Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML12285A2652012-10-0101 October 2012 Attachment 4 - MHI Document L5-04GA564 - Tube Wear of Unit-3 RSG, Technical Evaluation Report Project stage: Request ML12285A2672012-10-0101 October 2012 Attachment 4: SG Tube Wear Analysis for Unit-2/3 Project stage: Request ML12285A2662012-10-0101 October 2012 Attachment 4: Appendix-2 Attachment-1, Tube-to-TSP Wear Depth Diagram for Unit-2/3 Project stage: Request ML12285A2642012-10-0101 October 2012 Attachment 3 - Areva Document 51-9180143-001 - SONGS Unit 3 February 2012 Leaker Outage Steam Generator Condition Monitoring Report Project stage: Request ML12285A2682012-10-0202 October 2012 Attachment 6 - Appendix B: SONGS U2C17 - Steam Generator Operational Assessment for Tube-to-Tube Wear Project stage: Request ML12285A2692012-10-0202 October 2012 Attachment 6: Appendix a: Estimates of FEI-Induced Ttw Rates Project stage: Request ML12285A2632012-10-0303 October 2012 Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation Project stage: Request ML12338A1102012-11-30030 November 2012 Email, Request for Additional Information Southern California Edison'S Response to Nrc'S Confirmatory Action Letter (CAL) 4-12-001 Dated March 27, 2012 Project stage: RAI ML12341A1122012-12-0707 December 2012 Notice of Meeting with Southern California Edison to Discuss Its Response to Nrc'S Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12347A0662012-12-0707 December 2012 Revised Notice of 12/18/12 Meeting with Southern California Edison to Discuss Its Response to Nrc'S Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12345A4272012-12-10010 December 2012 Revised Email, Request for Additional Information Review of Southern California Edison'S Response to Nrc'S 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12353A0972012-12-13013 December 2012 LTR-12-0795 - E-mail Don Leichtling Concerns Media Alert - Nuclear News - NRR Forthcoming Meeting with Southern California Edison Company Project stage: Meeting ML12352A3852012-12-18018 December 2012 Licensee Slides for 12/18/12 Public Meeting Project stage: Meeting ML12352A4112012-12-18018 December 2012 NRC Slides for 12/18/12 Meeting with Southern California Edison Project stage: Meeting ML12356A1982012-12-20020 December 2012 Email, Request for Additional Information, Round 3, Review of Southern California Edison'S Response to Nrc'S 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML13009A3492013-01-0808 January 2013 Response to Request for Additional Information Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2512013-01-0909 January 2013 Response to Request for Additional Information (RAI 30) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2492013-01-0909 January 2013 Response to Request for Additional Information (RAI 15) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13015A0042013-01-10010 January 2013 Response to Request for Additional Information (RAI 16), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A0882013-01-16016 January 2013 Response to Request for Additional Information (RAI 19) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4132013-01-17017 January 2013 Response to Request for Additional Information (RAIs 10 and 17) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4812013-01-18018 January 2013 Response to Request for Additional Information (RAI 13), Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4082013-01-18018 January 2013 Response to Request for Additional Information (RAI 12), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4112013-01-21021 January 2013 Response to Request for Additional Information (RAI 11) Regarding Confirmatory Action Letter Response (TAC Me 9727) Project stage: Response to RAI ML13022A4052013-01-21021 January 2013 Response to Request for Additional Information (RAI 28), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13028A0982013-01-24024 January 2013 Response to Request for Additional Information (RAI 18) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4752013-01-25025 January 2013 Response to Request for Additional Information (RAI 27) Regarding Confirmatory Action Letter Project stage: Response to RAI ML13028A4742013-01-25025 January 2013 Response to Request for Additional Information (RAIs 5, 7, and 9) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13032A0092013-01-29029 January 2013 Response to Request for Additional Information (RAI 14) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13037A1122013-01-31031 January 2013 Response to Request for Additional Information (RAI 29) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13053A3672013-02-0101 February 2013 E-mail, Draft Request for Additional Information Southern California Edison'S Response to Nrc'S Confirmatory Action Letter Project stage: Draft RAI ML13038A0102013-02-0404 February 2013 Response to Request for Additional Information (RAI 8) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13038A0092013-02-0404 February 2013 Response to Request for Additional Information (RAI 6) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13039A2782013-02-0606 February 2013 Response to Request for Additional Information (RAIs 20, 21, 22, 23, 24, 26 & 31), Confirmatory Action Letter Project stage: Response to RAI ML13039A3172013-02-0707 February 2013 Response to Request for Additional Information (RAI 25) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13050A1892013-02-14014 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response, Concerning Steam Generator Tubes Project stage: Supplement ML13051A1972013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Cover Through Page 227 of 415 Project stage: Other ML13051A1992013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Page 228 of 415 Through End Project stage: Other ML13046A1232013-02-15015 February 2013 2/27/2013 Notice of Forthcoming Meeting with Southern California Edison Company to Discuss Confirmation Action Letter Project stage: Meeting ML13051A1932013-02-18018 February 2013 Enclosure 5, L5-04GA585, Rev. 2, Analytical Evaluations for Operational Assessment Project stage: Other ML13051A1922013-02-18018 February 2013 Enclosure 4, L5-04GA567, Rev. 6, Evaluation of Stability Ratio for Return to Service Project stage: Other ML13051A1902013-02-18018 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response to Address Steam Generator Tube Degradation Project stage: Supplement ML13056A0922013-02-20020 February 2013 Email, Draft Request for Additional Information Nos. 38-52, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter Project stage: Draft RAI ML13053A1732013-02-21021 February 2013 Email, Draft Request for Additional Information, Nos. 53-67, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter Project stage: Draft RAI ML13053A1842013-02-21021 February 2013 Draft Request for Additional Information, Nos. 53-67, Southern California Edison'S Response to Nrc'S Confirmatory Action Letter Project stage: Draft RAI ML13058A0262013-02-25025 February 2013 Response to Request for Additional Information (Rals 2, 3, and 4) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13056A6012013-02-25025 February 2013 Response to Request for Additional Information (RAI 32) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13059A1572013-02-27027 February 2013 Licensee Slides from 2/27/13 Meeting Regarding a Request for Additional Information Project stage: Meeting ML13059A1522013-02-27027 February 2013 NRC Meeting Slides from 2/27/13 Public RAI Meeting Project stage: RAI ML13074A7932013-03-14014 March 2013 Operational Assessment for 100% Power Case Regarding Confirmatory Action Letter Response Project stage: Other 2013-01-25
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff ML22348A0322022-11-30030 November 2022 NRR E-mail Capture - Request to Resume Endangered Species Act Section 7 Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22348A0532022-11-30030 November 2022 NRC to National Marine Fisheries Service (Nmfs), Request to Resume Endangered Species Act Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22278A0182022-10-0404 October 2022 (SONGS) Unit 2 Reactor Head and Closure of Commitments Related to Peaceful Use of Foreign Technology- Acknowledge Receipt ML22265A2122022-09-22022 September 2022 Request for Additional Information for Exemption Request from 100m 72.106(B) Requirement, Docket Nos 50-206, 50-361, and 50-362 ML22119A2422022-04-29029 April 2022 Riv FOLLOW-UP Response: Question About April 11 San Onofre Event ML22034A9962022-02-0202 February 2022 S. Morris Response to C. Langley-Questions About Moving SNF at San Onfre ML21280A1022021-12-0606 December 2021 NRC to NMFS, Supplement to Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21277A2342021-09-30030 September 2021 NMFS to NRC, Receipt of Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21242A0602021-09-30030 September 2021 NRC to NMFS, Request to Initiate Consultation for SONGS Decommissioning ML21117A3492021-03-30030 March 2021 March 30, 2021, Email from Public Watchdogs on Providing New Information to Its October 13, 2020, 2.206 Petition ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21068A2712021-03-0909 March 2021 Request for Additional Information Regarding Biological Opinion - SONGS- EPID L-2021-LLL-0006 ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20302A3252020-10-21021 October 2020 E-Mail: Acknowledgement of Receipt to the Petitioner Regarding SCE Use of Hi-Storm at SONGS ML20233A7342020-08-18018 August 2020 LTR-20-0313 David Victor, San Onofre Nuclear Generating Station (SONGS) Community Engagement Panel, Chair, Et Al., Letter Independent Spent Fuel Storage Installation Security at SONGS and Recent SONGS Community Engagement Panel Meeting on O ML20224A0172020-08-0707 August 2020 8-7-20 Corrected Hearing Time - Intervenor SCEs Acknowledgement of Oral Argument Notice (9th Cir.)(Case No. 20-70899) ML20224A0182020-08-0707 August 2020 8-7-20 Intervenor SCEs Acknowledgement of Oral Argument Notice (9th Cir.)(Case No. 20-70899) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20198M4522020-07-15015 July 2020 Supplement to Public Watchdogs 2.206 Petition ML20163A3402020-05-0505 May 2020 Email Transmission - Peaceful Use Commitments State Dept for SONGS Rx Heads and Steam Generators ML20120A0282020-04-28028 April 2020 4-28-20 Notice of Addition of James Adler as Attorney for NRC (9th Cir.)(Case No. 20-70899) ML20076A5742020-03-11011 March 2020 Response to A.Mcnally San Onofre Canisters (LTR-20-0003) ML20062F5762020-02-28028 February 2020 Public Watchdogs 10 CFR 2.206 Petition - NRC E-mail to Petitioner Regarding Petition Screening Results February 28, 2020 ML20063M3092020-02-28028 February 2020 Public Watchdogs 10 CFR 2.206 Petition - Response from Petitioner to NRC E-mail Regarding Petition Screening Results, February 28, 2020 ML20059M2292020-02-25025 February 2020 OEDO-20-00053 2.206 Petition - Flooding Likely to Create Radioactive Geysers at SONGS ML20049A0802020-02-14014 February 2020 Public Watchdogs 10 CFR 2.206 Petition - E-mail to Petitioner on Immediate Actions Request Determination February 14, 2020 ML20007E5342020-01-0606 January 2020 Oceansiders Initial Assessment & Public Meeting Response E-Mail ML20006D7012019-12-23023 December 2019 Public Watchdogs 10 CFR 2.206 Petition SONGS - Petitioner Request for Public Meeting and NRC Response - December 23, 2019 ML19354B6762019-12-20020 December 2019 2.206 Petition Initial Assessment Notification E-Mail ML19325C5902019-11-20020 November 2019 2.206 Petition Status Notification Email ML19326B2392019-11-18018 November 2019 Public Watchdogs 10 CFR 2.206 Petition SONGS - Screened-in and PRB November 18, 2019 ML19319B6262019-11-0808 November 2019 Oceansiders 2.206 Petition Immediate Action Response E-Mail ML19326A7122019-10-30030 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS Receipt of Exhibits October 30, 2019 ML19326A9692019-10-25025 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS Immediate Action Determination October 25, 2019 ML19326A3602019-10-23023 October 2019 Public Watchdogs 10 CFR 2.206 Petition - SONGS First E-mail to Petitioner October 23, 2019 ML19284B3232019-10-0808 October 2019 Response LTR-19-0351 Kalene Walker, E-mail Concerns About Critical Safety Problems with Holtec Nuclear Waste Storage System at San Onofre ML19344C7842019-09-0303 September 2019 Response from NEIMA Local Community Advisory Board Questionnaire 09-03-2019 RSCS ML19344C7212019-08-30030 August 2019 Response from NEIMA Local Community Advisory Board Questionnaire 08-30-2019 J Steinmetz ML19214A1362019-08-0202 August 2019 Riv Pao Response to Mr. Langley Response to Inquiry ML19217A1862019-08-0202 August 2019 E-Mail from M. Layton/Nrc to K. Walker/Public San Onofre - SONGS Special Inspection - Damaged Canisters ML19221B4122019-07-30030 July 2019 Southern California Edison Company, Southern California Nuclear Generating Station, E-mail from Charles Langley to Scott Morris, NRC, Redundant Drop Protection Features at SONGS ML19210D4292019-07-29029 July 2019 E-Mail from M. Layton/Nrc to D. Gilmore/Public Reply to E-Mail Questions ML19213A1072019-07-29029 July 2019 Reply to Mr. Langley Re. Redundant Drop Protection Feature at SONGS ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A1102019-06-11011 June 2019 SONGS Webinar (6-3-2019) Message - Sarah Akerson ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A4432019-06-0404 June 2019 Southern California Edison Company; Scratches on Nuclear Storage Canisters at San Onofre Pose No Problems, NRC Says After Its Own Analysis - Orange County Register ML19156A1422019-06-0404 June 2019 LTR-19-0218 Donna Gilmore, Sanonofresafety.Org, E-mail Scratches on Nuclear Storage Canisters at San Onofre 2024-01-15
[Table view] |
Text
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Dec 14, 2012 10:08 PAPER NUMBER: LTR- 12-0795 LOGGING DATE: 12/14/2012 ACTION OFFICE:
E10pD EDO 4 DEDMIRT Don CaptD DEDR AUTHOR: DEDCM AFFILIATION: AFF UNK AO ADDRESSEE: Chairman Resource mcfzu W.,eO
SUBJECT:
Concerns media alert - Nuclear News - NRR forthcoming meeting with Southern California Edison Company (Tac No. ME9727)
ACTION: Appropriate DISTRIBUTION, LETTER DATE: 12/13/2012 ACKNOWLEDGED No SPECIAL HANDLING: Assigned to EDO/OPA.
See suggestion for handling questions from the public.
NOTES:
FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:
~rv~P~A11ý W- Q)I -1 Saq -0
I Joosten, Sandy From: Capt.D [captddd@gmail.com]
Sent: Thursday, December 13, 2012 5:43 PM To: CHAIRMAN Resource
Subject:
Fwd: Media Alert: Nuclear News - Office of Nuclear Reactor Regulation FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON COMPANY (TAC NO. ME9727)
Attachments: Media Alert 12-12-13.docx Sorry, my first attempt did not work!
Allison I hope you can attend at least part of the meeting and ask a question or two as posted on the NRC blog:
There's a long way to go on San Onofre restart review
+
Suggestion: These meetings should also include the best previously "submitted" questions besides taking some calls from the general public, especially since even one technical question could take a minute to pose to the meeting members! These questions could be emailed to the NRC in advance for posting on a blog, where others might be able to comment upon them increasing their popularity, which then could be used to choose the ones to ask at the meeting!
Best Don aka CaptD (619) 296-9928
Forwarded message------
From: Capt.D <captdddaigrmail.com>
Date: Thu, Dec 13, 2012 at 1:52 PM
Subject:
Media Alert: Nuclear News - Office of Nuclear Reactor Regulation FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON COMPANY (TAC NO. ME9727)
To: Capt D <captdddkgmail.com>
December 13, 2012 MEDIA ALERT
Contact:
Contact: Don Leichtling (619) 296-9928 or Ace Hoffman (760) 720-7261 The DAB Safety Team, Thursday, Dec. 13 Nuclear News - Office of Nuclear Reactor Regulation FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON COMPANY (TAC NO. ME9727) 1
SAN DIEGO, December 13, 2012 - What exactly caused the 2 new SCE $680,000,000 replacement steam generators at SONGS to fail so soon after being installed?
WHY: The purpose of the meeting is to discuss the U.S. Nuclear Regulatory Commission (NRC) staff's review of Southern California Edison's (SCE's) October 3,2012, response to the NRC's March 27,2012, Confirmatory Action Letter and Return to Service report for San Onofre Nuclear Generating Station, Unit 2.
WHEN: Tuesday, December 18, 2012 1:00 p.m. - 4:00 p.m. EST (10:00 a.m. - 1:00p.m. PST)
WHERE: U.S. Nuclear Regulatory Commission One White Flint North Commissioners' Hearing Room 1555 Rockville Pike Rockville, Maryland 20852 WHO: Participants from the NRC include staff members from the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Regulatory Research (RES).
WHAT: Interested members of the public can participate in this meeting via Webcast link or toll-free audio teleconference. The Webcast link can be accessed at: http://video.nrc.gov.This link to the NRC webcast page will permit the user to select the meeting to be viewed and the viewing speed. The meeting link will become active approximately one hour prior to meeting start. The teleconference bridge number is 888*677-3916; passcode 47860. Callers will initially be placed in a "listen only" status. At the designated point in the agenda, two-way calling will be enabled, so that the public may ask questions of the NRC staff regarding the meeting discussions.
Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact:
MEETING CONTACTS: Randy Hall, NRR 301-415-4032 randy.hallonrc.gov Brian Benney, NRR 301-415-2767 brian.benneyvnrc.gov 2
The DAB Safety Team: Don, Ace and a BATTERY of safety-conscious San Onofre insiders plus industry experts from around the world who wish to remain anonymous. These volunteers assist the DAB Safety Team by sharing knowledge, opinions and insight but are in no way responsible for the contents of the DAB Safety Team's reports. We continue to work together as a Safety Team to prepare additional San Onofre Papers, which explain in detail why a SONGS restart is unsafe at any power level. For more information from The DAB Safety Team, please visit the link above.
Our Mission: To prevent a Trillion Dollar Eco-Disaster like Fukushima, from happening in the USA.
3
December 13, 2012 MEDIA ALERT
Contact:
Contact: Don Leichtling (619) 296-9928 or Ace Hoffman (760) 720-7261L]
The DAB Safety Team, Thursday, Dec. 13 Nuclear News - Office of Nuclear Reactor Regulation FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON COMPANY (TAC NO. ME9727)
SAN DIEGO, December 13, 2012 - What exactly caused the 2 new SCE $680,000,000 replacement steam generators at SONGS to fail so soon after being installed?
WHY: The purpose of the meeting is to discuss the U.S. Nuclear Regulatory Commission (NRC) staffs review of Southern California Edison's (SCE's) October 3,2012, response to the NRC's March 27,2012, Confirmatory Action Letter and Return to Service report for San Onofre Nuclear Generating Station, Unit 2.
WHEN: Tuesday, December 18, 2012 1:00 p.m. - 4:00 p.m. EST (10:00 a.m. - 1:00p.m. PST)
WHERE: U.S. Nuclear Regulatory Commission One White Flint North Commissioners' Hearing Room 1555 Rockville Pike Rockville, Maryland 20852 WHO: Participants from the NRC include staff members from the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Regulatory Research (RES).
WHAT: Interested members of the public can participate in this meeting via Webcast link or toll-free audio teleconference. The Webcast link can be accessed at: http://video.nrc.gov.This link to the NRC webcast page will permit the user to select the meeting to be viewed and the viewing speed.
The meeting link will become active approximately one hour prior to meeting start. The teleconference bridge number is 888*677-3916; passcode 47860. Callers will initially be placed in a "listen only" status. At the designated point in the agenda, two-way calling will be enabled, so that the public may ask questions of the NRC staff regarding the meeting discussions.
Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact:
MEETING CONTACTS: Randy Hall, NRR 301-415-4032 randy.hall@nrc.gov Brian Benney, NRR 301-415-2767 brian.benney@nrc.gov The DAB Safety Team: Don, Ace and a BATTERY of safety-conscious San Onofre insiders plus industry experts from around the world who wish to remain anonymous. These volunteers assist the DAB Safety Team by sharing knowledge, opinions and insight but are in no way responsible for the contents of the DAB Safety Team's reports. We continue to work together as a Safety Team to prepare additional San Onofre Papers, which explain in detail why a SONGS restart is unsafe at any power level. For more information from The DAB Safety Team, please visit the link above.
Our Mission: To prevent a Trillion Dollar Eco-Disaster like Fukushima, from happening in the USA.