ML12118A139

From kanterella
Jump to navigation Jump to search
Units 2 & 3 Components, Portions Outside of Scope
ML12118A139
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/20/2012
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2011-0157
Download: ML12118A139 (1)


Text

p.

Outside of Scope F,

- - - - Rod The Units 2 & 3 Emergency Diesel Generator (EDGS) remained "Red" for the first quarter the first of 2010. Though performance has shown signs of improvement (no failures during failures due to reliability improvements not quarter) the system is still susceptible to system due to outage extension). The other drivers being implemented (two scheduled AOTs moved of system health are U3 being in a(1) status, overall performance and reliability being is expected to unacceptable and an open volume of ACE/RCE corrective actions. System improve to "Yellow" with continued positive performance and a subset of reliability iJmnrnu=mpnty imnlemented Outside of Scope

~js2 7