IR 05000424-13-404, 05000425-13-404, Vogtle - Cyber Security Notification Letter, Milestone 1-7 Inspection
ML13228A269
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/16/2013
From: Mark King
NRC/RGN-II/DRS/EB2
To: Tynan T
Southern Nuclear Operating Co
References
IR-13-404
Download: ML13228A269 (4)


See also: IR 05000425/2013404

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

August 16, 2013

Mr. T. E. Tynan

Vice President - Vogtle

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000424/2013404 AND

05000425/2013404)

Dear Mr. Tynan:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements

specified by the conditions of your operating license at the Vogtle Electric Generating Plant on

November 18 - 22, 2013. The inspection team will be led by Mr. David Jones, Reactor

Inspector, of the NRC RII office. The team will be composed of personnel from the NRC RII

office and personnel from the NRC office of Nuclear Security and Incident Response (NSIR).

The inspection will be conducted in accordance with Temporary Instruction (TI) 2201/004,

Inspection of Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will

be performed to evaluate and verify your ability to meet the interim milestone requirements of

the NRCs Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,

Section 54, Protection of Digital Computer and Communication Systems and Networks.

On August 12, 2013, during a telephone conversation between Mr. Kevin Walden of your staff,

and Miss Melana Singletary, NRC RII, our respective staff, confirmed arrangements for a three-

day information gathering onsite visit and a one-week onsite inspection. The schedule is as

follows:

  • Information gathering visit: October 8 - 10, 2013
  • Onsite inspection: November 18 - 22, 2013

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with the Vogtle Electric Generating

Plant Cyber Security Program and plant layout; and (3) arrange administrative details, such as

office space, availability of knowledgeable office personnel and to ensure unescorted site

access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

Enclosure transmitted herewith contain SUNSI. When separated from enclosure, this

transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Tynan 2

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than September 20, 2013. Group

II lists information and possible areas for discussion necessary to assist the inspectors during

the TI inspection. It is requested this information be available during the information gathering

visit (Oct 8, 2013). Group III consists of those items that the inspectors will review, or need

access to, during the TI inspection. Group III also lists the information necessary to aid the

inspectors in tracking questions and answers identified as a result of the TI inspection. It is

requested that this information be provided to the lead inspector as the information is generated

during the TI inspection. It is important that all of these documents are up to date and complete

in order to minimize the number of additional documents requested during the preparation

and/or the onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Jones at (404) 997-4631, or me at (404) 997-4511.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Michael F. King, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

Enclosure:

Document Request For Cyber Security

Temporary Instruction (TI) 2201/004

Interim Milestones 1-7 Inspection

(OFFICIAL USE ONLY)

cc: (See page 3)

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

___ML13228A269______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS RII:DRS

SIGNATURE RA RA

NAME JONES KING SINGLETARY

DATE 8/ /2013 8/16/2013 8/ 16 /2013

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Tynan 3

cc:

Keith Wooten

Project Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

David Burford

Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

L. B. Hogg

Nuclear Licensing

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway

Birmingham, AL 35242

K. C. Dyar

Security Manager

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830