trammell, Senior Project Manager Project Directorate V Division of Reactor Projects -

III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page

  • see preivous concurrence DRSP/PD5*

DRSP/PD5*

DS

/5 D5 JTatum LKokajko ell:sg G

on 11/20/89 11/21/89 I

1A9 9

OFFICIAL RECORD COPY

[DOCUMENT NAME]

8912080008 891129 PDR ADOCK 05000206 P

PDC

Docket Nos. 50-206, 50-361 DISTRIBUTION and 50-362 Docket File NRC & LPDRs CTrammell (2)

Mr. Harold B. Ray JLee Vice President OGC-White Flint Southern California Edison Company PD5 Plant File Irvine Operations Center EJordan 23 Parker ACRS (10)

Irvine, California 92718 JTatum (2)

LKokajko MBoyle

Dear Mr. Ray:

JFlack

SUBJECT:

RECEIPT OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1, 2 AND 3 (TAC NO. 74463, 74464 ANY/74465)

We have received your letter dated November 3, 198 in response to the 60 day reporting requirements of Generic Letter 88-2.

The staff will review your proposed IPE plan for conformance to the r, uirements of the generic letter and will review all of the proposed sc "ules together for reasonableness and to determine the impact o licensee and staff resources.

If your proposed plan and/or schedule are t acceptable, I will contact you as soon as possible to explain the staff' position. Otherwise, the staff will document the acceptability of your lan and schedule in a letter by December 1, 1989.

Please contact us if you should hav any questions regarding this matter.

Sincerely, Charles M. Trammell, Senior Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See nex ae PD SP/PD5 DRSP/D:PD5 um CTrammell:sg GWKnighton 89

/

/89

/

/89 OF ICIAL RECORD COPY OCUMENT NAME]

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 29, 1989 Docket Nos. 50-206, 50-361 and 50-362 Mr. Harold B. Ray Vice President Southern California Edison Company Irvine Operations Center 23 Parker Irvine, California 92718

Dear Mr. Ray:

SUBJECT:

RECEIPT OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE), SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1, 2 AND 3 (TAC NO. 74463, 74464 AND 74465)

We have received your letter dated November 3, 1989, in response to the 60 day reporting requirements of Generic Letter 88-20. The staff will review your proposed IPE plan for conformance to the requirements of the generic letter and will review all of the proposed schedules together for reasonableness and to determine the impact on licensee and staff resources.

If your proposed plan and/or schedule are not acceptable, I will contact you as soon as possible to explain the staff's position. Otherwise, the staff will document the acceptability of your plan and schedule in a letter in the near future.

Please contact us if you should have any questions regarding this matter.

Sincerely, Charles M. Trammell, Senior Project Manager Project Directorate V Division of Reactor Projects -

III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Units No. 1, 2, and 3 cc David R. Pigott Mr. Gary D. Cotton Orrick, Herrington & Sutcliffe Senior Vice President The Old Federal Reserve Bank Bldg.

Engineering and Operations 400 Sansome Street San Diego Gas & Electric Company San Francisco, California 94111 101 Ash Street, P.O. Box 1831 San Diego, California 92112 Mr. Robert G. Lacy Manager, Nuclear San Diego Gas & Electric Company Mr. Charles B. Brinkman P. 0. Box 1831 Combustion Engineering, Inc.

San Diego, California 92112 12300 Twirbrook Parkway, Suite 300 Rockville, Maryland 20852 Resident Inspector/San Onofre NPS U.S. NRC Alan R. Watts, Esq.

P. 0. Box 4329 Rourke & Woodruff San Clemente, California 92672 701 S. Parker St. No. 7000 Orange, California 92668-4702 Mayor City of San Clemente Mr. Sherwin Harris San Clemente, California 92672 Resource Project Manager Public Utilities Department Chairman City of Riverside Board of Supervisors 3900 Main Street County of San Diego Riverside California 92522 1600 Pacific Highway Room 335 San Diego, California 92101 Mr. Phil Johnson U.S. Nuclear Regulatory Commiission Regional Administrator, Region V Region V U.S. Nuclear Regulatory Comniission 1450 Maria Lane, Suite 210 1450 Maria Lane, Suite 210 Walnut Creek, California 94589 Walnut Creek, California 94596 Mr. F. B. Marsh, Project Manager Mr. John Hickman, Senior Health Bechtel Power Corporation Physicist P. 0. Box 60860 Environmental Radioactive Mgmt. Unit Terminal Annex Environmental Management Branch Los Angeles, California 90060 State Department of Health Services 714 P Street, Room 616 Charles R. Kocher, Esq.

Sacramento, California 95814 James A. Beoletto, Esq.

Southern California Edison Company Mr. Don Womeldorf Irvine Operations Center Chief Environmental Management 23 Parker California Department of Health Irvine, California 92718 714 P Street, Room 616 Sacramento, California 95814