Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARML12118A1392012-04-20020 April 2012 Units 2 & 3 Components, Portions Outside of Scope Project stage: Request ML12285A2672012-10-0101 October 2012 Attachment 4: SG Tube Wear Analysis for Unit-2/3 Project stage: Request ML12285A2652012-10-0101 October 2012 Attachment 4 - MHI Document L5-04GA564 - Tube Wear of Unit-3 RSG, Technical Evaluation Report Project stage: Request ML12285A2662012-10-0101 October 2012 Attachment 4: Appendix-2 Attachment-1, Tube-to-TSP Wear Depth Diagram for Unit-2/3 Project stage: Request ML12285A2642012-10-0101 October 2012 Attachment 3 - Areva Document 51-9180143-001 - SONGS Unit 3 February 2012 Leaker Outage Steam Generator Condition Monitoring Report Project stage: Request ML12285A2682012-10-0202 October 2012 Attachment 6 - Appendix B: SONGS U2C17 - Steam Generator Operational Assessment for Tube-to-Tube Wear Project stage: Request ML12285A2692012-10-0202 October 2012 Attachment 6: Appendix a: Estimates of FEI-Induced Ttw Rates Project stage: Request ML12285A2632012-10-0303 October 2012 Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation Project stage: Request ML12335A2972012-11-28028 November 2012 LTR-12-0728 - Ltr. Ricardo Nicol Concerns Restart of San Onofre Nuclear Generating Station Project stage: Request ML12338A1102012-11-30030 November 2012 Email, Request for Additional Information Southern California Edisons Response to NRCs Confirmatory Action Letter (CAL) 4-12-001 Dated March 27, 2012 Project stage: RAI ML12341A1122012-12-0707 December 2012 Notice of Meeting with Southern California Edison to Discuss Its Response to NRCs Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12347A0662012-12-0707 December 2012 Revised Notice of 12/18/12 Meeting with Southern California Edison to Discuss Its Response to NRCs Confirmatory Action Letter and Return to Service Report for San Onofre Nuclear Generating Station, Unit 2 Project stage: Meeting ML12345A4272012-12-10010 December 2012 Revised Email, Request for Additional Information Review of Southern California Edisons Response to NRCs 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12353A0972012-12-13013 December 2012 LTR-12-0795 - E-mail Don Leichtling Concerns Media Alert - Nuclear News - NRR Forthcoming Meeting with Southern California Edison Company Project stage: Meeting ML12352A3852012-12-18018 December 2012 Licensee Slides for 12/18/12 Public Meeting Project stage: Meeting ML12352A4112012-12-18018 December 2012 NRC Slides for 12/18/12 Meeting with Southern California Edison Project stage: Meeting ML12356A1982012-12-20020 December 2012 Email, Request for Additional Information, Round 3, Review of Southern California Edisons Response to NRCs 3/27/2012 Confirmatory Action Letter (CAL) 4-12-001 and Return to Service Report Project stage: RAI ML12361A0652012-12-26026 December 2012 Request for Additional Information Regarding Response to Confirmatory Action Letter Project stage: RAI ML13009A3492013-01-0808 January 2013 Response to Request for Additional Information Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2492013-01-0909 January 2013 Response to Request for Additional Information (RAI 15) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13014A2512013-01-0909 January 2013 Response to Request for Additional Information (RAI 30) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13015A0042013-01-10010 January 2013 Response to Request for Additional Information (RAI 16), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A0882013-01-16016 January 2013 Response to Request for Additional Information (RAI 19) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4132013-01-17017 January 2013 Response to Request for Additional Information (RAIs 10 and 17) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4812013-01-18018 January 2013 Response to Request for Additional Information (RAI 13), Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13022A4082013-01-18018 January 2013 Response to Request for Additional Information (RAI 12), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13018A4452013-01-18018 January 2013 Natural Resources Defense Councils Amicus Response in Support of Friends of the Earth Opening Brief Project stage: Request ML13022A4052013-01-21021 January 2013 Response to Request for Additional Information (RAI 28), Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13022A4112013-01-21021 January 2013 Response to Request for Additional Information (RAI 11) Regarding Confirmatory Action Letter Response (TAC Me 9727) Project stage: Response to RAI ML13028A0982013-01-24024 January 2013 Response to Request for Additional Information (RAI 18) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4742013-01-25025 January 2013 Response to Request for Additional Information (RAIs 5, 7, and 9) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13028A4752013-01-25025 January 2013 Response to Request for Additional Information (RAI 27) Regarding Confirmatory Action Letter Project stage: Response to RAI ML13032A0092013-01-29029 January 2013 Response to Request for Additional Information (RAI 14) Regarding Confirmatory Action Letter Response (TAC No. Me 9727) Project stage: Response to RAI ML13037A1122013-01-31031 January 2013 Response to Request for Additional Information (RAI 29) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13053A3672013-02-0101 February 2013 E-mail, Draft Request for Additional Information Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13038A0102013-02-0404 February 2013 Response to Request for Additional Information (RAI 8) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13038A0092013-02-0404 February 2013 Response to Request for Additional Information (RAI 6) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13039A2782013-02-0606 February 2013 Response to Request for Additional Information (RAIs 20, 21, 22, 23, 24, 26 & 31), Confirmatory Action Letter Project stage: Response to RAI ML13039A3172013-02-0707 February 2013 Response to Request for Additional Information (RAI 25) Regarding Confirmatory Action Letter Response Project stage: Response to RAI ML13050A1892013-02-14014 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response, Concerning Steam Generator Tubes Project stage: Supplement ML13051A1992013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Page 228 of 415 Through End Project stage: Other ML13046A1232013-02-15015 February 2013 2/27/2013 Notice of Forthcoming Meeting with Southern California Edison Company to Discuss Confirmation Action Letter Project stage: Meeting ML13051A1972013-02-15015 February 2013 Enclosure 6, LTR-SGDA-12-36, Rev. 3, Flow-Induced Vibration and Tube Wear Analysis of the San Onofre Nuclear Generating Station Unit 2 Replacement Steam Generators Supporting Restart. Cover Through Page 227 of 415 Project stage: Other ML13051A1902013-02-18018 February 2013 Supplemental Document Submittal Regarding Confirmatory Action Letter Response to Address Steam Generator Tube Degradation Project stage: Supplement ML13051A1922013-02-18018 February 2013 Enclosure 4, L5-04GA567, Rev. 6, Evaluation of Stability Ratio for Return to Service Project stage: Other ML13051A1932013-02-18018 February 2013 Enclosure 5, L5-04GA585, Rev. 2, Analytical Evaluations for Operational Assessment Project stage: Other ML13056A0922013-02-20020 February 2013 Email, Draft Request for Additional Information Nos. 38-52, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13053A1842013-02-21021 February 2013 Draft Request for Additional Information, Nos. 53-67, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13053A1732013-02-21021 February 2013 Email, Draft Request for Additional Information, Nos. 53-67, Southern California Edisons Response to NRCs Confirmatory Action Letter Project stage: Draft RAI ML13056A6012013-02-25025 February 2013 Response to Request for Additional Information (RAI 32) Regarding Confirmatory Action Letter Response Project stage: Response to RAI 2013-01-21
[Table View] |
Text
.,
SOUTHERN CALIFORNIA J EDISON° An EDISON INTERNATIONAL Company Proprietary Information Withhold from Public Disclosure Richard J. St. Onge Director, Nuclear Regulatory Affairs and Emergency Planning January 9, 2013 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-361 Response to Request for Additional Information (RAI 30)
Regarding Confirmatory Action Letter Response (TAC No. ME 9727)
San Onofre Nuclear Generating Station, Unit 2
References:
- 1. Letter from Mr. Elmo E. Collins (USNRC) to Mr. Peter T. Dietrich (SCE), dated March 27, 2012, Confirmatory Action Letter 4-12-001, San Onofre Nuclear Generating Station, Units 2 and 3, Commitments to Address Steam Generator Tube Degradation
- 2. Letter from Mr. Peter T. Dietrich (SCE) to Mr. Elmo E. Collins (USNRC), dated October 3, 2012, Confirmatory Action Letter - Actions to Address Steam Generator Tube Degradation, San Onofre Nuclear Generating Station, Unit 2
- 3. Letter from Mr. James R. Hall (USNRC) to Mr. Peter T. Dietrich (SCE), dated December 26, 2012, Request for Additional Information Regarding Response to Confirmatory Action Letter, San Onofre Nuclear Generating Station, Unit 2
Dear Sir or Madam,
On March 27, 2012, the Nuclear Regulatory Commission (NRC) issued a Confirmatory Action Letter (CAL) (Reference 1) to Southern California Edison (SCE) describing actions that the NRC and SCE agreed would be completed to address issues identified in the steam generator tubes of San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. In a letter to the NRC dated October 3, 2012 (Reference 2), SCE reported completion of the Unit 2 CAL actions and included a Return to Service Report (RTSR) that provided details of their completion.
By letter dated December 26, 2012 (Reference 3), the NRC issued Requests for Additional Information (RAIs) regarding the CAL response. Enclosure 2 of this letter provides the response to RAI 30. of this submittal contains proprietary information. SCE requests that this proprietary enclosure be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). provides a notarized affidavit from Mitsubishi Heavy Industries (MHI), which sets Proprietary Information Withhold from Public Disclosure Decontrolled Upon Removal From Enclosure 2 P.O. Box 128 San Clemente, CA 92672
~E7~ 4,
Proprietary Information Withhold from Public Disclosure Document Control Desk January 9, 2013 forth the basis on which the information in Enclosure 2 may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed by paragraph (b)(4) of 10 CFR 2.390. Enclosure 3 provides the non-proprietary version of Enclosure 2.
There are no new regulatory commitments contained in this letter. If you have any questions or require additional information, please call me at (949) 368-6240.
Sincerely,
Enclosures:
- 1. Notarized Affidavits
- 2. Response to RAI 30 (Proprietary)
- 3. Response to RAI 30 (Non-proprietary) cc:
E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 R. E. Lantz, Branch Chief, Division of Reactor Projects, NRC Region IV Proprietary Information Withhold from Public Disclosure Decontrolled Upon Removal From Enclosure 2
ENCLOSURE 1 Notarized Affidavits
MITSUBISHI HEAVY INDUSTRIES, LTD.
AFFIDAVIT I, Jinichi Miyaguchi, state as follows:
- 1. I am Director, Nuclear Plant Component Designing Department, of Mitsubishi Heavy Industries, Ltd. ("MHI"), and have been delegated the function of reviewing the referenced AREVA's technical documentations to determine whether they contain MHI's information that should be withheld from public disclosure pursuant to 10 C.F.R. § 2.390 (a)(4) as trade secrets and commercial or financial information that is privileged or confidential.
- 2. In accordance with my responsibilities, I have reviewed MHI's letter "MHI/SCE-1 2-0161:
Figure of Percentage of Tube Wear vs. Maximum Interstitial Velocity (Reply to RAI #30)"
and have determined that it contains MHI proprietary information that should be withheld from public disclosure. Those pages containing proprietary information have been bracketed with an open and closed bracket as shown here "[ I" / and should be withheld from public disclosure pursuant to 10 C.F.R. § 2.390 (a)(4).
- 3. The information identified as proprietary in the documents has in the past been, and will continue to be, held in confidence by MHI and its disclosure outside the company is limited to regulatory bodies, customers and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and is always subject to suitable measures to protect it from unauthorized use or disclosure.
- 4.
The basis for holding the referenced information confidential is that it describes unique design, manufacturing, experimental and investigative information developed by MHI and not used in the exact form by any of MHI's competitors.
This information was developed at significant cost to MHI, since it is the result of an intensive MHI effort.
- 5. The referenced information was furnished to the Nuclear Regulatory Commission
("NRC") in confidence and solely for the purpose of information to the NRC staff.
- 6. The referenced information is not available in public sources and could not be gathered readily from other publicly available information.
Other than through the provisions in paragraph 3 above, MHI knows of no way the information could be lawfully acquired by organizations or individuals outside of MHI.
- 7.
Public disclosure of the referenced information would assist competitors of MHI in their design and manufacture of nuclear plant components without incurring the costs or risks associated with the design and the manufacture of the subject component. Therefore, disclosure of the information contained in the referenced document would have the following negative impacts on the competitive position of MHI in the U.S. and world nuclear markets:
A.
Loss of competitive advantage due to the costs associated with development of technologies relating to the component design, manufacture and examination.
Providing public access to such information permits competitors to duplicate or mimic the methodology without incurring the associated costs.
B.
Loss of competitive advantage of MHI's ability to supply replacement or new heavy components such as steam generators.
I declare under penalty of perjury that the foregoing affidavit and the matters stated therein are true and correct to the best of my knowledge, information and belief.
Executed on this _-,___
day of
..(*-,
2012.
Jinichi Miyaguchi,
/
Director-Nuclear Plant Component Designing Department Mitsubishi Heavy Industries, LTD Sworn to and subscribed Before me this 2 Y day of NotryMPu,2012 Notary Public y' /~aS~l~ii~fl K..;:
.rtic ga a3 I~ ~
-:N-1 373 DEC. 2 8, 2012 My Commission Expires
xI X.
-x -
P$
14
-X.
xf lif
!x xý
)11 x
E
~
1 2.....
10 x-X
- --x x.-
-f z 'A 14 T04 0
x--
x1 X.
19
.4 q<
x-0 0 0 0 0 0 0 0 0 0 0 0 0 x-----------
On&
Registered Number 3 7 6
! 1; Date D E C, L" NOTARIAL CERTIFICATE This is to certify that JINICHI MIYAGUCHI, Director-Nuclear Plant Component Designing Department MITSUBISHI HEAVY INDUSTRIES, LTD has affixed his signature in my very presence to the attached document.
ý
)4 11 AldI SN{f1irS
&i 1<~
obe, japaia
'r/ t,, 0, ý J-"
ý' tL' 14ýdoltoc MASAHIKO KUBOTA Notary 44 Akashimachi, Chuo-Ku, Kobe, Japan Kobe District Legal Affairs Bureau (fft-2)
ENCLOSURE 3 SOUTHERN CALIFORNIA EDISON RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING RESPONSE TO CONFIRMATORY ACTION LETTER DOCKET NO. 50-361 TAC NO. ME 9727 Response to RAI 30 (NON-PROPRIETARY)
Page 1
RAI 30
Reference 1, Figure 8 Provide similar figure for maximum interstitial velocities.
Response
The following figure shows the percentage of tubes with tube-to-tube wear (TTW) indications at each range of maximum interstitial velocity at 100% power. In the figure, 2A, 2B, 3A and 3B represent steam generators (SGs) 2E089, 2E088, 3E089 and 3E088, respectively. As indicated in Table 8-3 of Reference 1, operating Unit 2 at 70% power reduces the maximum interstitial velocity in the SG secondary side to well below the velocities which resulted in TTW at 100%
power.
Page 2